Notice of Intent To Prepare a Draft Environment Impact Statement for the Proposed Lone Star Ore Body Development Project in Graham County, Arizona
The U.S. Army Corps of Engineers, Los Angeles District (Corps) is examining the environmental consequences associated with Freeport- McMoRan Safford Inc.'s (FMSI) application for a Department of the Army permit under section 404 of the Clean Water Act for the proposed development of the mineral resources associated with the Lone Star ore body for the purpose of producing copper (the Lone Star Project). The proposed development would include the construction of mining facilities, including an open pit mine and attendant development rock stockpiles and heap leach facilities, which will allow continued mining at the Safford Mine Facility using conventional open-pit mining, heap leaching techniques, and solution extraction/electrowinning (SX/EW) processing, and utilizing as much of the existing Safford Mine Facility infrastructure and processing facilities as practicable. The construction of the proposed facilities would discharge fill materials into approximately 90.27 acres of waters of the United States (U.S.). The primary federal environmental concerns are the proposed discharges of fill material into waters of the U.S. and the potential for significant adverse environmental effects resulting from such activities. Therefore, to address these concerns in accordance with the National Environmental Policy Act (NEPA), the Corps is requiring preparation of an Environmental Impact Statement (EIS) prior to consideration of any permit action. The action must comply with the section 404(b)(1) Guidelines (40 CFR part 230) and not be contrary to the public interest to be granted a Corps permit. The Corps may ultimately make a determination to permit or deny the above project, or permit or deny modified versions of the above project.
Termination of Environmental Impact Statement (EIS) for the Alaska Department of Transportation & Public Facilities Foothills West Transportation Access Project
The Alaska District, U.S. Army Corps of Engineers (Corps) is notifying interested parties that it has terminated the process to develop an Environmental Impact Statement and has withdrawn the application for a Department of the Army permit from the Alaska Department of Transportation and Public Facilities (DOT&PF) proposed Foothills West Transportation Access Project (Foothills Project). The original Notice of Intent to Prepare the EIS was published in the Federal Register on May 20, 2011 (76 FR 29218).
Notice of Intent To Prepare a Draft Environmental Impact Statement (EIS), Initiate the Public Scoping Period and Host Public Scoping Meetings for the Great Lakes and Mississippi River Interbasin Study (“GLMRIS”)-Evaluation of Aquatic Nuisance Species Controls Near Brandon Road Lock and Dam: Extension of the Public Scoping Period and Announcement of an Additional Public Scoping Meeting Location
Reference the Notice of Intent published in the Federal Register on Thursday, November 20, 2014, volume 79, number 224, pages 69099-100 (79 FR 69099). This notice extends the public comment period and identifies an additional location for a GLMRIS public scoping meeting. For convenience, the SUPPLEMENTARY INFORMATION section of the November 20, 2014 notice has been reprinted with new text announcing the extension of the public comment period and the additional location where USACE will host a scoping meeting.
Intent To Prepare an Environmental Impact Statement for the East Campus Integration Program Within the Fort Meade Complex, Maryland
The Department of Defense (DoD) announces its intent to prepare an Environmental Impact Statement (EIS) as part of the environmental planning process for the East Campus Integration Program at Fort George G. Meade, Maryland (hereafter referred to as Fort Meade). The DoD proposes to develop operational complex and headquarters space at the National Security Agency's (NSA) East Campus on Fort Meade for use by NSA and the Intelligence Community. The purpose of the Proposed Action is to provide facilities that are fully supportive of the Intelligence Community's function and to continue to integrate the East Campus site with the NSA Main Campus. The need for the action is to meet mission requirements, both internally at the NSA and within the Intelligence Community. Publication of this notice begins a scoping process that identifies and determines the scope of environmental issues to be addressed in the EIS. This notice requests public participation in the scoping process and provides information on how to participate.