Department of Agriculture May 2014 – Federal Register Recent Federal Regulation Documents
Results 1 - 50 of 114
J.R. Simplot Co.; Availability of Plant Pest Risk Assessment and Environmental Assessment for Determination of Nonregulated Status of Potato Genetically Engineered for Low Acrylamide Potential and Reduced Black Spot Bruise
We are advising the public that the Animal and Plant Health Inspection Service is making available for public comment our plant pest risk assessment and our draft environmental assessment regarding a request from the J.R. Simplot Company seeking a determination of nonregulated status of potatoes designated as InnateTM potatoes (events E12, E24, F10, F37, J3, J55, J78, G11, H37, and H50), which have been genetically engineered for low acrylamide potential (acrylamide is a human neurotoxicant and potential carcinogen that may form in potatoes and other starchy foods under certain cooking conditions) and reduced black spot bruise. We are soliciting comments on whether this genetically engineered potato is likely to pose a plant pest risk.
Syngenta Seeds, Inc., and Bayer CropScience AG; Availability of Plant Pest Risk Assessment, Environmental Assessment, Preliminary Finding of No Significant Impact, and Preliminary Determination of Nonregulated Status of Soybean Genetically Engineered for Herbicide Resistance
We are advising the public that the Animal and Plant Health Inspection Service has prepared a preliminary determination regarding a request from Syngenta Seeds, Inc., and Bayer CropScience AG seeking a determination of nonregulated status of soybean designated as SYHTOH2, which has been genetically engineered for resistance to the herbicide glufosinate and p-hydroxyphenylpyruvate dioxygenase inhibiting herbicides such as isoxaflutole and mesotrione. We are also making available for public review our plant pest risk assessment, environmental assessment, and preliminary finding of no significant impact for the preliminary determination of nonregulated status.
Monsanto Company and Forage Genetics International; Availability of a Plant Pest Risk Assessment and Environmental Assessment for Determination of Nonregulated Status of Genetically Engineered Alfalfa
We are advising the public that the Animal and Plant Health Inspection Service is making available for public comment our plant pest risk assessment and our draft environmental assessment regarding a request from the Monsanto Company and Forage Genetics International seeking a determination of nonregulated status of alfalfa designated as event KK179, which has been genetically engineered to express reduced levels of guaiacyl lignin. We are soliciting comments on whether this genetically engineered alfalfa is likely to pose a plant pest risk.
Viruses, Serums, Toxins, and Analogous Products; Standard Requirements; Addition of Terminology To Define Veterinary Biologics Test Results
We are proposing to amend the veterinary biological product regulations by defining the terms used for reporting the results of tests performed on veterinary biological products. Licensees and permittees of veterinary biological products must conduct these tests and report the results to the Animal and Plant Health Inspection Service so that the Agency can determine if the products are eligible for release. Defining these terms would clarify the circumstances under which the results of a prescribed test can be reported as satisfactory, unsatisfactory, inconclusive, or a No Test. We are also proposing to remove several obsolete testing standard requirements from part 113. These changes would update our regulations and improve communication between regulators and product licensees and permittees with respect to reporting test results.
In Vitro Tests for Serial Release
We are amending the ``In vitro tests for serial release'' regulations by removing a footnote that refers to one method to calculate the relative antigen content of inactivated veterinary biological products and relative potency calculation software available from Veterinary Services' Center for Veterinary Biologics (CVB). CVB will no longer provide or update the software and the written method for using the software will no longer be used. This action will update the regulations.
Notice of Request for Extension of Approval of an Information Collection; Karnal Bunt; Importation of Wheat and Related Articles
In accordance with the Paperwork Reduction Act of 1995, this notice announces the Animal and Plant Health Inspection Service's intention to request an extension of approval of an information collection associated with the regulations for the importation of wheat and related articles from regions affected with Karnal bunt.
Notice of Funding Availability and Grant Application Deadlines
The Rural Utilities Service (RUS), an agency of the United States Department of Agriculture (USDA), published a notice of funds availability concerning the Distance Learning and Telemedicine (DLT) Grant Program for the Fiscal Year (FY) 2014 competition. The document contained incorrect information with regard to the deadline for electronic submissions.
