Texas Eastern Transmission, LP; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Amendment to the Certificate of Public Convenience and Necessity for the Entriken Amendment Project, 7682-7685 [2025-01428]

Download as PDF 7682 Federal Register / Vol. 90, No. 13 / Wednesday, January 22, 2025 / Notices regulations,3 and must be submitted by the protest deadline, which is March 17, 2025. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. lotter on DSK11XQN23PROD with NOTICES1 Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is March 17, 2025. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before March 17, 3 18 CFR 157.205(e). CFR 385.214. 5 18 CFR 157.10. 4 18 VerDate Sep<11>2014 18:16 Jan 21, 2025 Jkt 265001 2025. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP25–45–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 6 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP25–45– 000. To file via USPS: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To file via any other method: DebbieAnne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail at: David A. Alonzo, Manager of Project Authorizations, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas, or by email (with a link to the document) at david_alonzo@tcenergy.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project 6 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: January 14, 2025. Debbie-Anne A. Reese, Secretary. [FR Doc. 2025–01431 Filed 1–21–25; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP25–24–000] Texas Eastern Transmission, LP; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Amendment to the Certificate of Public Convenience and Necessity for the Entriken Amendment Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental document, that will discuss the environmental impacts for the Entriken Amendment Project (Amendment Project) involving abandonment of facilities by Texas Eastern Transmission, LP (Texas Eastern) in Huntingdon County, Pennsylvania. This is a proposed amendment to Certificate of Public Convenience and Necessity for the Armagh and Entriken Replacement Project (2023 Order) under docket CP22–486–000, issued on October 23, 2023. The Commission will use this environmental document in its decision-making process. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies regarding the project. As part of the National Environmental Policy Act (NEPA) review process, the Commission takes E:\FR\FM\22JAN1.SGM 22JAN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 90, No. 13 / Wednesday, January 22, 2025 / Notices into account concerns the public may have about proposals and the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. This gathering of public input is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the environmental document on the important environmental issues. Additional information about the Commission’s NEPA process is described below in the NEPA Process and Environmental Document section of this notice. By this notice, the Commission requests public comments on the scope of issues to address in the environmental document. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00pm Eastern Time on February 13, 2025. Comments may be submitted in written form. Further details on how to submit comments are provided in the Public Participation section of this notice. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the environmental document. Commission staff will consider all written comments during the preparation of the environmental document. If you submitted comments on this project to the Commission before the opening of this docket on December 9, 2024, you would need to file those comments in Docket No. CP25–24–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the project, the Natural Gas Act conveys the right of eminent domain to the company. Therefore, if you and the company do not reach an easement VerDate Sep<11>2014 18:16 Jan 21, 2025 Jkt 265001 agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. The Commission does not subsequently grant, exercise, or oversee the exercise of that eminent domain authority. The courts have exclusive authority to handle eminent domain cases; the Commission has no jurisdiction over these matters. Texas Eastern provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ which addresses typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. This fact sheet along with other landowner topics of interest are available for viewing on the FERC website (www.ferc.gov) under the Natural Gas, Landowner Topics link. Public Participation There are three methods you can use to submit your comments to the Commission. Please carefully follow these instructions so that your comments are properly recorded. