Nuclear Regulatory Commission August 2012 – Federal Register Recent Federal Regulation Documents

Proposed International Isotopes Fluorine Extraction Process and Depleted Uranium Deconversion Plant in Lea County, New Mexico
Document Number: 2012-21486
Type: Notice
Date: 2012-08-31
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC or the Commission) has published the Final Environmental Impact Statement (EIS) for the proposed International Isotopes Fluorine Extraction Process and Depleted Uranium Deconversion Plant (INIS) in Lea County, New Mexico. On December 30, 2009, International Isotopes Fluorine Products, Inc. (IIFP), a wholly-owned subsidiary of International Isotopes, Inc., submitted a license application that proposes the construction, operation, and decommissioning of a fluorine extraction and depleted uranium deconversion facility (the ``proposed action''). IIFP proposes to locate the facility near Hobbs, New Mexico.
Dominion Nuclear Connecticut, Inc. Millstone Power Station, Unit 3; Exemption
Document Number: 2012-21485
Type: Notice
Date: 2012-08-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Sunshine Act Meeting
Document Number: 2012-21287
Type: Notice
Date: 2012-08-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria
Document Number: 2012-21207
Type: Rule
Date: 2012-08-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is amending its regulations related to verification of nuclear power plant construction activities through inspections, tests, analyses, and acceptance criteria (ITAAC) under a combined license, and issuing a revision to Regulatory Guide (RG) 1.215, ``Guidance for ITAAC Closure Under 10 CFR [Title 10 of the Code of Federal Regulations] Part 52.'' The final rule contains new provisions that apply after a licensee has completed an ITAAC and submitted an ITAAC closure notification. The new provisions require licensees to report new information materially altering the basis for determining that inspections, tests, or analyses were performed as required, or that acceptance criteria are met, and to notify the NRC of the completion of all ITAAC activities. In addition, the NRC is including editorial corrections to existing language in the NRC's regulations to make that language consistent with language in the Atomic Energy Act of 1954, as amended (AEA). Regulatory Guide 1.215 describes a method that the staff of the NRC considers acceptable for use in satisfying the requirements for documenting the completion of ITAAC.
Request To Amend a License To Export Radioactive Waste
Document Number: 2012-21198
Type: Notice
Date: 2012-08-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Request To Amend a License to Import Radioactive Waste
Document Number: 2012-21195
Type: Notice
Date: 2012-08-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Advisory Committee on Reactor Safeguards; Notice of Meeting
Document Number: 2012-20928
Type: Notice
Date: 2012-08-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Request for a License To Export Nuclear Grade Graphite
Document Number: 2012-20922
Type: Notice
Date: 2012-08-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Application for a License To Export High-Enriched Uranium
Document Number: 2012-20912
Type: Notice
Date: 2012-08-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Developing Software Life Cycle Processes for Digital Computer Software Used in Safety Systems of Nuclear Power Plants
Document Number: 2012-20641
Type: Notice
Date: 2012-08-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1210, ``Developing Software Life Cycle Processes for Digital Computer Software used in Safety Systems of Nuclear Power Plants.'' The DG-1210 is proposed Revision 1 of RG 1.173, dated September 1997. This revision endorses, with clarifications, the enhanced consensus practices for developing software life-cycle processes for digital computers used in safety systems of nuclear power plants described in the Institute of Electrical and Electronic Engineers (IEEE) Standard 1074-2006, ``IEEE Standard for Developing a Software Project Life Cycle Process,'' issued 2006.
Software Requirement Specifications for Digital Computer Software and Complex Electronics Used in Safety Systems of Nuclear Power Plants
Document Number: 2012-20640
Type: Notice
Date: 2012-08-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1209, ``Software Requirement Specifications for Digital Computer Software and Complex Electronics used in Safety Systems of Nuclear Power Plants.'' The DG-1209 is proposed Revision 1 of RG 1.172, dated September 1997. This revision endorses, with clarifications, the enhanced consensus practices for testing of computer software as described in the American National Standards Institute and Institute of Electrical and Electronics Engineers (ANSI/IEEE) Standard 830-1998, ``IEEE Recommended Practice for Software Requirements Specifications.''
