Central Electric Power Cooperative, Inc.; Notice of Intent to Hold Public Scoping Meetings and Prepare an Environmental Assessment
The Rural Utilities Service (RUS) intends to hold public scoping meetings and prepare an environmental assessment in connection with possible impacts related to a project proposed by Central Electric Power Cooperative, Inc. (CEPCI) of South Carolina. The proposal consists of the construction of approximately 20 miles of 115 kilovolt transmission line to provide more reliable transmission power to McClellanville, SC. The proposed 115-kilovolt transmission line project would be constructed within one of several alternative corridors under consideration. The alternative transmission line corridors originate at existing power delivery points near Jamestown and Charity, Berkeley County and Winyah and Belle Isle south of the city of Georgetown in Georgetown County, SC and at a potential new substation that would be built in the vicinity of the town of Honey Hill, Berkeley County, SC. The corridors terminate at the proposed location of a substation in McClellanville from which electric power distribution lines would service the community. Portions of the alternative corridors include Federal lands of the Francis Marion National Forest therefore the United States Department of Agriculture (USDA) Forest Service (FS) is a cooperating agency in the National Environmental Policy Act (NEPA) analysis. CEPCI is requesting RUS to provide financing for the proposed project.
Basin Electric Power Cooperative, Inc.; Notice of Intent To Hold Public Scoping Meetings and Prepare an Environmental Impact Statement
The Rural Utilities Service (RUS) intends to hold public scoping meetings and prepare an environmental impact statement (EIS) in connection with possible impacts related to a project being proposed by Basin Electric Power Cooperative, Inc. (Basin Electric), of Bismarck, North Dakota. The proposal consists of the construction and operation of a coal-fired electric generation facility referred to as the Dry Fork Station, consisting of a single maximum net 385 Megawatt (MW) unit, at a site in Gillette, Wyoming, and the construction of 130 miles of 230 kilovolt (kV) transmission line in Campbell and Sheridan counties, referred to as the Hughes Transmission Project.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.