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. (1) You can file your comments electronically using the eComment feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. Using eComment is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; a comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (CP25–24–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 7683 addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Additionally, the Commission offers a free service called eSubscription which makes it easy to stay informed of all issuances and submittals regarding the dockets/projects to which you subscribe. These instant email notifications are the fastest way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. Go to https:// www.ferc.gov/ferc-online/overview to register for eSubscription. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202)502–6595 or OPP@ ferc.gov. Summary of the Proposed Project Under the 2023 Order, the Armagh and Entriken Replacement Project consisted of the abandonment of pipeline facilities, construction of pipeline facilities, and the abandonment of gas-driven compression facilities to be replaced with electric-motor driven (EMD) facilities. With the Amendment Project, Texas Eastern proposes to modify the certificated facilities at the Entriken Compressor Station from a 24,000 horsepower (hp) electric-motor driven compressor unit to a 24,306 hp gas-driven compressor unit. The Amendment Project is proposed due to uncertainties regarding obtaining the electrical transmission power needed at the Entriken Station to support the EMD compressor unit approved in the 2023 Order. Specifically, the Amendment Project would consist of the following: • installation of one 24,306-hp Solar Titan 250 Gas Turbine compressor unit; • abandonment of one 22,000-hp GE Frame 5 gas-driven compressor unit and the associated auxiliary piping and equipment; • re-use of air-cooled heat exchangers to service the existing Titan 250 Compressor unit (2T); • installation of 4 bays of new aircooled heat exchangers to service new Titan 250 gas-driven compressor unit (3T); E:\FR\FM\22JAN1.SGM 22JAN1 7684 Federal Register / Vol. 90, No. 13 / Wednesday, January 22, 2025 / Notices • installation of new domestic gas meter and odorizer; • installation of a new compressor building, office building, and electrical and control building; • installation of a new recompression building and new battery building; • minor station piping modifications; and • installation of other appurtenant facilities. Land Requirements for Construction The Amendment Project would be within the workspaces approved in the 2023 Order, on an approximately 55acre property owned by Texas Eastern and lies within a fenced area encompassing approximately 18 acres. Approximately 28.70 acres of land would be disturbed during construction, including 18.10 acres of land within the existing fence line of the station and 10.60 acres of workspace which would expand the station fence line to encompass the new compressor building and office building. lotter on DSK11XQN23PROD with NOTICES1 NEPA Process and the Environmental Document Any environmental document issued by the Commission will discuss impacts that could occur as a result of the construction and operation of the proposed project under the relevant general resource areas: • geology and soils; • water resources and wetlands; • vegetation and wildlife; • threatened and endangered species; • cultural resources; • land use; • environmental justice; • air quality and noise; and • reliability and safety. Commission staff will also evaluate reasonable alternatives to the proposed project or portions of the project and make recommendations on how to lessen or avoid impacts on the various resource areas. Your comments will help Commission staff identify and focus on the issues that might have an effect on the human environment and potentially eliminate others from further study and discussion in the environmental document. Following this scoping period, Commission staff will determine whether to prepare an Environmental Assessment (EA) or an Environmental Impact Statement (EIS). The EA or the EIS will present Commission staff’s independent analysis of the issues. If Commission staff prepares an EA, a ‘‘Notice of Schedule for the Preparation of an Environmental Assessment’’ will be issued. The EA may be issued for an allotted public comment period. The VerDate Sep<11>2014 18:16 Jan 21, 2025 Jkt 265001 Commission would consider timely comments on the EA before making its decision regarding the proposed project. If Commission staff prepares an EIS, a ‘‘Notice of Intent to Prepare an EIS/ Notice of Schedule’’ will be issued, which will open up an additional comment period. Staff will then prepare a draft EIS which will be issued for public comment. Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS. Any EA or draft and final EIS will be available in electronic format in the public record through eLibrary 1 and the Commission’s natural gas environmental documents web page (https://www.ferc.gov/industries-data/ natural-gas/environment/ environmental-documents). If eSubscribed, you will receive instant email notification when the environmental document is issued. With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues of this project to formally cooperate in the preparation of the environmental document.2 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultation Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Office(s), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.3 The environmental document for this project will document findings on the impacts on historic properties and summarize the status of consultations under section 106. 1 For instructions on connecting to eLibrary, refer to the last page of this notice. 2 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at title 40, Code of Federal Regulations (CFR), section 1501.8. 3 The Advisory Council on Historic Preservation’s regulations are at 36 CFR part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 Environmental Mailing List The environmental mailing list includes Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project and includes a mailing address with their comments. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that Commission notices related to this environmental review are sent to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please complete one of the following steps: (1) Send an email to GasProjectAddressChange@ferc.gov stating your request. You must include the docket number CP25–24–000 in your request. If you are requesting a change to your address, please be sure to include your name and the correct address. If you are requesting to delete your address from the mailing list, please include your name and address as it appeared on this notice. This email address is unable to accept comments. OR (2) Return the attached ‘‘Mailing List Update Form’’ (appendix 2). Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. E:\FR\FM\22JAN1.SGM 22JAN1 Federal Register / Vol. 90, No. 13 / Wednesday, January 22, 2025 / Notices Public sessions or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/newsevents/events along with other related information. Dated: January 14, 2025. Debbie-Anne A. Reese, Secretary. [FR Doc. 2025–01428 Filed 1–21–25; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 349–245] lotter on DSK11XQN23PROD with NOTICES1 Alabama Power Company; Notice of Application for Non-Project Use of Project Land and Waters Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Project Use of Project Lands and Waters. b. Project No: 349–245. c. Date Filed: July 26, 2024. d. Applicant: Alabama Power Company. e. Name of Project: Martin Dam Hydroelectric Project. f. Location: The Martin Dam Hydroelectric Project is located in Tallapoosa, Elmore, and Coosa counties, Alabama; the proposed docks would be located in Elmore County. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Unzell Kelley, Alabama Power Company (205) 517– 0885 ukelley@southernco.com. i. FERC Contact: Mary Karwoski, (678) 245–3027, mary.karwoski@ ferc.gov. j. Cooperating agencies: With this notice, the Commission is inviting Federal, State, local, and Tribal agencies with jurisdiction and/or special expertise with respect to environmental issues affected by the proposal, that wish to cooperate in the preparation of any environmental document, if applicable, to follow the instructions for filing such requests described in item k below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of any environmental document cannot also intervene. See 94 FERC ¶ 61,076 (2001). k. Deadline for filing comments, motions to intervene, and protests: February 14, 2025. VerDate Sep<11>2014 18:16 Jan 21, 2025 Jkt 265001 The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P–349–245. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. l. Description of Request: The licensee requests Commission authorization to permit Harmony Cove, LLC to construct one residential dock which would accommodate 16 watercrafts, as part of the common area of Harmony Cove Subdivision. The licensee previously permitted a ten-slip dock and concrete boat ramp in 2021. The proposal would allow the existing boat ramp and two docks which would accommodate a total of 26 watercraft. m. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/esubscription. asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email PO 00000 Frm 00032 Fmt 4703 Sfmt 9990 7685 FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. p. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. q. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202)502–6595 or OPP@ ferc.gov. Dated: January 15, 2025. Debbie-Anne A. Reese, Secretary. [FR Doc. 2025–01502 Filed 1–21–25; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\22JAN1.SGM 22JAN1

