Request for Comments on the Notice of Intent To Prepare a Draft Environmental Impact Statement for the Skagit River General Investigation Study (Previously Advertised as the Skagit River Flood Damage Reduction Study), Skagit County, WA
Document Number: 2011-22389
Type: Notice
Date: 2011-09-01
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Corps of Engineers is extending the comment period for the Notice of Intent (NOI) to prepare a Draft Environmental Impact Statement for the Skagit River General Investigation Study (previously advertised as the Skagit River Flood Damage Reduction Study), Skagit County, Washington. This extension will provide interested persons with additional time to prepare comments on the NOI.
Availability of the Proposed Report of the Chief of Engineers and the Final Joint Environmental Impact Statement/Environmental Impact Report Within the City of San Clemente Extending 3,412 ft (1,040 m) From Linda Lane to T Street
Document Number: 2011-22386
Type: Notice
Date: 2011-09-01
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
This announces the availability of the Proposed Report of the Chief of Engineers and the Final Joint Environmental Impact Statement/ Environmental Impact Report (FEIS/R) which analyzes the potential environmental effects associated with the proposed action and alternatives for providing shoreline protection to approximately 3,412 feet ([ft], 1,040 meters [m]) of the San Clemente shoreline from coastal storms. Maintaining the beach is needed to prevent the beach erosion that results from winter storms and to prevent damage to adjacent commuter and national defense rail line that runs along the beach through the City. In addition, the loss of sand at the beach would have an impact on City beachfront structures and beach recreation, which contributes to the local economy, and would reduce the ecological functioning of the sand beach/littoral zone.
Notice of Intent To Prepare a Joint Supplemental Environmental Impact Statement and Environmental Impact Report for the Folsom Dam Modification Project, Approach Channel.
Document Number: 2011-22383
Type: Notice
Date: 2011-09-01
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The action being taken is the preparation of a joint supplemental environmental impact statement/environmental impact report (EIS/EIR) for the Folsom Dam Modification, Approach Channel Project. The EIS/EIR will be prepared in accordance with the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The U.S. Army Corps of Engineers (USACE) will serve as lead agency for compliance with NEPA, and the State of California Central Valley Flood Protection Board (CVFPB) will serve as lead agency for compliance with CEQA. The Folsom Dam Modification Project, Approach Channel will evaluate alternatives, including a locally preferred plan, for providing dam safety and flood damage reduction at Folsom Dam located downstream from the confluence of the North and South Forks of the American River near the city of Folsom, California.