Notice of Availability of Draft Environmental Impact Statement for the Proposed Smoky Canyon Mine, Panels F and G Lease and Mine Plan Modification Project, Caribou County, ID
In accordance with the National Environmental Policy Act of 1969 (NEPA), the Bureau of Land Management (BLM) and the U.S. Department of Agriculture, Forest Service (USFS), Caribou-Targhee National Forest (CTNF), have prepared a Draft Environmental Impact Statement (EIS) for the proposed Smoky Canyon Mine, Panels F and G Lease and Mine Plan Modification Project, and by this Notice announce the opening of the comment period.
El Dorado County Resource Advisory Committee
The El Dorado County Resource Advisory Committee (RAC) will meet in Placerville, California. The committee is authorized under the Secure Rural Schools and Community Self-Determination Act (Pub. L. 110- 343) (the Act) and operates in compliance with the Federal Advisory Committee Act. The purpose of the committee is to improve collaborative relationships and to provide advice and recommendations to the Forest Service concerning projects and funding consistent with the title II of the Act. The meetings are open to the public. The purpose of the meeting is to review operational procedures, evaluate project proposals, prioritize a list of projects for funding in FY 2014, and vote to recommend projects for funding.
Revision of the Land Management Plans for the Helena and Lewis and Clark National Forests
The Helena and Lewis and Clark National Forests, located in Montana, are initiating the forest planning process pursuant to the 2012 Forest Planning Rule. One assessment and one plan will be developed for both Forests. This process results in a Forest Land Management Plan which describes the strategic direction for management of forest resources for the next ten to fifteen years on the Helena and Lewis and Clark National Forests. The first phase of the process, the assessment phase, is beginning and interested parties will be invited to contribute in the development of the assessment (36 CFR 219.6). The Forests will host open houses, exact dates and times will be posted on the listed below. The assessment is expected to be completed in December 2014. The trends and conditions identified in the assessment will help inform the need for change. With this notice, the Forests invite other governments, non-governmental parties, and the public to help us identify new information on exisiting forest conditions for consideration in the assessement.
Basin Electric Power Cooperative, Inc.: Notice of Availability of a Final Environmental Impact Statement
The Rural Utilities Service (RUS), an agency within the U.S. Department of Agriculture (USDA), has prepared a Final Environmental Impact Statement (FEIS) to meet its responsibilities under the National Environmental Policy Act (NEPA), RUS's implementing regulations, 7 CFR part 1794, and other applicable environmental requirements related to providing financial assistance for Basin Electric Power Cooperative's (Basin Electric) proposed Antelope Valley Station (AVS) to Neset 345-kV Transmission Project (Project) in North Dakota. RUS will also use the FEIS to meet its responsibilities under Section 106 of the National Historic Preservation Act, 16 U.S.C. 470, and its implementing regulations, ``Protection of Historic Properties'' (36 CFR part 800). The FEIS addresses the construction, operation, and maintenance of approximately 278 miles of new 345-kV single pole transmission line, a 230-kV single pole transmission line, and a double circuit 345/115-kV transmission line, 4 new substations and a switchyard, modifications to 4 existing substations, maintenance access roads, temporary construction roads, river crossings, temporary construction staging sites, and other facilities described previously in the Draft Environmental Impact Statement (DEIS) and Supplemental Draft Environmental Impact Statement (SDEIS). It also addresses comments received during the comment periods for the DEIS and the SDEIS. The overall project area encompasses parts of Dunn, McKenzie, Mercer, Mountrail, and Williams Counties in western North Dakota.
Central Electric Power Cooperative, Inc.: Notice of Availability of a Draft Environmental Impact Statement and Notice of a Public Meeting
The Rural Utilities Service (RUS), an agency within the U.S. Department of Agriculture (USDA), has issued a draft environmental impact statement (DEIS) for Central Electric Power Cooperative's (Central Electric) proposed McClellanville 115-kV Transmission Project (Project) in South Carolina. RUS is issuing the DEIS to inform the public and interested parties about the proposed Project and to invite the public to comment on the scope, proposed action, and other issues addressed in the DEIS. The DEIS addresses the construction, operation, and maintenance of Central Electric's proposed Project. The Project includes construction, operation, and maintenance of approximately 15-20 miles of new 115-kV transmission line, 1 new substation, temporary construction roads, river crossings, temporary construction staging sites, and other facilities described in the DEIS. The overall project area encompasses parts of Georgetown and Charleston counties in coastal South Carolina. Portions of Central Electric's proposed routes may affect floodplains, wetlands, cultural, historical and paleontological resources. Once a final right-of-way (ROW) is selected within the preferred route, coordination with the federal and state agencies and other interested parties would occur to identify, evaluate and if needed mitigate any adverse effects. RUS will hold a public hearing meeting to share information and receive comments on the DEIS.
Common Crop Insurance Regulations; Forage Seed Crop Provisions
The Federal Crop Insurance Corporation (FCIC) finalizes the addition of a new regulation that provides forage seed insurance. The provisions will be used in conjunction with the Common Crop Insurance Policy Basic Provisions (Basic Provisions), which contain standard terms and conditions common to most crop insurance programs. The intended effect of this action is to convert the Forage Seed pilot crop insurance program to a permanent insurance program for the 2015 and succeeding crop years.
Black Hills National Forest Advisory Board
The Black Hills National Forest Advisory Board (Board) will meet in Rapid City, South Dakota. The Board is established consistent with the Federal Advisory Committee Act of 1972 (5 U.S.C. App. II), the Forest and Rangeland Renewable Resources Planning Act of 1974 (16 U.S.C. 1600 et. seq.), the National Forest Management Act of 1976 (16 U.S.C. 1612), and the Federal Public Lands Recreation Enhancement Act (Pub. L. 108-447). Additional information concerning the Board, including the meeting summary/minutes, can be found by visiting the Board's Web site at: https://www.fs.usda.gov/main/blackhills/ workingtogether/advisorycommittees.
Kiwifruit Grown in California; Order Amending Marketing Order No. 920
This final rule amends Marketing Order No. 920 (order), which regulates the handling of kiwifruit grown in California. The amendments were proposed by the Kiwifruit Administrative Committee (Committee or KAC), which is responsible for the local administration of the order. The five amendments will provide authority to recommend and conduct production and postharvest research, to recommend and conduct market research and development projects, to receive and expend voluntary contributions, to specify that recommendations for production research and market development be approved by eight members of the Committee, and to update provisions regarding alternate members' service on the Committee. These amendments are intended to improve administration of and compliance with the order, as well as reflect current industry practices.
Peanut Standards Board
The Farm Security and Rural Investment Act of 2002 (2002 Farm Bill) requires the Secretary of Agriculture to establish a Peanut Standards Board (Board) for the purpose of advising the Secretary on quality and handling standards for domestically produced and imported peanuts. The initial Board was appointed by the Secretary and announced on December 5, 2002. USDA seeks nominations for individuals to be considered for selection as Board members for a term of office ending June 30, 2017. Selected nominees would replace three producers and three industry representatives who currently serve on the Board and who have terms of office that end on June 30, 2014. The Board consists of 18 members representing producers and the industry. In an effort to obtain diversity among candidates, USDA encourages the nomination of men and women of all racial and ethnic groups and persons with a disability.
Black Hills National Forest Advisory Board
The Black Hills National Forest Advisory Board (Board) will meet in Rapid City, South Dakota. The Board is established consistent with the Federal Advisory Committee Act of 1972 (5 U.S.C. App. II), the Forest and Rangeland Renewable Resources Planning Act of 1974 (16 U.S.C. 1600 et. seq.), the National Forest Management Act of 1976 (16 U.S.C. 1612), and the Federal Public Lands Recreation Enhancement Act (Pub. L. 108-447). Additional information concerning the Board, including the meeting summary/minutes, can be found by visiting the Board's Web site at: https://www.fs.usda.gov/main/blackhills/ workingtogether/advisorycommittees.
Oranges, Grapefruit, Tangerines, and Tangelos Grown in Florida; Relaxing Grade Requirements on Valencia and Other Late Type Oranges
This rule changes the minimum grade requirements currently prescribed under the marketing order for oranges, grapefruit, tangerines, and tangelos grown in Florida (order). The order is administered locally by the Citrus Administrative Committee (Committee). This rule reduces the minimum grade requirement for Valencia and other late type oranges shipped to interstate markets from a U.S. No. 1 to a U.S. No. 1 Golden from May 15 through June 14 each season and to a U.S. No. 2 external/U.S. No. 1 internal from June 15 through August 31 each season. This rule will provide additional Valencia and other late type oranges for late season markets, helping to maximize fresh shipments.
2014 Farm Bill Implementation Listening Session-Strategic Economic and Community Development
As part of our implementation of the Agricultural Act of 2014 (commonly referred to as the 2014 Farm Bill), Rural Development is hosting a listening session for public input about the Strategic Economic and Community Development priority funding to be made available for certain Rural Development programs. The 2014 Farm Bill contains a provision outlining the details of this priority funding in Section 6025. The listening session will provide an opportunity for stakeholders to voice their comments, concerns, or requests regarding the implementation of this priority funding. Instructions regarding registering for and attending the listening session are in the SUPPLEMENTARY INFORMATION section of this notice.
Request for Extension and Revision of a Currently Approved Information Collection
This notice announces the Grain Inspection, Packers and Stockyards Administration's (GIPSA) intention to request that the Office of Management and Budget (OMB) approve a 3-year extension of a currently approved information collection for the ``Reporting and Recordkeeping Requirements under the United States Grain Standards Act (USGSA) and under the Agricultural Marketing Act of 1946 (AMA).'' This approval is required under the Paperwork Reduction Act of 1995 (PRA).
Tongass National Forest; Alaska; Forest Plan Amendment
The Department of Agriculture, Forest Service, will prepare an environmental impact statement (EIS) that evaluates an amendment to the 2008 Tongass National Forest Plan. The Record of Decision will consider and identify changes, if any, to the current 2008 Forest Plan.
Information Collection Activity; Comment Request; Correction
The Rural Utilities Service (RUS) published a document in the Federal Register on April 16, 2014, at 79 FR 21436. The document reported an inaccurate number for the Agency's estimate of respondent burden hours for OMB Control Number 0572-0076 in connection with the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35, as amended). The Rural Utilities Service (RUS) invites comments on this information collection for which RUS intends to request approval from the Office of Management and Budget (OMB).
Announcement of the Fourth 2015 Dietary Guidelines Advisory Committee Meeting
As stipulated by the Federal Advisory Committee Act (FACA), the U.S. Department of Health and Human Services (HHS), in collaboration with the U.S. Department of Agriculture (USDA), is hereby giving notice that a meeting of the 2015 Dietary Guidelines Advisory Committee (DGAC) will be held and will be open to the public.
Process for Non-Land Grant College of Agriculture (NLGCA) Designation
Section 7101 of the Agricultural Act of 2014 requires the National Institute of Food and Agriculture (NIFA) to establish a process through which institutions may apply for designation as a NLGCA. Designation as a NLGCA is one way an institution may qualify to receive an exemption from the new matching fund requirement described in Section 7128 of the Agricultural Act of 2014. NLGCA designation also satisfies the eligibility requirement for the Capacity Building Grants for Non-Land Grant Colleges of Agriculture program, which is authorized under 7 U.S.C. 3319i. This notice outlines the criteria to qualify for NLGCA designation and the steps to obtain such designation. Additionally, McIntire- Stennis and Hispanic-serving Agricultural Colleges and Universities may opt out of their current designation and request NLGCA designation.
