Coast Guard May 10, 2016 – Federal Register Recent Federal Regulation Documents
Results 1 - 5 of 5
Drawbridge Operation Regulation; Snake Creek; Islamorada, FL
The Coast Guard is modifying the operating schedule that governs the Snake Creek Bridge across Snake Creek, at Islamorada, FL. This final rule changes the drawbridge operating schedule for the Snake Creek Bridge by requiring it to open once an hour between 7 a.m. and 6 p.m. The Bridge Owner, Florida Department of Transportation and Local officials requested this action to assist in reducing vehicle traffic backups caused by bridge openings.
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway and Indian Creek, Miami, FL.
The Coast Guard proposes modifying the operating schedule that governs the West 79th Street Bridge across the Atlantic Intracoastal Waterway mile 1084.6, Miami, FL and the operating schedule that governs the East 79th Street Bridge across Miami Beach Channel, Miami, FL. This action will place the East and West 79th Street Bridges across Miami Beach Channel and Atlantic Intracoastal Waterway, Miami, FL on a twice an hour opening schedule between 7 a.m. and 7 p.m., Monday through Friday, except Federal holidays. This action is intended to reduce vehicular traffic caused by these bridges opening on demand.
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Little River to Savannah River
The Coast Guard proposes to modify the operating schedule that governs the Lady's Island Bridge, across the Beaufort River, Mile 536.0 at Beaufort, SC. This modification would allow Lady's Island Bridge to remain closed during peak vehicular traffic times. The bridge owner, South Carolina Department of Transportation, requested this action to assist in reducing traffic caused by bridge openings.
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, New Smyrna Beach, FL
The Coast Guard proposes to modify the operating schedule that governs the Coronado Beach (George Musson) Bridge across the Atlantic Intracoastal Waterway, mile 845, at New Smyrna Beach, FL. This proposed rule would change the existing 20 minute opening schedule to a 30 minute opening schedule between 7 a.m. and 7 p.m. This modification would provide some relief to vehicle traffic congestion and would have little to no effect on navigation. The proposed rule will also add the local bridge name to the regulation published in the Code of Federal Regulations, George Musson/Coronado Beach (SR44). We invite your comments on this proposed rulemaking.
Port of Miami Anchorage Area; Atlantic Ocean, Miami Beach, FL
The Coast Guard proposes to revise the Miami Anchorage. Under the proposal, the Miami Anchorage would be divided into two separate anchorage areas. This action is necessary to reduce potential damage to threatened coral posed by anchoring vessels. This proposed revision would update the regulation to clarify the regulatory text and to reflect the establishment of two anchorage areas instead of one area currently in place. We invite your comments on this proposed rulemaking.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.