Agencies

[Federal Register Volume 90, Number 13 (Wednesday, January 22, 2025)]
[Notices]
[Pages 7682-7685]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2025-01428]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP25-24-000]


Texas Eastern Transmission, LP; Notice of Scoping Period 
Requesting Comments on Environmental Issues for the Proposed Amendment 
to the Certificate of Public Convenience and Necessity for the Entriken 
Amendment Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental document, that will discuss 
the environmental impacts for the Entriken Amendment Project (Amendment 
Project) involving abandonment of facilities by Texas Eastern 
Transmission, LP (Texas Eastern) in Huntingdon County, Pennsylvania. 
This is a proposed amendment to Certificate of Public Convenience and 
Necessity for the Armagh and Entriken Replacement Project (2023 Order) 
under docket CP22-486-000, issued on October 23, 2023. The Commission 
will use this environmental document in its decision-making process.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies regarding the project. As part of the National Environmental 
Policy Act (NEPA) review process, the Commission takes

[[Page 7683]]

into account concerns the public may have about proposals and the 
environmental impacts that could result from its action whenever it 
considers the issuance of a Certificate of Public Convenience and 
Necessity. This gathering of public input is referred to as 
``scoping.'' The main goal of the scoping process is to focus the 
analysis in the environmental document on the important environmental 
issues. Additional information about the Commission's NEPA process is 
described below in the NEPA Process and Environmental Document section 
of this notice.
    By this notice, the Commission requests public comments on the 
scope of issues to address in the environmental document. To ensure 
that your comments are timely and properly recorded, please submit your 
comments so that the Commission receives them in Washington, DC on or 
before 5:00pm Eastern Time on February 13, 2025. Comments may be 
submitted in written form. Further details on how to submit comments 
are provided in the Public Participation section of this notice.
    Your comments should focus on the potential environmental effects, 
reasonable alternatives, and measures to avoid or lessen environmental 
impacts. Your input will help the Commission staff determine what 
issues they need to evaluate in the environmental document. Commission 
staff will consider all written comments during the preparation of the 
environmental document.
    If you submitted comments on this project to the Commission before 
the opening of this docket on December 9, 2024, you would need to file 
those comments in Docket No. CP25-24-000 to ensure they are considered 
as part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the project, the Natural Gas Act conveys the right of eminent 
domain to the company. Therefore, if you and the company do not reach 
an easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law. The Commission does 
not subsequently grant, exercise, or oversee the exercise of that 
eminent domain authority. The courts have exclusive authority to handle 
eminent domain cases; the Commission has no jurisdiction over these 
matters.
    Texas Eastern provided landowners with a fact sheet prepared by the 
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do 
I Need To Know?'' which addresses typically asked questions, including 
the use of eminent domain and how to participate in the Commission's 
proceedings. This fact sheet along with other landowner topics of 
interest are available for viewing on the FERC website (www.ferc.gov) 
under the Natural Gas, Landowner Topics link.

Public Participation

    There are three methods you can use to submit your comments to the 
Commission. Please carefully follow these instructions so that your 
comments are properly recorded. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. Using eComment is an easy method for 
submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; a comment on a particular project is considered a ``Comment 
on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the project docket number (CP25-
24-000) on your letter. Submissions sent via the U.S. Postal Service 
must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852.
    Additionally, the Commission offers a free service called 
eSubscription which makes it easy to stay informed of all issuances and 
submittals regarding the dockets/projects to which you subscribe. These 
instant email notifications are the fastest way to receive notification 
and provide a link to the document files which can reduce the amount of 
time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202)502-6595 or [email protected].

Summary of the Proposed Project

    Under the 2023 Order, the Armagh and Entriken Replacement Project 
consisted of the abandonment of pipeline facilities, construction of 
pipeline facilities, and the abandonment of gas-driven compression 
facilities to be replaced with electric-motor driven (EMD) facilities. 
With the Amendment Project, Texas Eastern proposes to modify the 
certificated facilities at the Entriken Compressor Station from a 
24,000 horsepower (hp) electric-motor driven compressor unit to a 
24,306 hp gas-driven compressor unit. The Amendment Project is proposed 
due to uncertainties regarding obtaining the electrical transmission 
power needed at the Entriken Station to support the EMD compressor unit 
approved in the 2023 Order.
    Specifically, the Amendment Project would consist of the following:
     installation of one 24,306-hp Solar Titan 250 Gas Turbine 
compressor unit;
     abandonment of one 22,000-hp GE Frame 5 gas-driven 
compressor unit and the associated auxiliary piping and equipment;
     re-use of air-cooled heat exchangers to service the 
existing Titan 250 Compressor unit (2T);
     installation of 4 bays of new air-cooled heat exchangers 
to service new Titan 250 gas-driven compressor unit (3T);

[[Page 7684]]

     installation of new domestic gas meter and odorizer;
     installation of a new compressor building, office 
building, and electrical and control building;
     installation of a new recompression building and new 
battery building;
     minor station piping modifications; and
     installation of other appurtenant facilities.

Land Requirements for Construction

    The Amendment Project would be within the workspaces approved in 
the 2023 Order, on an approximately 55-acre property owned by Texas 
Eastern and lies within a fenced area encompassing approximately 18 
acres. Approximately 28.70 acres of land would be disturbed during 
construction, including 18.10 acres of land within the existing fence 
line of the station and 10.60 acres of workspace which would expand the 
station fence line to encompass the new compressor building and office 
building.