PSICC; Colorado; Upper Monument Creek EIS
The Pike and San Isabel National Forests Cimarron and Comanche National Grasslands (PSICC) propose to conduct forest restoration activities on 25,000 acres within the 67,000 acre Upper Monument Creek (UMC) analysis area. Treatment activities include mechanical thinning, mastication, hand thinning, and prescribed fire. The treatments will be used singularly or in combination to transition forested plant communities across the landscape towards desired future conditions that are more characteristic of a resilient forest. Resilient forests are better able to respond to large high intensity wildfires, insects and disease outbreaks, and extreme water flows that are known to occur in the project's location along Colorado's Front Range. By protecting against the aforementioned extreme events, resilient forests are better equipped to protect the following identified values at risk; adjoining private property, water quality and quantity, water conveyance facilities, transportation systems, wildlife habitats, heritage sites, municipal watersheds and timber resources, Resilient forests also help attenuate the impacts of increased noxious weeds, sedimentation, and other hydrologic disturbances In order to successfully complete the amount and types of treatments necessary for the maximum amount of resilience, the PSICC might need to amend the PSICC Land and Resource Management Plan to adjust plan standards and guidelines. Plan standards and guideline amendments might include but are not limited to the following; forest regeneration, big game winter range, wildlife habitat, and allowable levels and types of fire and fuels treatments. Proposed Land and Resource Management Plan amendments will help the PSICC achieve resiliency, and protect the values at risk within in each Land and Resource Management Plan Management Area in the Upper Monument Creek Project Area.
Agriculture Acquisition Regulation, Fire Suspension Suppression and Liability
The Office of Procurement and Property Management (OPPM) of the Department of Agriculture (USDA) amends the Agriculture Acquisition Regulation (the ``AGAR'') by adding a new clause entitled ``Fire Suppression and Liability.'' Section 8205 of the Agricultural Act of 2014 (2014 Act) provided the USDA Forest Service with permanent authority for stewardship end results contracting by adding a new section 604 to the Healthy Forests Restoration Act of 2003. Section 8205 contains a requirement that the agency use a fire liability provision in all stewardship contracts and agreements that is in substantially the same form as the fire liability provisions contained in the integrated resource timber contract in Forest Service contract numbered 2400-13, part H, section H.4. This interim rule establishes a new clause in the AGAR, the USDA supplement to the Federal Acquisition Regulation (FAR), for use in Integrated Resource Service Contracts (IRSC) subject to the FAR. This new AGAR clause addresses fire liability on stewardship contracts as requred in the 2014 Agricultural Act.
Announcement of Grant Application Deadlines
The United States Department of Agriculture's (USDA) Rural Utilities Service (RUS) announces its Fiscal Year (FY) 2014 Community Connect Grant Program application window and notice of funds availability. The NOFA announces $13 million for grants from FY 2014 and prior year appropriations. In addition, RUS announces the minimum and maximum amounts for Community Connect grants applicable for the fiscal year. The Community Connect Grant Program regulations can be found at 7 CFR part 1739, subpart A.
Announcement of Grant Application Deadlines; Deadlines and Funding Levels
The Rural Utilities Service (RUS), an agency of the United States Department of Agriculture (USDA), announces its Public Television Station Digital Transition Grant Program application window for fiscal year (FY) 2014. The FY 2014 funding for the Public Television Station Digital Transition Grant Program is $2,000,000.
Notice of Funding Availability and Grant Application Deadlines
The Rural Utilities Service (RUS), an agency of the United States Department of Agriculture (USDA), announces the availability of $19,300,000 in grant funds and solicits applications for the Distance Learning and Telemedicine (DLT) Grant Program for the Fiscal Year (FY) 2014 competition.
Dakota Prairie Grasslands; North Dakota; Environmental Impact Statement for Greater Sage-Grouse Grasslands Plan Amendment
In compliance with the National Environmental Policy Act of 1969, as amended (NEPA), the Federal Land Policy and Management act of 1976, as amended (FLPMA), and the Resources Planning Act of 1974, as amended by the National Forest Management Act of 1976 (NFMA), the Forest Service intends to prepare an environmental impact statement (EIS) to amend the Dakota Prairie Grasslands Land and Resource Management Plan (DPG LRMP). This notice is announcing the beginning of the scoping process to solicit public comments and identify issues relative to the greater sage-grouse. This analysis will be the basis of the record of decision.
