Glen Canyon Dam Adaptive Management Work Group Notice of Public Meeting
The Glen Canyon Dam Adaptive Management Work Group (AMWG) makes recommendations to the Secretary of the Interior concerning Glen Canyon Dam operations and other management actions to protect resources downstream of Glen Canyon Dam consistent with the Grand Canyon Protection Act. The AMWG meets two to three times a year.
Notice of Intent to Accept Proposals, Select Lessee(s), and Contract for Pumped-Storage Hydroelectric Power Development on Anderson Ranch Reservoir, Boise Project, Idaho
Current Federal policy allows non-Federal development of electrical power resource potential on Federal water resource projects. The Bureau of Reclamation (Reclamation) will consider proposals for non-Federal development of a pumped-storage hydroelectric power utilizing Anderson Ranch Reservoir as the lower impoundment for a pumped-storage project. Reclamation is considering such hydroelectric power development under its lease of power privilege (LOPP) process and regulations. The Federal Energy Regulatory Commission (FERC) also has jurisdiction in this case. FERC jurisdiction applies to all elements of a proposed pumped-storage hydroelectric power project at Anderson Ranch Reservoir that are outside of Reclamation facilities and lands. In this case, FERC jurisdiction will include the upper reservoir, a large part of the penstock connecting the upper reservoir with Anderson Ranch Reservoir, and other facilities (such as power transmission lines and access roads that are outside of Reclamation jurisdiction).
Notice of Extension of Public Comment Period for the Draft Environmental Impact Statement for Adoption of a Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam, Page, Arizona
The Department of the Interior, through the Bureau of Reclamation and the National Park Service, is extending the public comment period for the Draft Environmental Impact Statement (EIS) for Adoption of a Long-Term Experimental and Management Plan (LTEMP) for the Operation of Glen Canyon Dam to Monday, May 9, 2016. The Notice of Availability and Notice of Public Meetings for the Draft Environmental Impact Statement was published in the Federal Register on January 8, 2016 (81 FR 963). The public comment period for the Draft EIS was originally scheduled to end on Thursday, April 7, 2016.