Bureau of Reclamation November 2010 – Federal Register Recent Federal Regulation Documents

San Joaquin River Restoration Program: Reach 4B, Eastside Bypass, and Mariposa Bypass Channel and Structural Improvements Project, Merced County, CA
Document Number: 2010-29330
Type: Notice
Date: 2010-11-22
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation and the California Department of Water Resources are revising our proposal to prepare a joint EIS/EIR on the effects of the proposed Reach 4B, Eastside Bypass, and Mariposa Bypass Channel and Structural Improvements Project under the San Joaquin River Restoration Program. The original notice of intent was published in the Federal Register on September 9, 2009 (74 FR 46453). This revised proposal would include measures for the conveyance of Interim and Restoration flows and incorporation of fish habitat through Reach 4B and/or the bypasses. When evaluating comments on this proposal, we will also consider comments that we received on the previous proposal.
Central Valley Project Improvement Act, Water Management Plans
Document Number: 2010-28784
Type: Notice
Date: 2010-11-16
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The following Water Management Plans are available for review: Orland-Artois Water District Kern Tulare Water District To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and the Reclamation Reform Act of 1982, the Bureau of Reclamation developed and published the Criteria for Evaluating Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans) are considered the same as Water Conservation Plans. The above entities have developed a Plan, which Reclamation has evaluated and preliminarily determined to meet the requirements of these Criteria. Reclamation is publishing this notice in order to allow the public to review the plans and comment on the preliminary determinations. Public comment on Reclamation's preliminary (i.e., draft) determination is invited at this time.
Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans
Document Number: 2010-28603
Type: Notice
Date: 2010-11-15
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The ``Criteria for Developing Refuge Water Management Plans'' (Refuge Criteria) are now available for public comment. The Refuge Criteria provide a common methodology, or standard, for efficient use of water by Federal Wildlife Refuges, State Wildlife Management Areas and Resource Conservation Districts that receive water under provisions of the Central Valley Project Improvement Act (CVPIA). They document the process and format by which Refuge Water Management Plans (Plans) should be prepared and submitted to Reclamation as part of the Refuge/ District Water Supply Contracts and Memoranda of Agreement. The Refuge Criteria refer to Refuges, Wildlife Areas, and Resource Conservation Districts as Refuges. Those Refuges that entered into water supply contracts with Reclamation as a result of the CVPIA and subsequent Department of the Interior administrative review processes are required to prepare Plans using the Refuge Criteria.
Hydropower Resource Assessment at Existing Reclamation Facilities-Draft Report
Document Number: 2010-27908
Type: Notice
Date: 2010-11-04
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation has made available for public review and comment the ``Hydropower Resource Assessment at Existing Reclamation Facilities'' (HRA) Draft Report. The HRA is an assessment of the economic and technical potential for hydropower development at existing Bureau of Reclamation (Reclamation) owned non-powered dams and structures.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.