Notice of Funding Availability (NOFA) for Loan Guarantees Under Section 538 Guaranteed Rural Rental Housing Program (GRRHP) for Fiscal Year 2014
This is a request for proposals for guaranteed loans under the Section 538 Guaranteed Rural Rental Housing Program (GRRHP) pursuant to 7 CFR 3565.4 for Fiscal Year (FY) 2014. The Consolidated Appropriations Act, 2014, Public Law 113-76 (January 17, 2014) appropriated $150 million in FY 2014. The commitment of program dollars will be made first to approved and complete applications from prior years' notices, then to applicants of selected responses in the order they are ranked under this Notice that have fulfilled the necessary requirements for obligation. Successful applications will be selected by the Agency for funding and subsequently awarded to the extent that funding may ultimately be made available to the Agency through appropriations. Expenses incurred in developing applications will be at the applicant's risk. The following paragraphs outline the timeframes, eligibility requirements, lender responsibilities, and the overall response and application processes. Eligible lenders are invited to submit responses for new construction and acquisition with rehabilitation of affordable rural rental housing. The Agency will review responses submitted by eligible lenders, on the lender's letterhead, and signed by both the prospective borrower and lender. Although a complete application is not required in response to this Notice, eligible lenders may submit a complete application concurrently with the response. Submitting a complete application will not have any effect on the respondent's response score.
Notice of Request for Revision of a Currently Approved Information Collection
In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), this notice announces NRCS' intention to request an extension for, and a revision to, a currently approved information collection for Long-Term Contracting.
WTO Agricultural Quantity-Based Safeguard Trigger Levels
This notice lists the updated quantity-based trigger levels for products which may be subject to additional import duties under the safeguard provisions of the WTO Agreement on Agriculture. This notice also includes the relevant period applicable for the trigger levels on each of the listed products.
Direct Single Family Housing Loans and Grants
The Rural Housing Service is amending its regulations for the section 502 direct single family housing loans program by reinstating language pertaining to payment assistance method 1 that was inadvertently changed or omitted when the payment subsidy regulation was revised on December 27, 2007. This action will make clear to the public that under this method, the amount of subsidy granted is the difference between the installment due on the promissory note and the greater of the payment amortized at the equivalent interest rate or the payment calculated based on the required floor payment.
Mendocino National Forest; Upper Lake Ranger District; California; Pine Mountain Late-Successional Reserve Habitat Protection and Enhancement Project
The Mendocino National Forest, Upper Lake Ranger District, proposes to conduct fuels reduction and habitat enhancement treatments on approximately 7,830 acres southwest of Lake Pillsbury in the Pine Mountain vicinity. The Planning Area is 10,200 acres in size and comprises both Late Successional Reserve (LSR) and Matrix land designations. Of the approximately 7,830 acres to be treated, ~5690 acres are within the Pine Mountain LSR and ~2,140 acres are in Matrix lands. The project emphasizes fuel reduction activities and habitat management for the protection and enhancement of late-successional species. The project area was chosen for treatment based on past fire history and the existing conditions that pose a threat to late- successional habitat. The Pine Mountain LSR is one of the smaller LSRs within the Forest and provides a link between the Blue Slides LSR seven miles to the southeast and the Sanhedrin LSR, 1.25 miles to the north. This LSR also provides a critical link to State and other Federal lands to the south and west. This area is currently part of Northern Spotted Owl Critical Habitat (Unit 11, Subunit ICC 5), a designated land allocation by U.S. Fish and Wildlife Service, and also includes 1.6 miles of critical habitat for anadromous fish. These habitats are located within both the LSR and matrix lands. The Project Area is located approximately 15 miles north of the town of Upper Lake, primarily in T18N, R10W, and portions of T18N, R11W; T17N, R10W; and T17N, R11W, Mount Diablo Base Meridian.
Single Family Housing Direct Loan Program
Through this action, the Rural Housing Service (RHS or Agency) proposes to amend its regulations for the section 502 direct single family housing loan program by reinstating language pertaining to payment assistance method 1 that was inadvertently changed or omitted when the payment subsidy regulation was revised on December 27, 2007. This action will make clear to the public that under this method, the amount of subsidy granted is the difference between the installment due on the promissory note and the greater of the payment amortized at the equivalent interest rate or the payment calculated based on the required floor payment.
