Department of Energy March 2005 – Federal Register Recent Federal Regulation Documents
Results 201 - 250 of 274
Notice of Exemption Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Environmental Management Site-Specific Advisory Board, Savannah River
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EMSSAB), Savannah River. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Agency Information Collection Activities: Proposed Collection; Comment Request
The EIA is soliciting comments on the proposed revision and three-year extension under section 3507(h)(1) of the Paperwork Reduction Act of 1995 of the surveys in the Natural Gas Data Collection Program Package. The surveys covered by this request include: Form EIA-176, ``Annual Report of Natural and Supplemental Gas Supply and Disposition'' EIA-191, ``Monthly and Annual Underground Gas Storage Report'' EIA-857, ``Monthly Report of Natural Gas Purchases and Deliveries to Consumers'' EIA-895, ``Monthly and Annual Quantity and Value of Natural Gas Production Report'' (The EIA proposes to eliminate the current monthly reporting of Form EIA-895 and only require an annual report.) EIA-910, ``Monthly Natural Gas Marketer Survey'' EIA-912, ``Weekly Underground Natural Gas Storage Report'' In addition, EIA is proposing that the following new survey be approved by OMB. EIA-913, ``Monthly and Annual Liquefied Natural Gas (LNG) Storage Report''
Application to Export Electric Energy; Duke Energy Trading and Marketing, L.L.C.
Duke Energy Trading and Marketing, L.L.C. (DETM) has applied to renew its authority to transmit electric energy from the United States to Mexico pursuant to section 202(e) of the Federal Power Act.
Agency Information Collection Activities: Submission for OMB Review; Comment Request
The EIA has submitted the Residential Energy Consumption Survey to the Office of Management and Budget (OMB) for review and a reinstatement under section 3507(h)(1) of the Paperwork Reduction Act of 1995 (Pub. L. 104-13) (44 U.S.C. 3501 et seq.).
Withdrawal of Notice of Intent To Prepare an Environmental Impact Statement GenPower, New York, L.L.C.
On February 6, 2002, the Department of Energy (DOE) announced its intent to prepare an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act of 1969 (NEPA) for GenPower New York, L.L.C.'s (GenPower) request for a Presidential permit for a proposed international electric transmission line. The proposed Federal action in this EIS was to grant GenPower a Presidential permit for the construction, operation, maintenance, and connection of a submarine cable originating in Goldboro, Nova Scotia, Canada, and terminating in New York City, New York. The EIS would have evaluated the potential environmental impacts associated with the proposed Federal action and reasonable alternatives. In a letter dated February 17, 2005, GenPower notified DOE that as a result of market conditions, it has decided not to undertake the project and has withdrawn its application for a Presidential permit. Therefore, further preparation of an EIS is not necessary. The notice of intent to prepare an EIS is withdrawn and the NEPA process is hereby terminated.
Application To Export Electric Energy; Duke Energy Trading and Marketing, L.L.C.
Duke Energy Trading and Marketing, L.L.C. (DETM) has applied to renew its authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act.
Wanapa Energy Center; Notice of Availability of Record of Decision (ROD)
This notice announces the availability of the ROD to implement the proposed action identified in the Wanapa Energy Center Final Environmental Impact Statement (DOE/EIS-0342, December 2004). Under the proposed action, Bonneville will offer contract terms for interconnection of the Wanapa Energy Center with the Federal Columbia River Transmission System, as requested by the Confederated Tribes of the Umatilla Indian Reservation. The proposed project involves constructing and operating a 1,200-megawatt, natural gas-fired, combined-cycle power generation facility at a 47-acre site on tribal trust land near the Cities of Hermiston and Umatilla in Umatilla County, Oregon. Wanapa may construct this project in phases. A new switchyard will be constructed at the Wanapa site, and Bonneville will construct a new 500-kilovolt single-circuit transmission line from this switchyard 4.4 miles west to Bonneville's existing McNary Substation, which Bonneville will expand by about 2.75 acres on the east side.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.