NEPA Process and the Environmental Document

    Any environmental document issued by the Commission will discuss 
impacts that could occur as a result of the construction and operation 
of the proposed project under the relevant general resource areas:
     geology and soils;
     water resources and wetlands;
     vegetation and wildlife;
     threatened and endangered species;
     cultural resources;
     land use;
     environmental justice;
     air quality and noise; and
     reliability and safety.
    Commission staff will also evaluate reasonable alternatives to the 
proposed project or portions of the project and make recommendations on 
how to lessen or avoid impacts on the various resource areas. Your 
comments will help Commission staff identify and focus on the issues 
that might have an effect on the human environment and potentially 
eliminate others from further study and discussion in the environmental 
document.
    Following this scoping period, Commission staff will determine 
whether to prepare an Environmental Assessment (EA) or an Environmental 
Impact Statement (EIS). The EA or the EIS will present Commission 
staff's independent analysis of the issues. If Commission staff 
prepares an EA, a ``Notice of Schedule for the Preparation of an 
Environmental Assessment'' will be issued. The EA may be issued for an 
allotted public comment period. The Commission would consider timely 
comments on the EA before making its decision regarding the proposed 
project. If Commission staff prepares an EIS, a ``Notice of Intent to 
Prepare an EIS/Notice of Schedule'' will be issued, which will open up 
an additional comment period. Staff will then prepare a draft EIS which 
will be issued for public comment. Commission staff will consider all 
timely comments received during the comment period on the draft EIS and 
revise the document, as necessary, before issuing a final EIS. Any EA 
or draft and final EIS will be available in electronic format in the 
public record through eLibrary \1\ and the Commission's natural gas 
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you 
will receive instant email notification when the environmental document 
is issued.
---------------------------------------------------------------------------

    \1\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this project to formally cooperate in the 
preparation of the environmental document.\2\ Agencies that would like 
to request cooperating agency status should follow the instructions for 
filing comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \2\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at title 40, Code of Federal 
Regulations (CFR), section 1501.8.
---------------------------------------------------------------------------

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Office(s), 
and to solicit their views and those of other government agencies, 
interested Indian tribes, and the public on the project's potential 
effects on historic properties.\3\ The environmental document for this 
project will document findings on the impacts on historic properties 
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \3\ The Advisory Council on Historic Preservation's regulations 
are at 36 CFR part 800. Those regulations define historic properties 
as any prehistoric or historic district, site, building, structure, 
or object included in or eligible for inclusion in the National 
Register of Historic Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes Federal, State, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project and includes a mailing address with their 
comments. Commission staff will update the environmental mailing list 
as the analysis proceeds to ensure that Commission notices related to 
this environmental review are sent to all individuals, organizations, 
and government entities interested in and/or potentially affected by 
the proposed project.
    If you need to make changes to your name/address, or if you would 
like to remove your name from the mailing list, please complete one of 
the following steps:
    (1) Send an email to [email protected] stating your 
request. You must include the docket number CP25-24-000 in your 
request. If you are requesting a change to your address, please be sure 
to include your name and the correct address. If you are requesting to 
delete your address from the mailing list, please include your name and 
address as it appeared on this notice. This email address is unable to 
accept comments.
OR

    (2) Return the attached ``Mailing List Update Form'' (appendix 2).

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number 
in the ``Docket Number'' field. Be sure you have selected an 
appropriate date range. For assistance, please contact FERC Online 
Support at [email protected] or (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of all formal documents issued by the Commission, such as orders, 
notices, and rulemakings.

[[Page 7685]]

    Public sessions or site visits will be posted on the Commission's 
calendar located at https://www.ferc.gov/news-events/events along with 
other related information.

    Dated: January 14, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-01428 Filed 1-21-25; 8:45 am]
BILLING CODE 6717-01-P