Coast Guard June 23, 2016 – Federal Register Recent Federal Regulation Documents
Results 1 - 4 of 4
Safety Zone; San Francisco Giants Fireworks, San Francisco Bay, San Francisco, CA
The Coast Guard will enforce the safety zone for the San Francisco Giants Fireworks display in the Captain of the Port, San Francisco area of responsibility during the dates and times noted below. This action is necessary to protect life and property of the maritime public from the hazards associated with the fireworks display. During the enforcement period, unauthorized persons or vessels are prohibited from entering into, transiting through, or anchoring in the safety zone, unless authorized by the Patrol Commander (PATCOM).
Waterway Suitability Assessment for Construction and Operation of Liquefied Gas Terminals; Sabine-Neches Waterway, Vidor, TX
Jefferson Railport Terminal 1 (Texas) LLC, has submitted a Letter of Intent and Preliminary Waterway Suitability Assessment to the Coast Guard Captain of the Port (COTP), Port Arthur, TX regarding the company's plans to construct, own and operate a waterfront facility handling and storing Liquefied Hazardous Gas (LHG) at its Vidor, TX facility located on the Sabine-Neches Waterway. The Coast Guard is notifying the public of this action to solicit public comments on the proposed increase in LHG marine traffic on the Sabine-Neches Waterway.
Safety Zone; Pleasure Beach Bridge, Bridgeport, CT
The Coast Guard is establishing a temporary safety zone within the Coast Guard Sector Long Island Sound (LIS) Captain of the Port (COTP) Zone. This temporary final rule is necessary to provide for the safety of life on navigable waters. Entry into, transit through, mooring, or anchoring within the safety zone is prohibited unless authorized by COTP Sector LIS.
Drawbridge Operation Regulation; Willamette River, Portland, OR
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Morrison Bridge across the Willamette River, mile 12.8, at Portland, Oregon. The deviation is necessary to accommodate Multnomah County's replacement of the bridge decking. This deviation allows the bridge to only open half of the span, single leaf, to allow for the replacement of bridge decking. The deviation also allows the vertical clearance to be reduced due to the project's containment system.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.