Department of Energy October 2012 – Federal Register Recent Federal Regulation Documents

Results 51 - 100 of 229
Notice of Commission Staff Attendance
Document Number: 2012-26140
Type: Notice
Date: 2012-10-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
Document Number: 2012-26139
Type: Notice
Date: 2012-10-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Tennessee Gas Pipeline Company, L.L.C.; Notice of Application
Document Number: 2012-26138
Type: Notice
Date: 2012-10-24
Agency: Department of Energy, Federal Energy Regulatory Commission
WBI Energy Transmission, Inc.; Notice of Request Under Blanket Authorization
Document Number: 2012-26137
Type: Notice
Date: 2012-10-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Public Service Company of Colorado; Notice of Technical Conference
Document Number: 2012-26135
Type: Notice
Date: 2012-10-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Reliability Standards for Geomagnetic Disturbances
Document Number: 2012-26131
Type: Proposed Rule
Date: 2012-10-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Under section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) proposes to direct the North American Electric Reliability Corporation (NERC), the Commission- certified Electric Reliability Organization, to submit for approval Reliability Standards that address the impact of geomagnetic disturbances (GMD) on the reliable operation of the Bulk-Power System. The Commission proposes to do this in two stages. In the first stage, the Commission proposes to direct NERC to file, within 90 days of the effective date of a final rule in this proceeding, one or more Reliability Standards that require owners and operators of the Bulk- Power System to develop and implement operational procedures to mitigate the effects of GMDs consistent with the reliable operation of the Bulk-Power System. In the second stage, the Commission proposes to direct NERC to file, within six months of the effective date of a final rule in this proceeding, one or more Reliability Standards that require owners and operators of the Bulk-Power System to conduct initial and on-going assessments of the potential impact of GMDs on Bulk-Power System equipment and the Bulk-Power System as a whole. Based on those assessments, the Reliability Standards would require owners and operators to develop and implement a plan so that instability, uncontrolled separation, or cascading failures of the Bulk-Power System, caused by damage to critical or vulnerable Bulk-Power System equipment, or otherwise, will not occur as a result of a GMD. This plan cannot be limited to operational procedures or enhanced training alone, but should, subject to the needs indentified in the assessments, contain strategies for protecting against the potential impact of GMDs based on factors such as the age, condition, technical specifications, or location of specific equipment. These strategies could include automatically blocking geomagnetically induced currents from entering the Bulk-Power System, instituting specification requirements for new equipment, inventory management, and isolating certain equipment that is not cost effective to retrofit. This second stage would be implemented in phases, focusing first on the most critical Bulk-Power System assets.
Combined Notice of Filings
Document Number: 2012-26120
Type: Notice
Date: 2012-10-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Revisions to Reliability Standard for Transmission Vegetation Management
Document Number: 2012-26112
Type: Proposed Rule
Date: 2012-10-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Pursuant to section 215 of the Federal Power Act, the Commission proposes to approve Reliability Standard FAC-003-2 (Transmission Vegetation Management), submitted by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. The proposed Reliability Standard would expand the applicability of the standard to include overhead transmission lines that are operated below 200 kV, if they are either an element of an Interconnection Reliability Operating Limit or an element of a Major WECC Transfer Path. In addition, the proposed Reliability Standard incorporates a new minimum annual vegetation inspection requirement, and incorporates new minimum vegetation clearance distances into the text of the standard. The Commission also proposes to approve the three definitions, the implementation plan and the Violation Severity Levels associated with the proposed Reliability Standard. Finally, the Commission proposes to direct that NERC revise the Violation Risk Factor for Requirement R2, and approve the remainder of the Violation Risk Factors.
Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities
Document Number: 2012-26111
Type: Rule
Date: 2012-10-24
Agency: Department of Energy, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission affirms its basic determinations in Order Nos. 1000 and 1000-A, amending the transmission planning and cost allocation requirements established in Order No. 890 to ensure that Commission-jurisdictional services are provided at just and reasonable rates and on a basis that is just and reasonable and not unduly discriminatory or preferential. This order affirms the Order No. 1000 transmission planning reforms that: Require that each public utility transmission provider participate in a regional transmission planning process that produces a regional transmission plan; provide that local and regional transmission planning processes must provide an opportunity to identify and evaluate transmission needs driven by public policy requirements established by state or federal laws or regulations; improve coordination between neighboring transmission planning regions for new interregional transmission facilities; and remove from Commission-approved tariffs and agreements a federal right of first refusal. This order also affirms the Order No. 1000 requirements that each public utility transmission provider must participate in a regional transmission planning process that has: A regional cost allocation method for the cost of new transmission facilities selected in a regional transmission plan for purposes of cost allocation and an interregional cost allocation method for the cost of new transmission facilities that are located in two neighboring transmission planning regions and are jointly evaluated by the two regions in the interregional transmission coordination process required by this Final Rule. Additionally, this order affirms the Order No. 1000 requirement that each cost allocation method must satisfy six cost allocation principles.
Combined Notice of Filings #1
Document Number: 2012-26110
Type: Notice
Date: 2012-10-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #2
Document Number: 2012-26106
Type: Notice
Date: 2012-10-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Environmental Management Site-Specific Advisory Board, Northern New Mexico
Document Number: 2012-26057
Type: Notice
Date: 2012-10-23
Agency: Department of Energy
This notice announces a combined meeting of the Environmental Monitoring, Surveillance and Remediation Committee and Waste Management Committee of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico (known locally as the Northern New Mexico Citizens' Advisory Board [NNMCAB]). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Secretary of Energy Advisory Board
Document Number: 2012-26056
Type: Notice
Date: 2012-10-23
Agency: Department of Energy
This notice announces an open meeting of the Secretary of Energy Advisory Board (SEAB). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770 requires that public notice of these meetings be published in the Federal Register.
DOE/NSF High Energy Physics Advisory Panel
Document Number: 2012-26054
Type: Notice
Date: 2012-10-23
Agency: Department of Energy
This notice announces a meeting of the DOE/NSF High Energy Physics Advisory Panel (HEPAP). Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.
Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation
Document Number: 2012-25907
Type: Notice
Date: 2012-10-22
Agency: Department of Energy
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
State Energy Advisory Board (STEAB)
Document Number: 2012-25906
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Energy Efficiency and Renewable Energy
This notice announces a teleconference call of the State Energy Advisory Board (STEAB). The Federal Advisory Committee Act (Pub. L. 92-463; 86 Stat.770) requires that public notice of these meetings be announced in the Federal Register.
Robert D. Willis Hydropower Rate
Document Number: 2012-25905
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Southwestern Power Administration
Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00-001.00D, effective January 22, 2010, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-64, which increases the power rate for the Robert Douglas Willis Hydropower Project (Willis) pursuant to the Willis Rate Schedule which supersedes the existing rate schedule.
Combined Notice of Filings
Document Number: 2012-25889
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #2
Document Number: 2012-25886
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2012-25885
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2012-25884
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Commission Information Collection Activities (FERC-922); Comment Request
Document Number: 2012-25817
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Federal Energy Regulatory Commission
In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 USC 3507(a)(1)(D), the Federal Energy Regulatory Commission (Commission or FERC) is submitting the new information collection FERC-922, ``Performance Metrics in Regions Outside ISOs and RTOs,'' to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission issued a Notice in the Federal Register (77 FR 12832, 3/2/2012) requesting public comments. FERC received a comment from Edison Electric Institute (EEI) regarding the burden estimate as discussed further below. FERC also received comments on the specific metrics. These latter comments are summarized and addressed in the Commission Staff Report. The Commission Staff Report can be obtained via the Commission's eLibrary system (at https://www.ferc.gov/docs-filing/elibrary.asp) by searching under Docket No. AD12-8. The report will not be published in the Federal Register.