Software Unit Testing for Digital Computer Software Used in Safety Systems of Nuclear Power Plants
Document Number: 2012-20639
Type: Notice
Date: 2012-08-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1208, ``Software Unit Testing for Digital Computer Software used in Safety Systems of Nuclear Power Plants.'' The DG-1208 is proposed Revision 1 of RG 1.171, dated September 1997. This revision endorses, with clarifications, the enhanced consensus practices for testing of computer software as described in the American National Standards Institute and Institute of Electrical and Electronics Engineers (ANSI/ IEEE) Standard 1008-1987, ``IEEE Standard for Software Unit Testing.''
Test Documentation for Digital Computer Software Used in Safety Systems of Nuclear Power Plants
Document Number: 2012-20638
Type: Notice
Date: 2012-08-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1207, ``Test Documentation for Digital Computer Software used in Safety Systems of Nuclear Power Plants.'' The DG-1207 is proposed Revision 1 of RG 1.170, dated September 1997. This revision endorses, with clarifications, the enhanced consensus practices for test documentation for software and computer systems as described in the Institute of Electrical and Electronics Engineers (IEEE) Standard 829-2008, ``IEEE Standard for Software and System Test Documentation.''
Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Plants
Document Number: 2012-20637
Type: Notice
Date: 2012-08-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1206, ``Configuration Management Plan for Digital Computer Software Used in Safety Systems of Nuclear Power Plants.'' The DG-1206 is proposed Revision 1 of RG 1.169, dated September 1997. This revision endorses, with clarifications, the enhanced consensus practices for planning software configuration management (SCM) as described in the Institute of Electrical and Electronics Engineers (IEEE) Standard 828-2005, ``IEEE Standard for Software Configuration Management Plans.''
Verification, Validation, Reviews, and Audits for Digital Computer Software Used in Safety Systems of Nuclear Power Plants
Document Number: 2012-20636
Type: Notice
Date: 2012-08-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1267, ``Verification, Validation, Reviews, and Audits for Digital Computer Software used in Safety Systems of Nuclear Power Plants.'' The DG-1210 is proposed Revision 2 of Regulatory Guide (RG) 1.168, dated February 2004. This revision endorses, with clarifications and exceptions, the consensus practices for complying with NRC regulations promoting the development of, and compliance with, software verification and validation reviews and audits described in the Institute of Electrical and Electronics Engineers (IEEE) Standard 1012- 2004, ``IEEE Standard for Software Verification and Validation'' and IEEE Standard 1028-2008, ``IEEE Standard for Software Reviews and Audits.'' The NRC is soliciting stakeholder feedback on the following questionShould RG 1.168 be revised to endorse IEEE Std. 1012-2012 rather than IEEE Std. 1012-2004? IEEE Std. 1012-2012 expands the scope of IEEE Std. 1012-2004 to include verification and validation (V&V) task guidance for systems, software and hardware while IEEE Std. 1012- 2004 only provides software V&V task guidance.
Sunshine Act Meeting
Document Number: 2012-20630
Type: Notice
Date: 2012-08-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
STP Nuclear Operating Company, South Texas Project, Units 1 and 2; Application for Amendment to Facility Operating License
Document Number: 2012-20542
Type: Notice
Date: 2012-08-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (the Commission or NRC) has granted the request of STP Nuclear Operating Company (the licensee) to withdraw its application dated June 2, 2011 (ADAMS Accession No. ML11161A143), as supplemented by letters dated August 1, 2011, March 8, 2012, March 22, 2012, April 3, 2012 (ADAMS Accession Nos. ML11221A230, ML12079A038, ML12089A023, and ML12101A223, respectively), and May 3, 2012,\1\ for proposed amendment to Facility Operating License Nos. NPF- 76 and NPF-80 for the South Texas Project (STP), Units 1 and 2, located in Matagorda County, Texas.
