Department of Defense February 2011 – Federal Register Recent Federal Regulation Documents

Final Programmatic Environmental Impact Statement (PEIS) for the Growth, Realignment, and Stationing of Army Aviation Assets
Document Number: 2011-2449
Type: Notice
Date: 2011-02-04
Agency: Department of Defense, Department of the Army
The Department of the Army announces the availability of the Final PEIS for the proposed growth, realignment, and stationing of new and existing Army aviation assets. The proposed action includes the consolidation and reorganization of existing aviation units, and the potential establishment of one or more Combat Aviation Brigades (CABs). The proposed action will increase the availability of helicopter assets to meet current and future national security requirements, and will allow the Army better to organize existing aviation assets to promote more effective training and force management. The Final PEIS evaluates the environmental impacts associated with the proposed action, which includes the stationing of aviation units, the construction and renovation of garrison facilities, and additional training activities needed to support the readiness of aviation units. In addition, the Final PEIS addresses comments received on the Draft PEIS. Land acquisition is not being considered as part of this action. The Final PEIS considers the following alternatives: Alternative 1Realign and Station Existing Aviation Elements of Up to a Full CAB or Activate and Station a New CAB at Fort Carson Colorado (CO). Under this alternative, the Army will consolidate existing aviation units not currently assigned to a CAB into a standard CAB structure at Fort Carson or activate a new CAB at Fort Carson. As part of this alternative, aviation units will conduct training on existing land at Pinon Canyon Maneuver Site (PCMS), CO, in order to maintain training proficiency and support integrated training with ground units. Land acquisition is not being considered as part of this action. Alternative 2Realign and Station Existing Aviation Elements of Up to a Full CAB or Grow, Station, and Activate a CAB at Joint Base Lewis-McChord (JBLM) Washington (WA). Under this alternative, the Army either will consolidate existing aviation units not currently assigned to a CAB into a standard CAB structure at JBLM or activate a new CAB at JBLM. As part of this alternative, aviation units will conduct training on existing training land at Yakima Training Center (YTC), WA, in order to maintain training proficiency and support integrated training with ground units. Land acquisition is not being considered as part of this action. Alternative 3 (Preferred)Implement Alternatives 1 and 2. Under this alternative, the consolidated units forming a CAB would be stationed at one installation, and the new CAB would be activated and stationed at the other installation. Fort Carson and JBLM would each gain up to one CAB. As part of this alternative, aviation units would conduct training on existing training land at the installations' training maneuver areas (PCMS for Fort Carson and YTC for JBLM) in order to maintain training proficiency and support integrated training with ground units. Land acquisition is not being considered as part of this action. Alternative 4No Action Alternative. Under this alternative, the Army would retain its aviation force structure at its current levels, configurations, and locations. Aviation units continue to be one of the Army's most stressed forces currently on 12-month deployments after every one year at home. The Army's goal is to give active-duty Soldiers two years at home for every year they're deployed. The completion of these stationing actions will provide sufficient aviation assets to allow Soldiers more time at home between deployments. Fort Carson and JBLM are the only stationing alternatives that meet all of the Army's stationing requirements for new CAB stationing. These locations have existing runways and airfields, provide adequate maneuver and airspace for CAB operations, and are equipped with existing training ranges that can support CAB training. Most importantly, Fort Carson and JBLM are the only major installations that have three or more Brigade Combat Teams but no CAB dedicated to provide aviation support for training. The proposed action would allow the Army to maximize integrated air-ground training. Land acquisition is not being considered as part of this action.
Department of Defense Personnel Security Program (PSP)
Document Number: 2011-2214
Type: Proposed Rule
Date: 2011-02-02
Agency: Department of Defense, Office of the Secretary
This rule would update policies and responsibilities for the Department of Defense (DoD) Personnel Security Program (PSP) in accordance with the provisions of current U.S. Code, Public Laws, and Executive Orders (E.O.).
Defense Federal Acquisition Regulation Supplement; Reporting of Government Property Lost, Stolen, Damaged, or Destroyed
Document Number: 2011-2044
Type: Rule
Date: 2011-02-02
Agency: Defense Acquisition Regulations System, Department of Defense
DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to require contractors to report loss of Government property to the Defense Contract Management Agency (DCMA) eTools application.
Defense Federal Acquisition Regulation Supplement; Marking of Government-Furnished Property
Document Number: 2011-2043
Type: Rule
Date: 2011-02-02
Agency: Defense Acquisition Regulations System, Department of Defense
DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to require contractors to tag, label, or mark Government-furnished property items identified in the contract as subject to serialized item management.
Notice of Availability for the Draft Programmatic Environmental Assessment for the Development and Operation of Small-Scale Wind Energy Projects at United States Marine Corps Facilities Throughout the United States
Document Number: 2011-2160
Type: Notice
Date: 2011-02-01
Agency: Department of Defense, Department of the Navy
Pursuant to Section (102)(2)(c) of the National Environmental Policy Act of 1969 (NEPA) (42 United States Code 4321), as implemented by the Council on Environmental Quality regulations for implementing the procedural provisions of NEPA (40 Code of Federal Regulations [CFR] Parts 1500-1508), and Marine Corps NEPA directives (Marine Corps Order P5090.2A), the Department of the Navy announces the availability of, and invites public comments on the Draft Programmatic Environmental Assessment (Draft PEA) for the development and operation of small-scale wind energy projects at United States Marine Corps (USMC) facilities throughout the Continental United States (CONUS). A PEA evaluates a major action on a broad, programmatic basis. Thus, site-specific NEPA analysis may be tiered off this document as appropriate. Dates and Addresses: The public comment period begins upon publication of a Notice of Availability (NOA) for the Draft PEA in the Federal Register. The comment period will last for 30 days thereafter. The Draft PEA is available for electronic viewing at https:// marines.mil/unit/marforres/MFRHQ/FACILITIES/FACILITIES.aspx, or by sending a request to Alain Flexer, USMC Marine Forces Reserves (MARFORRES), by telephone 504-678-8489, by fax 504-678-6823, by e-mail to alain.flexer@usmc.mil or by writing to: MARFORRES, Facilities, Attn: Alain Flexer, 4400 Dauphine Street, New Orleans, Louisiana 70146-5400. Comments: All comments, written or submitted via the internet, are treated equally, become part of the public record on the Draft PEA, and will be considered in the Final PEA. During the 30-day comment period, all written comments should be mailed to MARFORRES, Facilities, Attn: Alain Flexer, 4400 Dauphine Street, New Orleans, LA 70146-5400. Please submit all comments by the end of the 30-day comment period.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.