Engineers Corps January 2009 – Federal Register Recent Federal Regulation Documents
Results 1 - 9 of 9
Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the Sacramento River Bank Protection Project Phase II Supplemental Authority providing for implementation of up to 80,000 linear feet of additional bank protection in the Sacramento River Flood Control Project area, Butte, Colusa, Contra Costa, Glenn, Placer, Sacramento, Solano, Sutter, Tehama, Yolo, and Yuba Counties, CA
The action being taken is the preparation of a joint environmental impact statement/environmental impact report (EIS/EIR) for the Sacramento River Bank Protection Project (SRBPP) Phase II Supplemental Authority. The SRBPP Phase II Supplemental Authority will result in the implementation of an additional 80,000 linear feet of bank protection in the Sacramento River Flood Control Project area, as authorized by the Water Resources Development Act (WRDA) of 2007. The SRBPP Phase II Supplemental Authority is located in the Sacramento River Flood Control Project (SRFCP) area, consisting of the Sacramento River and its Tributaries, CA.
Notice of Intent To Prepare an Environmental Impact Statement/Environmental Impact Report for the West Sacramento Levee Improvements Program, West Sacramento, CA
The action being taken is the preparation of a programmatic and project-specific Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the West Sacramento Levee Improvements Program (WSLIP) in Yolo County and Solano County, CA. Under 33 U.S.C. 408, the Chief of Engineers grants permission to alter an existing flood control structure if it is not injurious to the public interest and does not impair the usefulness of such work. Under Section 404 of the Clean Water Act, the District Engineer permits the discharge of dredged or fill material into waters of the United States if the discharge meets the requirements for the Environmental Protection Agency's 404(b)(1) guidelines and is not contrary to the public interest. The U.S Army Corps of Engineers (Corps) will consider granting both 408 permission to the Central Valley Flood Protection Board (CVFPB) and 404 permit to West Sacramento Area Flood Control Agency (WSAFCA) for their work on the WSLIP. The CVFPB and WSAFCA are requesting this permission and permit in order to reduce flood risk the City of West Sacramento by meeting the following objectives for the project: Achieve a minimum of a 200-year level (an event that has a 0.5% chance of occurring in any given year) of flood protection for the entire City by improving approximately 50 miles of levees that protect it; Construct levee improvements as soon as possible to reduce flood risk as quickly as possible; and, Provide recreational and open space elements for the City that are compatible with flood improvement actions.
Notice of Intent To Prepare an Environmental Impact Statement for the Missouri River Ecosystem Restoration Plan, Missouri River Basin, United States
Pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended and in furtherance of the Water Resources Development Act of 2007, the U.S. Army Corps of Engineers, Kansas City and Omaha Districts, intend to prepare the Missouri River Ecosystem Restoration Plan and Environmental Impact Statement (plan/EIS). In developing the plan, the Corps must study actions required to mitigate habitat losses of aquatic and terrestrial habitat, recover federally listed species under the Endangered Species Act and restore ecosystem functions to prevent further declines among other native species. During an extended scoping process, we will invite comment on the draft purpose and need statements for the plan/EIS. The plan/EIS will describe a range of alternatives for achieving the purpose of the plan and assess the effects of those alternatives, including a preferred alternative, on the human environment as defined by NEPA. The goal of this planning effort is to develop and implement a single, comprehensive and integrated plan to guide the implementation of programs associated with mitigation, recovery, and restoration activities in the Missouri River Basin.
Flood Control, Mississippi River & Tributaries, Yazoo River Basin, Yazoo Headwaters Project, Mississippi Tributaries Unit
The U.S. Army Corps of Engineers, Vicksburg District, in conjunction with the Yazoo-Mississippi Delta Levee District, the non- Federal sponsor, is undertaking studies to evaluate the authorized Yazoo Headwaters Project. As part of this work, a Supplemental Environmental Impact Statement (SEIS) is being prepared to update existing National Environmental Policy Act documentation.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Proposed Beluga to Fairbanks (B2F) Natural Gas Transportation Pipeline Proposed by the Alaska Natural Gas Development Authority (ANGDA)
The Alaska District, U.S. Army Corps of Engineers (Corps) intends to prepare a Draft Environmental Impact Statement (DEIS) to address the potential impacts associated with the construction of the proposed Beluga to Fairbanks (B2F) Alaska natural gas transportation pipeline. The Corps will be evaluating a permit application for work under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. The Environmental Impact Statement (EIS) will be used as a basis for the permit decision and to ensure compliance with the National Environment Policy Act.
Inland Waterways Users Board
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting.
Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the River Mile 208, Sacramento River Bank Protection Project, CA
The U.S. Army Corps of Engineers, Sacramento District, intends to prepare a joint environmental impact statement/environmental impact report (EIS/EIR) for the construction of bank protection at River Mile 208 on the Sacramento River to prevent continued bank erosion and potential outflanking of the Glenn-Colusa Irrigation District Hamilton City Pumping Plant (HCPP), near Hamilton City, CA. The proposed action is being conducted under the HCPP Fish Screen Improvement Project.
Notice of Availability of the Final Environmental Impact Statement for the Proposed Stormwater Treatment Areas in Everglades Agricultural Area Located in Palm Beach and Hendry Counties, FL
The U.S. Army Corps of Engineers (USACE) is issuing this notice to advise the public that a Draft Environmental Impact Statement (Draft EIS) has been completed and is available for review and comment.
Termination of an Environmental Impact Statement for the Construction and Operation of a 300-MW Coal-Fired Electric Generating Unit Proposed by Wisconsin Power and Light Company Near Cassville in Grant County, WI
The St. Paul District, Corps of Engineers (Corps) is canceling the preparation of a federal Environmental Impact Statement (EIS) for the proposal by Wisconsin Power and Light Company (WPL) to conduct work below the ordinary high water mark of the Mississippi River, a navigable water of the U.S., and to discharge dredged or fill material into waters of the U.S. to facilitate the construction and operation of a 300 megawatt (MW) baseload coal-fired electric generating unit, referred to as NED 3, near Cassville in Grant County, WI. The Corps has terminated its review of the WPL permit application due to WPL's withdrawal of their permit application on November 21, 2008.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.