Engineers Corps January 2007 – Federal Register Recent Federal Regulation Documents
Results 1 - 9 of 9
Estuary Habitat Restoration Council; Open Meeting
In accordance with Section 105(h) of the Estuary Restoration Act of 2000, (Title I, Pub. L. 106-457), announcement is made of the forthcoming meeting of the Estuary Habitat Restoration Council. The meeting is open to the public.
Notice of Intent To Prepare a Draft Environmental Impact Statement/ Environmental Impact Report (DEIS/DEIR) for a Proposed Marine Terminal Development at Pier S and Back Channel Navigational Safety Improvements in the Port of Long Beach, Los Angeles County, CA
The Port of Long Beach (Port) is proposing to develop the Pier S Marine Terminal and Back Channel Navigational Safety Improvements Project (Proposed Action). The development of Pier S and Back Channel improvements would result in an approximately 160-acre marine container terminal, and would include the following elements: property acquisition; dredging, wharf construction, other waterside improvements, and container cranes; container yard and associated structures; terminal buildings and other structures; truck gates, associated structures, and roadwork; intermodal rail yard, structures, and dual rail lead; and utility and oil facility relocation. The primary Federal concern is the dredging and discharging of materials within waters of the U.S. and potential impacts on the human environment. Under Section 404 of the Clean Water Act, the Corps is authorized to approve discharges of dredged or fill material into waters of the U.S. Under Section 10 of the Rivers and Harbors Act, the Corps may authorize activities that could affect navigable waters. Pursuant to Section 102(2)(c) of the National Environmental Policy Act of 1969 (NEPA) as implemented by the Council on Environmental Quality (CEQ), 40 CFR 1500-1508, the Corps is preparing an Environmental Impact Statement (EIS) to evaluate the potential effects of the Proposed Action on the environment. The Corps may ultimately make a determination to permit or deny the Proposed Action, or permit or deny alternatives to the Proposed Action. Pursuant to the California Environmental Quality Act (CEQA), the Port will serve as Lead Agency for the preparation of an Environmental Impact Report (EIR) for its consideration of development approvals within its jurisdiction. The Corps and the Port have agreed to jointly prepare a DEIS/DEIR in order to optimize efficiency and avoid duplication. The DEIS/DEIR is intended to be sufficient in scope to address federal, state, and local requirements and environmental issues concerning the proposed activities and permit approvals.
Notice of Availability of the Draft Environmental Impact Statement and the Announcement of a Public Hearing for the Proposed Potash Corporation of Saskatchewan Phosphate Mine Continuation Near Aurora, in Beaufort County, NC
The comment period for the Draft Environmental Impact Statement (DEIS) for the request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act, from Potash Corporation of Saskatchewan Phosphate Division (PCS) for the continuation of its phosphate mining operation near Aurora, Beaufort County, NC published in the Federal Register on Friday, October 20, 2006 (71 FR 61962), required comments be submitted by January 22, 2007. The comment period has been extended until February 9, 2007.
Notice of Availability of the Draft Environmental Impact Statement for the Dam Safety Assurance Evaluation Report, Dover Dam, City of Dover, Tuscarawas County, OH
This notice replaces the previously published Federal Register notice dated January 9, 2007 (72 FR 958). Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (Corps), Huntington District has prepared an Environmental Impact Statement (EIS) to disclose potential impacts to the natural, physical, and human environment resulting from modifications to Dover Dam. This high hazard dam does not conform to current design standards related to stability and sliding during a probably maximum flood. Modifications are proposed so the Dam will meet these standards.
Intent To Prepare a Draft Environmental Impact Statement for the Combined Structural and Operational Plan, Broward and Miami-Dade Counties, FL
The Jacksonville District, U.S. Army Corps of Engineers (Corps), intends to prepare a Draft Environmental Impact Statement (DEIS) for the Combined Structural and Operational Plan (CSOP) for the Central and Southern Florida Project, WCA-3A and B and the South Dade Conveyance System. The study is a cooperative effort between the Corps, Everglades National Park (ENP), U.S. Fish and Wildlife Service (USFWS), and South Florida Water Management District (SFWMD). CSOP is an integrated structural and operational plan for two modifications of the Central and South Florida (C&SF) Project: the Modified Water Deliveries to ENP (MWD) Project and the Canal-111 (C- 111) Project. The objective of CSOP is to define the operations for these projects in a manner consistent with their respective project purposes.
Withdrawal of Notice of Intent To Prepare an Environmental Impact Statement for the TransAlta Pit 7 Mine Completion Project at Centralia, WA
The permit applicant, TransAlta Centralia Mining LLC (TCM) has greatly reduced the scope of its proposed coal mining project at Centralia, Washington. Therefore, the U.S. Army Corps of Engineers (Corps) is withdrawing its Notice of Intent to prepare an environmental impact statement (EIS).
Notice of Availability for the Final Environmental Impact Statement for the San Juan Creek Watershed/Western San Mateo Creek Watershed Special Area Management Plan (SAMP), Orange County, CA
The U.S. Army Corps of Engineers, Regulatory Branch has completed a Final EIS for the San Juan Creek Watershed/Western San Mateo Creek Watershed Special Area Management Plan (SAMP). The San Juan Creek Watershed/Western San Mateo Creek Watershed SAMP establishes three alternative permitting procedures that balance aquatic resource protection and reasonable economic development for the San Juan Creek Watershed and western San Mateo Creek Watershed.
Notice of Availability of the Draft Environmental Impact Statement for the Dam Safety Assurance Evaluation Report, Dover Dam, City of Dover, Tuscarawas County, OH
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (Corps), Huntington District has prepared an Environmental Impact Statement (EIS) to disclose potential impacts to the natural, physical, and human environment resulting from modifications to Dover Dam. This high hazard dam does not conform to current design standards related to stability and sliding during a probable maximum flood. Modifications are proposed so the Dam will meet these standards.
Notice of Availability for the Final Environmental Impact Statement/Environmental Impact Report for the Proposed San Luis Obispo Creek Watershed Waterway Management Plan in the City and County of San Luis Obispo, CA
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Branch), in coordination with the San Luis Obispo County Flood Control & Water Conservation District (Zone 9) (District) and the City of San Luis Obispo, has completed a Final Environmental Impact Statement/Environmental Impact Report (FEIS/EIR) for the San Luis Obispo Creek Watershed Waterway Management Plan. The District and City require authorization pursuant to Section 404 of the Clean Water Act for activities anticipated necessary to implement a long-term stream maintenance and management program to address regional flooding and flood control along San Luis Obispo Creek and its tributaries. Historically, project planning for activities and development within and affecting the stream corridor has been managed or guided by the policies of various different agencies with no concerted effort at consistent management techniques. The Waterway Management Plan, the Stream Maintenance and Management Plan and the Drainage Design Manual, collectively referred to as the Program, represent a consolidated effort to provide a consistent management program for the waterway and its watershed.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.