Nuclear Regulatory Commission August 8, 2016 – Federal Register Recent Federal Regulation Documents

Sunshine Act Meeting
Document Number: 2016-18831
Type: Notice
Date: 2016-08-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Request To Amend a License To Export Radioactive Waste
Document Number: 2016-18752
Type: Notice
Date: 2016-08-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Request To Amend a License To Import Radioactive Waste
Document Number: 2016-18749
Type: Notice
Date: 2016-08-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Omaha Public Power District; Fort Calhoun Station, Unit No. 1
Document Number: 2016-18744
Type: Notice
Date: 2016-08-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of the Omaha Public Power District (the licensee) to withdraw its license amendment application dated August 31, 2015, as supplemented by letters dated December 23, 2015, and June 9, 2016, for a proposed amendment to Renewed Facility Operating License No. DPR-40. The proposed amendment would have revised the Fort Calhoun Station, Unit No. 1 (FCS), Updated Safety Analysis Report (USAR) to change the structural design methodology for Class I structures at FCS to use American Concrete Institute ultimate strength requirements, with the exception of the containment structure (cylinder, dome, and base mat), the spent fuel pool, and the foundation mats.
Massachusetts Institute of Technology; Renewal of Special Nuclear Materials License
Document Number: 2016-18628
Type: Notice
Date: 2016-08-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering an application for the renewal of Special Nuclear Materials (SNM) License No. SNM-986, which currently authorizes the Massachusetts Institute of Technology (MIT) to possess and use SNM for education, research, and training programs. The renewed license would authorize MIT to continue to possess and use SNM for an additional 10 years from the date of issuance. The NRC proposes to determine that the renewal involves no significant hazards consideration. Because this application contains sensitive unclassified non-safeguards information (SUNSI) an order imposes procedures to obtain access to SUNSI for contention preparation.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.