Engineers Corps 2009 – Federal Register Recent Federal Regulation Documents

Results 101 - 101 of 101
Termination of an Environmental Impact Statement for the Construction and Operation of a 300-MW Coal-Fired Electric Generating Unit Proposed by Wisconsin Power and Light Company Near Cassville in Grant County, WI
Document Number: E9-36
Type: Notice
Date: 2009-01-07
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The St. Paul District, Corps of Engineers (Corps) is canceling the preparation of a federal Environmental Impact Statement (EIS) for the proposal by Wisconsin Power and Light Company (WPL) to conduct work below the ordinary high water mark of the Mississippi River, a navigable water of the U.S., and to discharge dredged or fill material into waters of the U.S. to facilitate the construction and operation of a 300 megawatt (MW) baseload coal-fired electric generating unit, referred to as NED 3, near Cassville in Grant County, WI. The Corps has terminated its review of the WPL permit application due to WPL's withdrawal of their permit application on November 21, 2008.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.