Dominion Nuclear Connecticut, Inc.; Millstone Power Station, Unit 3
Document Number: 2012-20540
Type: Notice
Date: 2012-08-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Order Prohibiting Involvement in NRC-Licensed Activities; In the Matter of Mr. Joseph Quintanilla
Document Number: 2012-20230
Type: Notice
Date: 2012-08-17
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2012-20185
Type: Notice
Date: 2012-08-17
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Nuclear Material Events Database (NMED) for the Collection of Event Report, Response, Analyses, and Follow-up Data on Events Involving the Use of Atomic Energy Act (AEA) Radioactive Byproduct Material. 2. Current OMB approval number: 3150-0178. 3. How often the collection is required: On occasion. Agreement States are requested to provide copies of licensee nuclear material event reports electronically or by hard copy to the NRC within 30 days of receipt from their licensee. In addition, Agreement States are requested to report events that may pose a significant health and safety hazard to the NRC Headquarters Operations Officer within 24 hours of notification by an Agreement State licensee. 4. Who is required or asked to report: Current Agreement States and any State receiving Agreement State status in the future. 5. The number of annual respondents: 37. 6. The number of hours needed annually to complete the requirement or request: 745.5 hours. 7. Abstract: NRC regulations require NRC licensees to report incidents and events involving the use, transportation and security of radioactive byproduct material, and source material, such as those involving radiation overexposures, leaking or contaminated sealed source(s), release of excessive contamination of radioactive material, lost or stolen radioactive material, equipment failures, abandoned well logging sources, and medical events. Agreement State licensees are also required to report these events to their individual Agreement State regulatory authorities under compatible Agreement State regulations. The NRC is requesting that the Agreement States provide information to NRC on the initial notification, response actions, and follow-up investigations on events involving the use (including suspected theft or terrorist activities) of nuclear materials regulated pursuant to the Atomic Energy Act. The event information should be provided in a uniform electronic format, for assessment and identification of any facilities/site specific or generic safety concerns that could have the potential to impact public health and safety. The identification and review of safety concerns may result in lessons learned, and may also identify generic issues for further study which could result in proposals for changes or revisions to technical or regulatory designs, processes, standards, guidance, or requirements. Submit, by October 16, 2012, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for a fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2012-0182. You may submit your comments by any of the following methods: Electronic comments: Go to https:// www.regulations.gov and search for Docket No. NRC-2012-0182. Mail comments to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301- 415-6258, or by email to INFOCOLLECTS.Resource@NRC.GOV.
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: 2012-20184
Type: Notice
Date: 2012-08-17
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register notice with a 60-day comment period on this information collection on April 30, 2012 (77 FR 25505). 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of insights from the Fukushima Dai-Ichi Event. 3. Current OMB approval number: 3150-0211. 4. The form number if applicable: N/A. 5. How often the collection is required: Once. 6. Who will be required or asked to report: 104 power reactor licensees, 2 reactors in the process of resuming licensing, and 2 Combined License applicants (2 units each). 7. An estimate of the number of annual responses: 525.3. 8. The estimated number of annual respondents: 110. 9. An estimate of the total number of hours needed annually to complete the requirement or request: 457,502 hours. 10. Abstract: Following events at the Fukushima Dai-Ichi nuclear power plant resulting from the March 11, 2011, earthquake and subsequent tsunami, and in response to requirements contained in Section 402 of the Consolidated Appropriations Act (Pub. L. 112-074), the NRC sought an expedited clearance from OMB to allow the collection of information from power reactor licensees pursuant to 10 CFR 50.54(f). The OMB approved this clearance, which will expire on September 30, 2012. The NRC has resubmitted this collection to the OMB under the normal clearance processes. The information requested includes seismic and flooding hazard reevaluations to determine if further regulatory action is necessary, walkdowns to confirm compliance with the current licensing basis and provide input to the hazard reevaluations, and analysis of the Emergency Preparedness capability with respect to staffing and communication ability during a prolonged multiunit event. The public may examine and have copied for a fee publicly available documents, including the final supporting statement, at the NRC's Public Document Room, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by September 17, 2012. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. Chad Whiteman, Desk Officer, Office of Information and Regulatory Affairs (3150-0211), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be emailed to Chad_S_Whiteman@omb.eop.gov or submitted by telephone at 202-395-4718. The NRC Clearance Officer is Tremaine Donnell, 301-415-6258.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2012-20183
Type: Notice
Date: 2012-08-17
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: NRC's Policy Statement Cooperation with States at Commercial Nuclear Power Plants and Other Nuclear Production and Utilization Facilities 2. Current OMB approval number: 3150-0163. 3. How often the collection is required: On occasion, when a State wishes to observe NRC inspections or perform inspections for the NRC. 4. Who is required or asked to report: Nuclear Power Plant Licensees, Materials Security Licensees and those States interested in observing or performing inspections. 5. The number of annual respondents: 55. 6. The number of hours needed annually to complete the requirement or request: 1,000. 7. Abstract: States are involved and interested in monitoring the safety status of nuclear power plants and radioactive materials. This involvement is, in part, in response to the States' public health and safety responsibilities and, in part, in response to their citizens' desire to become more knowledgeable about the safety of nuclear power plants and radioactive materials. States have identified NRC inspections as one possible source of knowledge for their personnel regarding plant and materials licensee activities, and the NRC, through the policy statement on Cooperation with States, has been amenable to accommodating the States' needs in this regard. Additionally, the NRC has entered into reimbursable Agreements with certain States under Section 274i of the Act, as amended, to employ their resources to conduct radioactive materials security inspections against NRC Orders. Submit, by October 16, 2012, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for a fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2012-0166. You may submit your comments by any of the following methods: Electronic comments: Go to https:// www.regulations.gov and search for Docket No. NRC-2012-0166. Mail comments to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301- 415-6258, or by email to INFOCOLLECTS.Resource@NRC.GOV.
