Luminant Generation Company LLC; Comanche Peak Steam Electric Station, Units 1 and 2; Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment To Increase the Maximum Reactor Power Level
Document Number: E8-9456
Type: Notice
Date: 2008-04-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC has prepared a Draft Environmental Assessment (EA) as its evaluation of a request by the TXU Generation Company LP (subsequently renamed Luminant Generation Company LLC, the licensee), for a license amendment to increase the maximum thermal power at the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, from 3458 megawatts thermal (MWt) to 3612 MWt at each unit. The NRC staff did not identify any significant impact from the information provided in the licensee's stretch power uprate (SPU) application for CPSES, Units 1 and 2 or from the NRC staff's independent review; therefore, the NRC staff is documenting its environmental review in a draft EA. The draft EA and Finding of No Significant Impact are being published in the Federal Register with a 30-day public comment period.
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: E8-9452
Type: Notice
Date: 2008-04-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register Notice with a 60-day comment period on this information collection on January 28, 2008. 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: 10 CFR Part 75 Safeguards on Nuclear Material, Implementation of US/IAEA Agreement. 3. Current OMB approval number: OMB 3150-0055. 4. The form number if applicable: Not applicable. 5. How often the collection is required: Reporting is done when specified events occur. Recordkeeping for nuclear material accounting and control information is done in accordance with specific instructions. 6. Who will be required or asked to report: Licensees of facilities on the U.S. eligible list who have been selected by the International Atomic Energy Agency (IAEA) for reporting or recordkeeping activities. 7. An estimate of the number of annual responses: 8 (2 responses for reporting + 6 recordkeepers). 8. The estimated number of annual respondents: Six, two of which perform both reporting and recordkeeping and four of which perform recordkeeping only. 9. An estimate of the total number of hours needed annually to complete the requirement or request: 2,400 (6 Respondents x 400 hours per response). 10. Abstract: 10 CFR Part 75 requires selected licensees to permit inspections by IAEA representatives, give immediate notice to the NRC in specified situations involving the possibility of loss of nuclear material, and give notice for imports and exports of specified amounts of nuclear material. These licensees will also follow written material accounting and control procedures, although actual reporting of transfer and material balance records to the IAEA will be done through the U. S. State system (Nuclear Materials Management and Safeguards System, collected under OMB clearance numbers 3150-0003, 3150-0004, 3150-0057, and 3150-0058.) The NRC needs this information to implement its responsibilities under the US/IAEA agreement. A copy of the final supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by May 30, 2008. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. Nathan J. Frey, Office of Information and Regulatory Affairs (3150-0055), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be e-mailed to Nathan_J._Frey@omb.eop.gov or submitted by telephone at (202) 395-7345. The NRC Clearance Officer is Margaret A. Janney, (301) 415-7245.
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: E8-9449
Type: Notice
Date: 2008-04-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register Notice with a 60-day comment period on this information collection on January 31, 2008. 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: 10 CFR 81, ``Standard Specifications for Granting of Patent Licenses.'' 3. Current OMB approval number: 3150-0121. 4. The form number if applicable: Not applicable. 5. How often the collection is required: Applications for licenses are submitted once. Other reports are submitted annually or as other events require. 6. Who will be required or asked to report: Applicants for and holders of NRC licenses to NRC inventions. 7. An estimate of the number of annual responses: 1. 8. The estimated number of annual respondents: 1. 9. An estimate of the total number of hours needed annually to complete the requirement or request: 37; however, no applications are anticipated during the next three years. 10. Abstract: As specified in 10 CFR part 81, the NRC may grant non-exclusive licenses or limited exclusive licenses to its patented inventions to responsible applicants. Applicants for licenses to NRC inventions are required to provide information which may provide the basis for granting the requested license. In addition, all license holders must submit periodic reports on efforts to bring the invention to a point of practical application and the extent to which they are making the benefits of the invention reasonably accessible to the public. Exclusive license holders must submit additional information if they seek to extend their licenses, issue sublicenses, or transfer the licenses. In addition, if requested, exclusive license holders must promptly supply to the United States Government copies of all pleadings and other papers filed in any patent infringement lawsuit, as well as evidence from proceedings relating to the licensed patent. A copy of the final supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by May 30, 2008. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. Nathan J. Frey, Office of Information and Regulatory Affairs (3150-0121), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be e-mailed to Nathan_J._Frey@omb.eop.gov or submitted by telephone at (202) 395-7345. The NRC Clearance Officer is Margaret A. Janney, (301) 415-7245.
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: E8-9446
Type: Notice
Date: 2008-04-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register Notice with a 60-day comment period on this information collection on January 31, 2008. 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: Design Information QuestionnaireIAEA-N71 and associated Forms N-72, N-73, N-74, N-75, N- 91, N-92, N-93, N-94. 3. Current OMB approval number: OMB 3150-0056. 4. The form number if applicable: N-71, N-72, N-73, N-74, N-75, N- 91, N-92, N-93, and N-94. 5. How often the collection is required: Approximately 1 time annually. 6. Who will be required or asked to report: Licensees of facilities on the U.S. eligible list who have been notified in writing by the NRC to submit the form. 7. An estimate of the number of annual responses: 1. 8. The estimated number of annual respondents: 1. 9. An estimate of the total number of hours needed annually to complete the requirement or request: 360 reporting hours (1 respondent x 360 hours per response). 10. Abstract: In order for the United States to fulfill its responsibilities as a participant in the U.S./International Atomic Energy Agency (IAEA) Safeguards Agreement, the NRC must collect information from licensees about their installations and provide it to the IAEA. Licensees of facilities that appear on the U.S. eligible list and have been notified in writing by the NRC are required to complete and submit a Design Information Questionnaire, IAEA Form N-71 (and the appropriate associated IAEA Form) or Form N-91, to provide information concerning their installation for use of the IAEA. A copy of the final supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by May 30, 2008. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. Nathan J. Frey, Office of Information and Regulatory Affairs (3150-0056), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be e-mailed to Nathan_J._Frey@omb.eop.gov or submitted by telephone at (202) 395-7345. The NRC Clearance Officer is Margaret A. Janney, (301) 415-7245.
Sunshine Federal Register Notice
Document Number: 08-1196
Type: Notice
Date: 2008-04-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions