Nuclear Regulatory Commission October 28, 2019 – Federal Register Recent Federal Regulation Documents

Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and Independent Spent Fuel Storage Installation; Consideration of Approval of Transfer of Licenses
Document Number: 2019-23421
Type: Notice
Date: 2019-10-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an indirect license transfer application filed by the El Paso Electric Company (EPE) on August 13, 2019. The application seeks NRC approval of the indirect transfer of possession- only non-operating interests in Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74 for Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3, respectively, and the general license for the Palo Verde Independent Spent Fuel Storage Installation (ISFSI) from EPE to IIF US Holding 2 LP. EPE currently owns a 15.8 percent tenant-in-common interest in and holds possession-only rights in the NRC licenses. The proposed indirect license transfer would result from IIF US Holding 2 LP acquiring 100 percent of the shares in EPE.
NextEra Energy Seabrook, LLC; Seabrook Station, Unit No. 1
Document Number: 2019-23420
Type: Notice
Date: 2019-10-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed Facility Operating License No. NPF- 86, issued to NextEra Energy Seabrook, LLC, et al. (NextEra), for operation of the Seabrook Station, Unit No. 1 (Seabrook). The amendment would extend the allowed outage time for one alternating current (AC) vital panel not energized from its associated inverter from 24 hours to 7 days on a one-time basis. The change would allow NextEra to perform corrective maintenance and testing on vital inverter 1-E, which could challenge the current allowed outage time of 24 hours.
Westinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility
Document Number: 2019-23419
Type: Notice
Date: 2019-10-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is withdrawing its June 2018 final environmental assessment (EA) and finding of no significant impact (FONSI) concerning the license renewal request from Westinghouse Electric Company, LLC's (WEC) Columbia Fuel Fabrication Facility (CFFF). Because of its withdrawal, the NRC is issuing for public comment a new draft EA and draft FONSI concerning WEC's CFFF. The draft EA, ``Environmental Assessment for the Renewal of SNM-1107, Columbia Fuel Fabrication Facility in Richland County, South Carolina,'' documents the NRC staff's new environmental review of the license renewal application. The NRC is announcing a public meeting and an open house. The public meeting will allow interested members of the public to submit their comments on the draft EA.
In the Matter of Mr. Thomas B. Saunders
Document Number: 2019-23411
Type: Notice
Date: 2019-10-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) issued a Confirmatory Order to Mr. Thomas B. Saunders, a former executive of Southern Nuclear Operating Company (SNC). This action is based on an investigation conducted by the NRC Office of Investigations (OI), that concluded Mr. Saunders had a mechanical planner removed from the Vogtle Units 3 and 4 construction site and that Mr. Saunders was aware at that time that the mechanical planner had engaged in protected activity by raising numerous safety-related welding and module fit-up concerns, constituting an apparent violation of NRC regulations. An Alternative Dispute Resolution mediation session was held on August 15, 2019, during which Mr. Saunders and the NRC reached a preliminary agreement. Subsequently, Mr. Saunders consented to the specific actions listed in Section V of the Confirmatory Order and the NRC agrees to not pursue any further enforcement action in connection with this apparent violation. The Confirmatory Order became effective upon issuance.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.