Army Department March 9, 2007 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
South Bay Salt Pond Restoration Project, San Francisco Bay, CA
The U.S. Fish and Wildlife Service (Service) and the California Department of Fish and Game (CDFG) are proposing a restoration plan for 15,100 acres (6,111 hectares) of former commercial salt ponds in south San Francisco Bay. This South Bay Salt Pond (SBSP) Restoration Project would use a combination of restored tidal marsh, managed ponds, flood control measures and public access features to meet the three goals of the plan: to restore wildlife habitat, to provide flood protection and to provide wildlife-oriented public access. The ponds are located at the Don Edwards San Francisco Bay National Wildlife Refuge and at the Eden Landing State Ecological Reserve. The Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) includes program-level evaluation of the SBSP long- term alternatives as well as project-level analysis of the first phase of restoration (the Phase 1 actions). The Draft EIS/EIR has been prepared jointly by the Service, the U.S. Army Corps of Engineers (Corps) and the CDFG to analyze the impacts of the SBSP. The EIS/EIR presents a limited evaluation of the potential impacts associated with the list of possible South San Francisco Bay Shoreline Study (Shoreline Study) actions. The Shoreline Study area includes the SBSP Restoration Project area as well as shoreline and floodplain areas in the counties of Alameda, San Mateo, and Santa Clara. The Corps and non-Federal sponsors will prepare an EIS/EIR for the Shoreline Study, which will tier off of this EIS/EIR and cover specific project-level actions. Note that the Draft SBSP EIS/EIR is being submitted for public review under separate Federal and State processes. The following addresses and due dates are applicable to the Federal NEPA review process:
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.