Workshop on Performance Assessments of Near-Surface Disposal Facilities: FEPs Analysis, Scenario and Conceptual Model Development, and Code Selection
Document Number: 2012-19774
Type: Proposed Rule
Date: 2012-08-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) plans to conduct a workshop on performance assessments of near-surface low-level radioactive waste (LLW) disposal facilities. The workshop has been developed to facilitate communication among Federal and State agencies, industry representatives, contractors, and members of the public on three aspects of a performance assessment: (1) Features, Events, and Processes (FEPs) analysis, (2) the development of scenarios and conceptual models, and (3) the selection of computer codes. Information gathered from invited subject matter experts, stakeholders, and other interested members of the public will be used to improve guidance on performance assessments for near-surface disposal of LLW.
Fuel Oil Systems for Emergency Power Supplies
Document Number: 2012-19770
Type: Notice
Date: 2012-08-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On July 5, 2012 (77 FR 39745), the U.S. Nuclear Regulatory Commission (NRC or the Commission) issued Draft Regulatory Guide, DG- 1282, ``Fuel Oil Systems for Emergency Power Supplies,'' in the Federal Register for a 60 day public comment period. The NRC is extending the public comment period for DG-1282 from August 31, 2012 to September 28, 2012. This guide describes a method that the NRC staff considers acceptable for use in complying with the Commission's requirements regarding fuel oil systems for safety-related emergency diesel generators and oil-fueled gas turbine generators, including assurance of adequate fuel oil quality.
Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station Receipt of Request for Action
Document Number: 2012-19537
Type: Notice
Date: 2012-08-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: 2012-19312
Type: Notice
Date: 2012-08-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register notice with a 60-day comment period on this information collection on May 18, 2012 (77 FR 29697). 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: Title 10 of the Code of Federal Regulations (10 CFR) Part 51Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions. 3. Current OMB approval number: 3150-0021. 4. The form number if applicable: N/A. 5. How often the collection is required: Upon submittal of an application for a construction permit, operating license, operating license renewal, early site review, design certification review, decommissioning or termination review, or manufacturing license, or upon submittal of a petition for rulemaking. 6. Who will be required or asked to report: Licensees and applicants requesting approvals for actions proposed in accordance with the provisions of 10 CFR Parts 30, 32, 33, 34, 35, 36, 39, 40, 50, 52, 54, 60, 61, 70, and 72. 7. An estimate of the number of annual responses: 48.31. 8. The estimated number of annual respondents: 48.31. 9. An estimate of the total number of hours needed annually to complete the requirement or request: 100,783. 10. Abstract: The NRC's regulations at 10 CFR Part 51 specifies information to be provided by applicants and licensees so that the NRC can make determinations necessary to adhere to the policies, regulations, and public laws of the United States, which are to be interpreted and administered in accordance with the policies set forth in the National Environmental Policy Act of 1969, as amended. The public may examine and have copied for a fee publicly available documents, including the final supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/doc- comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by September 7, 2012. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date.
