Nuclear Regulatory Commission November 19, 2019 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Power Reactor In-Core Monitoring
The U.S. Nuclear Regulatory Commission (NRC) is denying a petition for rulemaking (PRM), dated March 13, 2015, submitted by Mark Edward Leyse (petitioner). The petition was docketed by the NRC on April 24, 2015, and assigned Docket No. PRM-50-111. The petitioner requested that the NRC require all holders of operating licenses for nuclear power plants to operate them with in-core temperature- monitoring devices (e.g., thermoacoustic sensors or thermocouples) located at different elevations and radial positions throughout the reactor core. The NRC is denying the petition because current regulations provide a sufficient level of safety, such that additional requirements for in-core temperature-monitoring devices as specified in the petition are not needed.
Alternative Method for Calculating Embrittlement for Steel Reactor Vessels
The U.S. Nuclear Regulatory Commission (NRC) has received a petition for rulemaking from Thomas A. Bergman, on behalf of NuScale Power, LLC, dated August 19, 2019, requesting that the NRC revise its regulations to alleviate a requirement for calculating the embrittlement for advanced reactor designs and to add the embrittlement trend curve formula for calculating the mean value of the transition temperature shift described in American Society for Testing and Materials E900-152 to the NRC's regulations and guidance documents. The petition was docketed by the NRC on September 11, 2019, and has been assigned Docket No. PRM-50-120. The NRC is examining the issues raised in PRM-50-120 to determine whether these issues should be considered in rulemaking. The NRC is requesting public comment on this petition at this time.
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Pursuant to the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued, from October 22, 2019, to November 4, 2019. The last biweekly notice was published on November 5, 2019.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.