Army Department September 23, 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 5 of 5
Notice of Availability of the Record of Decision for the Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) and the Final General Conformity Determination for the Newhall Ranch Resource Management and Development Plan, Santa Clarita, CA
The U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) has made a Final General Conformity Determination (GCD) and executed a Record of Decision (ROD) for the Final Environmental Impact Statement/Environmental Impact Report (EIS/ EIR) and a Section 404 Permit under the Clean Water Act for the Newhall Ranch Resource Management and Development Plan, Santa Clarita, California. This Notice serves as the Public Notice/Notice of Availability for the Final EIS/EIR ROD and the Final GCD. The Record of Decision for the Final EIS/EIR was signed on 31 August 2011. In June 2010, the Corps, in coordination with the California Department of Fish and Game (CDFG), completed and published a joint Final EIS/EIR and Draft GCD, pursuant to National Environmental Policy Act (NEPA) and section 176(c) of the Clean Air Act. The identified least environmentally damaging practicable alternative (LEDPA) in the ROD includes permanent impacts to 47.9 acres of waters of the United States, including 5.1 acres of wetlands, associated with discharges of fill material for bank protection to protect land development projects along water courses (including buried soil cement, buried gunite, grouted riprap, ungrouted riprap, and gunite lining); drainage facilities such as storm drains or outlets and partially lined open channels; grade control structures; bridges and drainage crossings; building pads; and water quality control facilities (sedimentation control, flood control, debris, and water quality basins). The LEDPA also includes temporary impacts to 35.3 acres of waters of the United States, including 11.8 acres of wetlands, associated with the construction of bank protection to protect land development projects along water courses (including buried soil cement, buried gunite, grouted riprap, ungrouted riprap, and gunite lining); utility crossings; activities associated with construction of a Water Reclamation Plant adjacent to the Santa Clara River and required bank protection; water quality control facilities (sedimentation control, flood debris, and water quality basins); regular and ongoing maintenance of all flood, drainage, and water quality protection structures and facilities on the RMDP site (such activities would include periodic inspection of structures and monitoring of vegetation growth and sediment buildup to ensure that the integrity of the structures is maintained and that planned conveyance capacity is present, routine repairs and maintenance of bridges and bank protection, and emergency maintenance activities); and temporary haul routes for grading equipment and geotechnical survey activities. As a Federal agency, the Corps prepared the Final GCD in compliance with Section 176(c) of the Clean Air Act and for the issuance of a Corps Section 404 Permit for the discharges of fill material into waters of the United States. Direct and indirect air emissions for all pollutants related to the Federal action are not below specified de minimis Federal thresholds (40 CFR 93.153(b)). On 31 August 2011, the Corps completed its environmental review and finalized the GCD, executed the ROD, and issued a provisional Section 404 Standard Individual Permit for the LEDPA. The Corps considered and responded to all comments received in finalizing the EIS/EIR, Final GCD, ROD, and issuing the provisional permit. The public can request copies of the Final General Conformity Determination document or the ROD from the Corps at the address listed below. In addition, copies of the Final General Conformity Determination document are available for review during the next 30 days at the following libraries: County of Los Angeles Newhall Branch, Castaic Branch, Sylmar Branch, Valencia Branch, and the County of Ventura Fillmore Branch.
Notice of Availability for the Draft Environmental Impact Statement/Environmental Impact Report for Proposed Marine Terminal Development at Pier S and Back Channel Navigational Safety Improvements in the Port of Long Beach, Los Angeles County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Port of Long Beach, has completed a Draft Environmental Impact Statement/Environmental Impact Report (DEIS/DEIR) for the Pier S Marine Terminal and Back Channel Improvement Project, encompassing approximately 210 acres of land and water. The development of Pier S and Back Channel improvements would result in an approximately 160-acre marine container terminal, and would include the following elements: Property acquisition; dredging, wharf construction, other waterside improvements, and container cranes; container yard and associated structures; terminal buildings and other structures; truck gates, associated structures, and roadwork; intermodal rail yard, structures, and dual rail lead; and utility and oil facility relocation. Construction duration is estimated at 22 months. The Port of Long Beach requires authorization pursuant to Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act, and Section 103 of the Marine Protection, Research, and Sanctuaries Act, to implement various regulated activities in and over waters of the U.S. associated with developing Pier S. Pursuant to the California Environmental Quality Act (CEQA), the Port will serve as Lead Agency for the preparation of an Environmental Impact Report (EIR) for its consideration of development approvals within its jurisdiction. The Corps and the Port have agreed to jointly prepare a DEIS/DEIR in order to optimize efficiency and avoid duplication. The DEIS/DEIR is intended to be sufficient in scope to address federal, state, and local requirements and environmental issues concerning the proposed activities and permit approvals.
Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1
The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim change to the MFTURP No. 1. The interim change updates Section A.II.D.6 to align the safety requirements for transportation protective service (TPS) carriers with the Department of Transportation's (DOT) Federal Motor Carrier Safety Administration (FMCSA) scoring system.
Notice of Availability of a Draft Environmental Impact Statement in Cooperation With the North Carolina Department of Transportation for Improvements to the US 17 and Market Street (US 17 Business) Corridor in Northern New Hanover and Southern Pender Counties, NC
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Division is issuing this notice to advise the public that a State of North Carolina funded Draft Environmental Impact Statement (DEIS) has been prepared describing proposed improvements to the transportation system starting at Military Cutoff Road in New Hanover County to north of Hampstead along US 17, Pender County, NC (TIP Projects U-4751 and R-3300).
Notice of Intent To Prepare a Draft Environmental Impact Statement for the Puyallup River General Investigation Study, Pierce County, WA
The Seattle District, U.S. Army Corps of Engineers (USACE) will prepare a Draft Environmental Impact Statement (DEIS) pursuant to Section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, for a proposed flood-risk management project in the Puyallup River Basin including the Puyallup River downstream of Electron Dam to Commencement Bay, the Carbon River and the White River downstream of Mud Mountain Dam. This study was requested by Pierce County (the local sponsor), Washington, because of the potential for significant flooding within the Puyallup River Basin. A DEIS is being prepared because of the potential for impacts on environmental resources, particularly salmonid habitat, and the intense public interest already demonstrated in addressing the flooding problems of the Puyallup, Carbon and White Rivers. The Puyallup River General Investigation (GI) DEIS for the Puyallup River Basin is being conducted under the authority of Section 209 of the Flood Control Act of 1962, Public Law 87-874. That section authorized a comprehensive study of Puget Sound, Washington, and adjacent waters including tributaries, in the interest of flood control, navigation, and other water uses and related land resources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.