Bureau of Reclamation July 2013 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions
Notice is hereby given of contractual actions that have been proposed to the Bureau of Reclamation (Reclamation) and are new, modified, discontinued, or completed since the last publication of this notice. This notice is one of a variety of means used to inform the public about proposed contractual actions for capital recovery and management of project resources and facilities consistent with section 9(f) of the Reclamation Project Act of 1939. Additional announcements of individual contract actions may be published in the Federal Register and in newspapers of general circulation in the areas determined by Reclamation to be affected by the proposed action.
Glen Canyon Dam Adaptive Management Work Group Meetings
The Glen Canyon Dam Adaptive Management Work Group (AMWG) makes recommendations to the Secretary of the Interior concerning Glen Canyon Dam operations and other management actions to protect resources downstream of Glen Canyon Dam, consistent with the Grand Canyon Protection Act. The AMWG meets two to three times a year.
Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Workshops and Hearings for the Shasta Lake Water Resources Investigation, Shasta and Tehama Counties, California
The Bureau of Reclamation has made available for public review and comment the Draft Environmental Impact Statement (DEIS) for the Shasta Lake Water Resources Investigation (SLWRI). The purpose of the proposed action is to improve operational flexibility of the Sacramento-San Joaquin Delta watershed system by modifying the existing Shasta Dam and Reservoir to meet specified objectives. Primary objectives are to increase the survival of anadromous fish populations in the upper Sacramento River and increase water supply and water supply reliability. Secondary planning objectives are to: conserve, restore, and enhance ecosystem resources in the primary study area; reduce flood damage along the Sacramento River; develop additional hydropower generation capabilities; maintain and increase recreation opportunities; and maintain or improve water quality conditions in the Sacramento River downstream from Shasta Dam and in the Sacramento-San Joaquin Delta.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.