Notice of Funding Availability for the Intermediary Relending Program
This Notice announces $18.9 million in program funding available for Fiscal Year 2014 for the Intermediary Relending Program (IRP). The IRP provides direct loans to intermediaries that establish programs for the purpose of providing loans to ultimate recipients for business facilities and community developments in a rural area. The Agency will make awards each of the remaining Federal fiscal quarters. In the event all program funds are not obligated in a quarter, the remaining unobligated funds will be carried over to the subsequent quarter. This Notice is being issued in accordance with the new requirements set forth by the Agricultural Act of 2014 (Farm Bill). The 2014 Farm Bill consolidates IRP's authority under the Consolidated Farm and Rural Development Act (Con Act). Consequently, the Agency must comply with the standard `rural' and `rural area' definition in the Con Act under 7 U.S.C. 1991(a)(13).
Notice of Funds Availability for the Rural Microentrepreneur Assistance Program for Fiscal Year 2014
This Notice announces the funds available for loans and grants under the Rural Microentrepreneur Assistance Program (RMAP) pursuant to 7 CFR part 4280, subpart D for fiscal year (FY) 2014.
Uinta-Wasatch Cache Resource Advisory Committee
In accordance with the Secure Rural Schools and Community Self-Determination Act (Pub. L. 110-343) (the Act) and the Federal Advisory Committee Act (FACA) (5 U.S.C., App. 2), the Uinta-Wasatch Cache Resource Advisory Committee (RAC) announces the solicitation of nominees to fill vacancies. The purpose of the committee is to improve collaborative relationships and to provide advice and recommendations to the Forest Service concerning projects and funding consistent with Title II of the Act. The RAC covers the Uinta-Wasatch Cache National Forest.
Automated Data Processing and Information Retrieval System Requirements: System Testing
In accordance with the Paperwork Reduction Act of 1995 (PRA), the Food and Nutrition Service (FNS) is announcing the Office of Management and Budget's (OMB) approval of information collection requirements contained in a final rule published in the Federal Register.
Notice of Request for an Extension of Approval of an Information Collection: Qualitative Feedback on Agency Service Delivery
In accordance with the Paperwork Reduction Act of 1995, this notice announces the Food Safety and Inspection Service's intention to request an extension of approval of an information collection associated with qualitative customer and stakeholder feedback on service delivery by the Food Safety and Inspection Service. The Office of Management and Budget prepared and published the first notice for comments on the original information collection.
Central Montana Resource Advisory Committee
The Central Montana Resource Advisory Committee will meet in Stanford, Montana. The committee is authorized under the Secure Rural Schools and Community Self-Determination Act (Pub. L. 110-343) (the Act) and operates in compliance with the Federal Advisory Committee Act. The purpose of the committee is to improve collaborative relationships and to provide advice and recommendations to the Forest Service concerning projects and funding consistent with the Title II of the Act. The meeting is open to the public. The purpose of the meeting is to select projects for implementation.
Notice of Intent To Request Approval To Revise and Extend an Information Collection
In accordance with the Paperwork Reduction Act of 1995, this notice announces the intent of the National Agricultural Statistics Service (NASS) to request revision and extension of a currently approved information collection, the Livestock Slaughter Survey. Revision to burden hours may be needed due to changes in the size of the target population, sampling design, and/or questionnaire length.
Notice of Request for Revision to and Extension of Approval of an Information Collection; Importation of Pine Shoot Beetle Host Material From Canada
In accordance with the Paperwork Reduction Act of 1995, this notice announces the Animal and Plant Health Inspection Service's intention to request a revision to and extension of approval of an information collection associated with the regulations for the importation of pine nursery stock and various pine products from Canada to prevent the spread of pine shoot beetle into noninfested areas of the United States.
Secretary's Advisory Committee on Animal Health; Meeting
This is a notice to inform the public of an upcoming meeting of the Secretary's Advisory Committee on Animal Health. The meeting is being organized by the Animal and Plant Health Inspection Service to discuss matters of animal health.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.