Engineers Corps February 2008 – Federal Register Recent Federal Regulation Documents

Notice of Intent To Prepare an Environmental Impact Statement for the American River Common Features General Reevaluation Report, Sacramento, CA
Document Number: E8-3922
Type: Notice
Date: 2008-02-29
Agency: Department of Defense, United States Army Corps of Engineers, Engineers Corps, Army Department
The action being taken is the preparation of an environmental impact statement (EIS) for the American River Common Features General Reevaluation Report (GRR). The Common Features Project GRR will re- evaluate the currently authorized plan as well as develop and evaluate other viable alternatives, including a locally-preferred plan, with the goal of identifying a comprehensive plan that will lower the risk of flooding in and around the City of Sacramento. The Common Features Project GRR is located in Sacramento, Sutter and Yolo Counties, CA.
Notice of Intent To Prepare an Environmental Impact Statement for 408 Permission and 404 Permit to Three Rivers Levee Improvement Authority for the Feather River Levee Repair Project, California, Segment 2
Document Number: E8-3919
Type: Notice
Date: 2008-02-29
Agency: Department of Defense, United States Army Corps of Engineers, Engineers Corps, Army Department
The action being taken is the preparation of an Environmental Impact Statement (EIS) for the issuance of both the 408 permission to the Central Valley Flood Protection Board and 404 Permit to Three Rivers Levee Improvement Authority (TRLIA) for their work on the Feather River Levee Repair Project (FRLRP). Under 33 U.S.C. 408, the Chief of Engineers grants permission to alter an existing flood control structure if it is not injurious to the public interest and does not impair the usefulness of such work. Under section 404 of the Clean Water Act, the District Engineer permits the discharge of dredged or fill material into waters of the United States if the discharge meets the requirements of the Environmental Protection Agency's 404(b)(1) guidelines and is not contrary to the public interest. The FRLRP is located in Yuba County, CA. TRLIA is requesting this permission and permit in order to complete construction along the east levee of the Feather River.
Inland Waterways Users Board
Document Number: E8-3317
Type: Notice
Date: 2008-02-22
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. Name of Committee: Inland Waterways Users Board (Board). Date: March 27, 2008. Location: Baton Rouge Marriott Hotel, 5500 Hilton Avenue, Baton Rouge, Louisiana 70808, (225-924-5000). Time: Registration will begin at 8:30 a.m. and the meeting is scheduled to adjourn at 1 p.m. Agenda: The Board will consider its project investment priorities for the next fiscal year. The Board will also hear briefings on the status of both the funding for inland navigation projects and studies, and the Inland Waterways Trust Fund, and be provided updates of various inland waterways projects.
Intent To Prepare Draft Environmental Impact Statement for Updated Water Control Manuals for the Apalachicola-Chattahoochee-Flint River Basin
Document Number: E8-3315
Type: Notice
Date: 2008-02-22
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Mobile District, intends to prepare an update and revision of the water control manuals for the Apalachicola-Chattahoochee-Flint (ACF) River Basin. Concurrent with that revision, a Draft Environmental Impact Statement (EIS) will be prepared, as required by the National Environmental Policy Act (NEPA). The Draft EIS will address updated operating criteria and guidelines for managing the water storage and release actions of agency water managers and associated environmental impacts.
Notice of Intent To Prepare a Draft Environmental Impact Statement on Rock Mining in Wetlands in Levy County, FL
Document Number: E8-2979
Type: Notice
Date: 2008-02-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) Jacksonville District intends to prepare a Draft Environmental Impact Statement (DEIS), referred to as the Tarmac King Road Limestone Mine DEIS, to evaluate potential impacts of rock mining within wetlands in southern Levy County, FL.
Notice of Intent to Grant Partially Exclusive License of U.S. Patent Application No. 11/82,432 Entitled “A Method and System for Treating Metal-Containing Fluid Emissions” and U.S. Patent Application No. 10/931,232 “Perlite Sorbents for Vapor Phase Metals and Metals Compounds” to Bouldin & Lawson, LLC
Document Number: E8-2358
Type: Notice
Date: 2008-02-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The notice published in the Federal Register on January 25, 2008 (73 FR 4544) was missing the corporation name. The partially exclusive license will be granted to Bouldin & Lawson, LLC., 70 Easy Street, McMinnville, TN 37110.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.