Notice of Sunshine Act Meeting
Document Number: 2012-19380
Type: Notice
Date: 2012-08-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Exemption
Document Number: 2012-19268
Type: Notice
Date: 2012-08-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: 2012-19072
Type: Notice
Date: 2012-08-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register notice with a 60-day comment period on this information collection on April 11, 2012 (77 FR 21813). 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: 10 CFR part 30Rules of General Applicability to Domestic Licensing of Byproduct Material. 3. Current OMB approval number: 3150-0017. 4. The form number if applicable: N/A. 5. How often the collection is required: Required reports are collected and evaluated on a continuing basis as events occur. There is a one-time submittal of information to receive a license. Renewal applications are submitted every 10 years. Information submitted in previous applications may be referenced without being resubmitted. In addition, recordkeeping must be performed on an on-going basis. 6. Who will be required or asked to report: All persons applying for or holding a license to manufacture, produce, transfer, receive, acquire, own, possess, or use radioactive byproduct material. 7. An estimate of the number of annual responses: 37,398 (4,999 NRC Licensee responses [2,040 responses + 2,959 recordkeepers] and (32,399 Agreement State Licensee responses [13,267 responses + 19,132 recordkeepers]). 8. The estimated number of annual respondents: 22,091 (2,959 NRC Licensees and 19,132 Agreement State Licensees). 9. An estimate of the total number of hours needed annually to complete the requirement or request: 302,697 (NRC licensees 40,327 hours [18,258 reporting + 22,069 recordkeeping] and Agreement State licensees 262,370 hours [118,913 reporting + 143,457 recordkeeping]). 10. Abstract: Title 10 of the Code of Federal Regulations (10 CFR) part 30, establishes requirements that are applicable to all persons in the United States governing domestic licensing of radioactive byproduct material. The application, reporting and recordkeeping requirements are necessary to permit the NRC to make a determination whether the possession, use, and transfer of byproduct material is in conformance with the Commission's regulations for protection of the public health and safety. The public may examine and have copied for a fee publicly available documents, including the final supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/doc- comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by September 5, 2012. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date.
Sunshine Act Meeting
Document Number: 2012-19100
Type: Notice
Date: 2012-08-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Access Authorization Fees; Correction
Document Number: 2012-18934
Type: Rule
Date: 2012-08-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is correcting the preamble, or statement of considerations (SOC), and codified text in a direct final rule that was published in the Federal Register on May 3, 2012 (77 FR 26149) and confirmed on June 22, 2012 (77 FR 37553). The direct final rule amended the NRC's access authorization fees charged to licensees for work performed under the Material Access Authorization Program (MAAP) and the Information Access Authority Program (IAAP). This document is necessary to correct an email address, a codification error, a misspelled abbreviation, and the authority citations.
Amendments to Adjudicatory Process Rules and Related Requirements
Document Number: 2012-18278
Type: Rule
Date: 2012-08-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is amending its adjudicatory rules of practice. This rule makes changes to the NRC's adjudicatory process that the NRC believes will promote fairness, efficiency, and openness in NRC adjudicatory proceedings. This rule also corrects errors and omissions that have been identified since the major revisions to the NRC's rules of practice in early 2004.
Proposed Revision 0 to Standard Review Plan Section 19.5: Adequacy of Design Features and Functional Capabilities Identified and Described for Withstanding Aircraft Impacts
Document Number: 2012-18864
Type: Notice
Date: 2012-08-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on a proposed revision to its Standard Review Plan (SRP), NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.'' The NRC seeks comments on a new section of the SRP: Section 19.5: ``Adequacy of Design Features and Functional Capabilities Identified and Described for Withstanding Aircraft Impacts,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12138A468), under Title 10 of the Code of Federal Regulations (10 CFR) part 52. The current SRP does not contain guidance on Aircraft Impact Assessment.
Interim Staff Guidance on Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 AMP XI.M41, “Buried and Underground Piping and Tanks”
Document Number: 2012-18862
Type: Notice
Date: 2012-08-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing the final License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-03, ``Changes to GALL Report Revision 2 Aging Management Program (AMP) XI.M41, `Buried and Underground Piping and Tanks'.'' This LR-ISG provides changes to the recommendations in GALL Report Revision 2 AMP XI.M41 based on the staff's review of several license renewal applications' buried and underground piping and tanks AMPs and stakeholder input. The LR-ISG revises NRC staff recommended AMPs in NUREG-1801, Revision 2, ``Generic Aging Lessons Learned (GALL) Report,'' and the NRC staff's aging management review procedure and acceptance criteria contained in NUREG-1800, Revision 2, ``Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants'' (SRP-LR). The NRC published Revision 2 of the SRP-LR and GALL Report in December 2010, and they are available in the NRC's Agencywide Documents Access and Management System (ADAMS) under Accession Nos. ML103490041 and ML103490036, respectively.
