Nuclear Regulatory Commission September 17, 2019 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant Units 1 and 2
The U.S. Nuclear Regulatory Commission (NRC) has issued exemptions in response to a December 13, 2018, request from Pacific Gas and Electric Company (PG&E or the licensee) from certain regulatory requirements for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Diablo Canyon).
Proposed Revisions to Standard Review Plan Section 14.3.3, Piping Systems and Components-Inspections, Tests, Analyses, and Acceptance Criteria
The U.S. Nuclear Regulatory Commission (NRC) is issuing a final revision to Section 14.3.3, ``Piping Systems and Components Inspections, Tests, Analyses, and Acceptance Criteria,'' of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.''
Standard Format and Content for Applications To Renew Nuclear Power Plant Operating Licenses
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft regulatory guide (DG), DG-1341, ``Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses.'' This regulatory guide (RG) describes the standard format and content that the NRC staff considers acceptable for applications for renewal and subsequent renewal of operating licenses for commercial nuclear power plants.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.