Nuclear Regulatory Commission March 13, 2019 – Federal Register Recent Federal Regulation Documents

South Carolina Electric & Gas Company; Virgil C. Summer Nuclear Station, Units 2 and 3
Document Number: 2019-04601
Type: Notice
Date: 2019-03-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is terminating the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3, Combined Licenses (COLs) designated as NPF-93, and NPF-94, and their included licenses to manufacture, produce, transfer, receive, acquire, own, possess, or use byproduct material. By letter dated December 27, 2017, the South Carolina Electric & Gas Company (SCE&G) requested that the NRC terminate the VCSNS COLs. Although construction was initiated for VCSNS Units 2 and 3, nuclear materials were never possessed under these licenses. Consequently, the VCSNS site is approved for unrestricted use.
United Nuclear Corporation Church Rock Project
Document Number: 2019-04569
Type: Notice
Date: 2019-03-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On September 24, 2018, United Nuclear Corporation (UNC) requested an amendment to its reclamation plan for its Uranium Mill site near Gallup, New Mexico. UNC is a wholly owned indirect subsidiary corporation of the General Electric Company (GE). This amendment, if granted, would allow construction of a repository for mine-impacted soil. This mine waste would be removed from the Northeast Church Rock Mine Site and transported to be placed in the repository, located on and beside the existing Tailings Disposal Area.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.