Nuclear Regulatory Commission February 2010 – Federal Register Recent Federal Regulation Documents

Office of New Reactors; Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System
Document Number: 2010-2287
Type: Notice
Date: 2010-02-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC staff is soliciting public comment on its proposed Interim Staff Guidance (ISG) DC/COL-ISG-021 titled ``Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092640035). This ISG provides new guidance information for applicants submitting a combined license (COL) or design certification (DC) for construction and operation of new reactors submitted under Title 10 of the Code of Federal Regulations, Part 52. In addition, it supplements the guidance provided to the NRC staff in other sections of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' March 2007, Standard Review Plan (SRP), Section 8.3.1 and Sections 9.5.4 through 9.5.8. The NRC staff issues DC/COL-ISGs to facilitate timely implementation of current staff guidance and to facilitate activities associated with review of applications for DCs and COLs by the Office of New Reactors (NRO). The NRC staff intends to incorporate the final approved DC/COL-ISG-021 into the next revision of SRP Section 8.3.1 and Sections 9.5.4 through 9.5.8 and Regulatory Guide 1.206, ``Combined License Applications for Nuclear Power Plants (LWR Edition),'' June 2007.
Draft Regulatory Guide: Issuance, Availability
Document Number: 2010-2285
Type: Notice
Date: 2010-02-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events; Correction
Document Number: 2010-2283
Type: Rule
Date: 2010-02-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This document corrects a rule that appeared in the Federal Register on January 4, 2010 (75 FR 13), that amends the NRC's regulations to provide alternate fracture toughness requirements for protection against pressurized thermal shock (PTS) events for pressurized water reactor (PWR) pressure vessels. This document is necessary to correct formatting and typographical errors in paragraph (g).
Sunshine Act; Meeting Notice
Document Number: 2010-2251
Type: Notice
Date: 2010-02-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice of Extension of Comment Period for NUREG-1934, Nuclear Power Plant Fire Modeling Application Guide (NPP FIRE MAG), Draft Report for Comment
Document Number: 2010-2168
Type: Notice
Date: 2010-02-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC) published a notice of opportunity for public comment on ``NUREG-1934 (EPRI 1019195), Nuclear Power Plant Fire Modeling Application Guide (NPP FIRE MAG), Draft Report for Comment'' in the Federal Register (74 FR 68873) on December 29, 2009. Issues encountered during the holiday season delayed publication of NUREG-1934. In addition, the final document has been revised to correct some editorial issues resulting from the conversion to a pdf file.
Office of New Reactors; Final Interim Staff Guidance on Post-Combined License Commitments
Document Number: 2010-2137
Type: Notice
Date: 2010-02-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC is issuing its Final Interim Staff Guidance (ISG) ESP/ DC/COL-ISG-015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093561416). This ISG supplements the guidance provided to the NRC staff in Section 1.0, ``Introduction and Interfaces,'' of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' concerning the review of applications to support early site permit (ESP), design certification (DC) and combined license (COL) applications. In addition, this ISG supplements the guidance provided in Section C.III.4 of Regulatory Guide (RG) 1.206, ``Regulatory Guide for Combined License Applications for Nuclear Power Plants,'' June 2007.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.