Bureau of Reclamation February 13, 2009 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Bay Delta Conservation Plan for the Sacramento-San Joaquin Delta, CA
Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended, the Fish and Wildlife Service (FWS), the Bureau of Reclamation (Reclamation), and the National Marine Fisheries Service (NMFS) will serve as co-lead agencies in the preparation of a joint EIS/EIR for the Bay Delta Conservation Plan (BDCP). The California Department of Water Resources (DWR) will serve as the lead agency under the California Environmental Quality Act (CEQA), which requires the preparation of the EIR component of the EIS/EIR. FWS will serve as the administrative lead for all actions related to this Federal Register Notice (Notice). The Federal co-lead agencies have requested that the U.S. Army Corps of Engineers (USACE) and the Environmental Protection Agency (EPA) participate in the EIS/EIR as cooperating agencies for the purposes of their regulatory programs. The Corps and EPA have indicated that they will participate in such a role. This Notice revises and updates the Notices of April 15, 2008 and January 24, 2008. In these previous Notices the description of the proposed action and possible alternatives were preliminary in nature and relied upon initial BDCP planning documents which describe the overall intent and direction of potential actions. Following publication of these previous Notices, preliminary scoping comments were submitted in writing and provided at preliminary scoping meetings. Some of the scoping comments indicated that more detailed descriptions of the proposed actions and alternatives are needed to allow specific comments on the range of alternatives and issues and levels of detail to be considered in the analyses of environmental consequences. Public comments received during this scoping period plus the previous two preliminary scoping periods will be considered during the preparation of the EIS/EIR. Comments submitted in response to the previous notices will be considered and do not need to be resubmitted. The BDCP is a conservation plan being prepared to meet the requirements of the federal Endangered Species Act (ESA), the California Endangered Species Act (CESA), and the State of California's Natural Communities Conservation Planning Act (NCCPA). DWR (and potentially State and Federal water contractors) intends to apply for ESA and CESA incidental take permits (ITP) for water operations and management activities in the Sacramento-San Joaquin Delta. These incidental take authorizations would allow the incidental take of threatened and endangered species resulting from covered activities and conservation measures that will be identified through the planning process, including those associated with water operations of the Federal Central Valley Project (CVP), as operated by Reclamation, the California State Water Project (SWP), as operated by DWR, as well as operations of certain Mirant Delta LLC (Mirant Delta) power plants. Additionally, if feasible, the BDCP will be used as the basis for ESA compliance by Reclamation, including compliance with Section 7 of ESA in coordination with FWS and NMFS. Ultimately, the BDCP is intended to secure authorizations that would allow projects that restore and protect water supplies, water quality, and ecosystem health to proceed within a stable regulatory framework.
Aspinall Unit, Colorado River Storage Project, CO
The Bureau of Reclamation (Reclamation), the Federal agency responsible for operation of the Aspinall Unit, has prepared and made available to the public a draft environmental impact statement (DEIS) on Aspinall Unit operations pursuant to Section 102(2)(c) of the National Environmental Policy Act of 1969 (NEPA), as amended, 42 U.S.C. 4332.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.