Nuclear Regulatory Commission July 7, 2021 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of amendments to Renewed Facility Operating License Nos. NPF- 72 and NPF-77, that were issued to Exelon Generation Company, LLC, (licensee) for operation of the Braidwood Station, Units 1 and 2. The proposed amendments are contained in the licensee's letter dated May 27, 2021, and would change technical specifications (TSs) surveillance requirement (SR) 3.7.9.2 to allow an ultimate heat sink (UHS) temperature of less than or equal to 102.8 degrees Fahrenheit ([deg]F) until September 30, 2021.
Replacement Energy Cost Estimates for Nuclear Power Plants: 2020-2030
The U.S. Nuclear Regulatory Commission (NRC) is issuing NUREG- 2242, ``Replacement Energy Cost Estimates for Nuclear Power Plants: 2020-2030.'' This report updates previous estimates of replacement energy costs for potential shutdowns of U.S. nuclear electricity- generating units due to a temporary power reactor outage to implement safety modifications or the loss of generation associated with a possible severe reactor accident. The final NUREG largely, is unchanged from the draft issued for public comment but has been revised to reflect the recent change to retirement dates for Byron Units 1 and 2, and Dresden Units 2 and 3.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.