Agency Information Collection Activities: Submission for the Office of Management and Budget Review; Comment Request
Document Number: 2012-18779
Type: Notice
Date: 2012-08-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted to the Office of Management and Budget (OMB) for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register Notice with a 60-day comment period on this information collection on March 5, 2012. 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: Requests to Non- Agreement States for Information. 3. Current OMB approval number: 3150-0200. 4. The form number if applicable: N/A. 5. How often the collection is required: 8 times per year. 6. Who will be required or asked to report: The 15 Non-Agreement States (13 States, the District of Columbia and the Commonwealth of Puerto Rico that have not signed Section 274(b) Agreements with the NRC). 7. An estimate of the number of annual responses: 120. 8. The estimated number of annual respondents: 15. 9. An estimate of the total number of hours needed annually to complete the requirement or request: 1,089. 10. Abstract: Requests may be made of Non-Agreement States that are similar to those of Agreement States to provide a more complete overview of the national program for regulating radioactive materials. This information would be used in the decision-making of the Commission. With Agreement States and as part of the NRC's cooperative post-agreement program with the States pursuant to Section 274(b), information on licensing and inspection practices, and/or incidents, and other technical and statistical information are exchanged. Therefore, information requests sought may take the form of surveys, e.g., telephonic and electronic surveys/polls and facsimiles. The public may examine and have copied for a fee, publicly available documents, including the final supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The OMB clearance requests are available on the NRC's Web site: https://www.nrc.gov/public-involve/doc- comment/omb/. The document will be available on the NRC's Web site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by August 31, 2012. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2012-18778
Type: Notice
Date: 2012-08-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the Office of Management and Budget's (OMB) approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Title 10 of the Code of Federal Regulations (10 CFR) Part 60, ``Disposal of High-Level Radioactive Wastes in Geologic Repositories.'' 2. Current OMB approval number: 3150-0127. 3. How often the collection is required: The information need only be submitted one time. 4. Who is required or asked to report: State or Indian tribes, or their representatives, requesting consultation with the NRC staff regarding review of a potential high-level radioactive waste geologic repository site, or wishing to participate in a license application review for a potential geologic repository (other than a potential geologic repository site at Yucca Mountain, Nevada, which is regulated under 10 CFR part 63. 5. The number of annual respondents: 1; however, none are expected in the next 3 years. 6. The number of hours needed annually to complete the requirement or request: 1; however, none are expected in the next 3 years. 7. Abstract: Part 60 of 10 CFR requires States and Indian tribes to submit certain information to the NRC if they request consultation with the NRC staff concerning the review of a potential repository site, or wish to participate in a license application review for a potential repository (other than the Yucca Mountain, Nevada site, which is regulated under 10 CFR part 63). Representatives of States or Indian tribes must submit a statement of their authority to act in such a representative capacity. The information submitted by the States and Indian tribes is used by the Director of the Office of Nuclear Material Safety and Safeguards as a basis for decisions about the commitment of NRC staff resources to the consultation and participation efforts. The NRC anticipates conducting a public rulemaking to revise portions of 10 CFR part 60 in the near future (i.e., within the next 5 years). If, as part of this rulemaking, revisions are made affecting the information collection requirements, the NRC will follow OMB requirements for obtaining approval for any revised information collection requirements. [Note: All of the information collection requirements pertaining to Yucca Mountain were included in 10 CFR part 63, and were approved by OMB under control number 3150-0199. The Yucca Mountain site is regulated under 10 CFR part 63 (66 FR 55792, November 2, 2001).] Submit, by October 1, 2012, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied, for a fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The OMB clearance requests are available on the NRC's Web site: https://www.nrc.gov/public-involve/doc- comment/omb/. The document will be available on the NRC's Web site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2012- 0149. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2012-0149. Mail comments to NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301- 415-6258, or by email to INFOCOLLECTS.Resource@NRC.GOV.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.