Notice of Compliance Filings
Document Number: 2012-25815
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
Document Number: 2012-25814
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings
Document Number: 2012-25800
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings
Document Number: 2012-25799
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2012-25798
Type: Notice
Date: 2012-10-22
Agency: Department of Energy, Federal Energy Regulatory Commission
Records Governing Off-the-Record Communications
Document Number: 2012-25797
Type: Notice
Date: 2012-10-19
Agency: Department of Energy, Federal Energy Regulatory Commission
Relocation of Transmission Lines for the U.S. 93 Boulder City Bypass Project, Boulder County, NV, Record of Decision (DOE/EIS-0490)
Document Number: 2012-25783
Type: Notice
Date: 2012-10-19
Agency: Department of Energy, Western Area Power Administration
The Federal Highway Administration (FHWA) prepared an Environmental Impact Statement (EIS) for a proposal to improve the United States Highway 93 (U.S. 93) corridor through Henderson and Boulder City, Nevada, from the Foothills Road grade separation on U.S. 93/95 in Henderson to the western end of the Hoover Dam Bypass project near the Hacienda Hotel and Casino. Western Area Power Administration (Western), an agency within the Department of Energy (DOE), needs to modify its transmission system and facilities to accommodate the construction of the Boulder City Bypass Project (Project). Western was a cooperating agency for the EIS. Western will ensure that its responsibilities under the National Historic Preservation Act (NHPA) and the Endangered Species Act (ESA) are met before the modifications are implemented.
Notice of Commission Staff Attendance
Document Number: 2012-25684
Type: Notice
Date: 2012-10-19
Agency: Department of Energy, Federal Energy Regulatory Commission
Office of Energy Efficiency and Renewable Energy
Document Number: 2012-25636
Type: Notice
Date: 2012-10-18
Agency: Department of Energy
The U.S. Department of Energy (DOE) is hereby granting an Amended Waiver of section 1605 of the American Reinvestment and Recovery Act of 2009 (Recovery Act Buy American provisions) in EERE- funded projects for (1) Enphase microinverters and (2) pre-insulated district heating pipe systems. This amendment withdraws the nonavailability waiver issued on August 11, 2010 for Enphase micro-inverters, and the nonavailability waiver issued March 27, 2012 for pre-insulated district heating pipe systems.
Environmental Management Site-Specific Advisory Board, Hanford
Document Number: 2012-25628
Type: Notice
Date: 2012-10-18
Agency: Department of Energy
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Hanford. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Southern LNG Company, L.L.C.; Application for Long-Term Authorization To Export Liquefied Natural Gas Produced From Domestic Natural Gas Resources to Non-Free Trade Agreement Countries for a 20-Year Period
Document Number: 2012-25536
Type: Notice
Date: 2012-10-17
Agency: Department of Energy
The Office of Fossil Energy (FE) of the Department of Energy (DOE) gives notice of receipt of an application (Application) filed on August 31, 2012, by Southern LNG Company, L.L.C. (Southern LNG), requesting long-term, multi-contract authorization to export up to 4 million tons per annum (mtpa) of liquefied natural gas (LNG), the equivalent of 182.5 billion cubic feet (Bcf) of natural gas per year or 0.5 Bcf per day (Bcf/d), over a 20-year period, commencing on the earlier of the date of first export or ten years from the date the requested authorization is granted. The LNG would be exported from the LNG terminal in Chatham County, Georgia, near the City of Savannah (Elba Island Terminal) to any country (1) with which the United States does not have a free trade agreement (FTA) requiring national treatment for trade in natural gas, (2) which has developed or in the future develops the capacity to import LNG via ocean-going carrier, and (3) with which trade is not prohibited by U.S. law or policy. The source of the LNG will be from direct connects with the interstate pipelines of Southern Natural Gas Company, L.L.C., Elba Express Company, L.L.C., Carolina Gas Transmission Corporation, and the indirect connects with interstate pipelines of Transcontinental Gas Pipe Line Company, LLC and Florida Gas Transmission, LLC. Southern LNG is requesting this authorization to export LNG both on its own behalf and as agent for other parties who hold title to the LNG at the point of export. The Application was filed under section 3 of the Natural Gas Act (NGA). Protests, motions to intervene, notices of intervention, and written comments are invited.
Combined Notice of Filings
Document Number: 2012-25533
Type: Notice
Date: 2012-10-17
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #2
Document Number: 2012-25532
Type: Notice
Date: 2012-10-17
Agency: Department of Energy, Federal Energy Regulatory Commission
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.