Nuclear Regulatory Commission April 2024 – Federal Register Recent Federal Regulation Documents

Interim Staff Guidance: Review of Risk-Informed, Technology-Inclusive Advanced Reactor Applications-Roadmap
Document Number: 2024-07023
Type: Notice
Date: 2024-04-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Interim Staff Guidance (ISG) DANU-ISG-2022-01, "Review of Risk- Informed, Technology-Inclusive Advanced Reactor Applications Roadmap." The purpose of this ISG is to provide guidance for prospective applicants in preparing applications for non-light water reactor (non-LWR) designs that use the Licensing Modernization Project (LMP) process and to assist the NRC staff in determining whether such applications meet the minimum requirements for construction permits, operating licenses, combined licenses, manufacturing licenses, standard design approval, or design certifications.
Regulatory Guide: Guidance for a Technology-Inclusive Content of Application Methodology To Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors
Document Number: 2024-07022
Type: Rule
Date: 2024-04-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing a new Regulatory Guide (RG) 1.253, Revision 0, "Guidance for a Technology- Inclusive Content of Application Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors." This new RG provides guidance to assist interested parties and prospective applicants in the development of content for major portions of their safety analysis reports required in applications for permits, licenses, certifications, and approvals by the NRC to ensure that applications for non-light water reactor (non-LWR) facility designs using the Licensing Modernization Project (LMP) process meet the minimum requirements for construction permit, operating license, combined license, or design certification applications.
Interim Staff Guidance: Advanced Reactor Content of Application Project, Risk-Informed Inservice Inspection/Inservice Testing Programs for Non-LWRs
Document Number: 2024-07064
Type: Notice
Date: 2024-04-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Interim Staff Guidance (ISG) DANU-ISG-2022-07, "Risk-Informed Inservice Inspection/Inservice Testing Programs for Non-LWRs." The purpose of this ISG is to provide guidance to prospective applicants in preparing applications for non-light water reactor (non-LWR) designs that use the Licensing Modernization Project (LMP) process and to assist the NRC staff in determining whether such applications meet the minimum requirements for construction permits, operating licenses, combined licenses, manufacturing licenses, standard design approval, or design certifications.
Sunshine Act Meetings
Document Number: 2024-07041
Type: Notice
Date: 2024-04-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Radioactive Source Security and Accountability
Document Number: 2024-06828
Type: Rule
Date: 2024-04-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is discontinuing the rulemaking activity, "Radioactive Source Security and Accountability." The purpose of this document is to inform members of the public that this rulemaking activity is being discontinued and to provide a brief discussion of the NRC's decision to discontinue the rulemaking. The rulemaking activity will no longer be reported in the NRC's portion of the Unified Agenda of Regulatory and Deregulatory Actions (the Unified Agenda).
Application for Amendment to Facility Operating License Involving Proposed No Significant Hazards Consideration and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information
Document Number: 2024-05621
Type: Notice
Date: 2024-04-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of one amendment request. The amendment request is for Watts Bar Nuclear Plant, Units 1 and 2. For the amendment request, the NRC proposes to determine that it involves no significant hazards consideration (NSHC). Because the amendment request contains sensitive unclassified non-safeguards information (SUNSI), an order imposes procedures to obtain access to SUNSI for contention preparation by persons who file a hearing request or petition for leave to intervene.
Information Collection: US NRC Acquisition Regulation
Document Number: 2024-06923
Type: Notice
Date: 2024-04-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, "US NRC Acquisition Regulation."
Maine Yankee Atomic Power Company; Maine Yankee Atomic Power Station; Exemption
Document Number: 2024-06820
Type: Notice
Date: 2024-04-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption in response to the March 31, 2023, request from Maine Yankee Atomic Power Company (MYAPC or Maine Yankee), for the Maine Yankee Atomic Power Station (MYAPS), located in Wiscasset, Maine. The exemption permits MYAPC to make withdrawals from a separate account within Maine Yankee's overall Nuclear Decommissioning Trust (NDT), on an annual basis, for spent nuclear fuel and Greater than Class C (GTCC) waste management and non-radiological site restoration without prior notification to the NRC.
Constellation Energy Generation, LLC; Dresden Nuclear Power Station, Unit 2 and Unit 3; Independent Spent Fuel Storage Installation; Environmental Assessment and Finding of No Significant Impact
Document Number: 2024-06772
Type: Notice
Date: 2024-04-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an environmental assessment (EA) and a finding of no significant impact (FONSI) for an exemption request submitted by Constellation Energy Generation, LLC (Constellation) that would permit Dresden Nuclear Power Station (Dresden) to maintain loaded and to load 68M multi-purpose canister (MPC) with continuous basket shims (CBS) in the HI-STORM 100 Cask System at its Dresden Unit 2 and Unit 3 independent spent fuel storage installation (ISFSI) in a storage condition where the terms, conditions, and specifications in the Certificate of Compliance (CoC) No. 1014, Amendment No. 8, Revision No. 1 are not met.