Rover Pipeline LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Rover-Bulger Delivery Meter Station Project, 636-637 [2024-31649]
Download as PDF
636
Federal Register / Vol. 90, No. 3 / Monday, January 6, 2025 / Notices
Docket Numbers: ER25–828–000.
Applicants: Ringer Hill Wind, LLC.
Description: Compliance filing:
Updated Market Power Analysis for the
NE Region & Non-Material Change in
Status to be effective 12/31/2024.
Filed Date: 12/30/24.
Accession Number: 20241230–5181.
Comment Date: 5 p.m. ET 1/21/25.
khammond on DSK9W7S144PROD with NOTICES
Docket Numbers: ER25–829–000.
Applicants: Smith Creek Hydro, LLC.
Description: Initial Rate Filing:
Baseline new to be effective 12/31/2024.
Filed Date: 12/30/24.
Accession Number: 20241230–5209.
Comment Date: 5 p.m. ET 1/21/25.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 30, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–31653 Filed 1–3–25; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:04 Jan 03, 2025
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–14581–002]
Turlock & Modesto Irrigation District;
Notice of Reasonable Period of Time
for Water Quality Certification
Application
On December 13, 2024, the Turlock &
Modesto Irrigation District submitted to
the Federal Energy Regulatory
Commission (Commission) a copy of its
application for Clean Water Act section
401(a)(1) water quality certification filed
with the California State Water
Resources Control Board (Water Board),
in conjunction with the above captioned
project. The submittal also included a
response from the Water Board stating
that it received the application on the
same day. Pursuant to section 5.23(b) of
the Commission’s regulations,1 we
hereby notify the Water Board of the
following:
Date of Receipt of the Certification
Request: December 13, 2024
Reasonable Period of Time to Act on
the Certification Request: December 13,
2025.
If the Water Board fails or refuses to
act on the water quality certification
request on or before the above date, then
the certifying authority is deemed
waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C.
1341(a)(1).
Dated: December 30, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–31650 Filed 1–3–25; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP25–12–000]
Rover Pipeline LLC; Notice of
Schedule for the Preparation of an
Environmental Assessment for the
Rover—Bulger Delivery Meter Station
Project
On October 31, 2024, Rover Pipeline
LLC (Rover), filed an application in
Docket No. CP25–12–000 requesting a
Certificate of Public Convenience and
Necessity pursuant to section 7(c) of the
Natural Gas Act to construct, own, and
operate certain natural gas pipeline
facilities necessary to expand its
existing Bulger Compressor Station in
1 18
Jkt 265001
PO 00000
CFR 5.23(b).
Frm 00054
Fmt 4703
Sfmt 4703
Washington County, Pennsylvania. The
proposed project is known as the
Rover—Bulger Compressor Station and
Harmon Creek Meter Station Expansion
Project (Project).
On November 14, 2024, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing Federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a Federal authorization
within 90 days of the date of issuance
of the Commission staff’s environmental
document for the Project.
This notice identifies Commission
staff’s intention to prepare an
environmental assessment (EA) for the
Project and the planned schedule for the
completion of the environmental
review.1
Schedule for Environmental Review
Issuance of EA May 5, 2025
90-day Federal Authorization
Decision Deadline 2 August 4, 2025
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Rover proposes to construct, own, and
operate certain facilities necessary to
expand its existing Harmon Creek
Receipt Meter Station and Bulger
Compressor Station, within its existing
Bulger Compressor Station in
Washington County, Pennsylvania. The
Rover-Bulger Compressor Station and
Harmon Creek Meter Station Expansion
Project would allow Rover to ensure
delivery of Range Resources—
Appalachia LLC’s (Range) requested
transportation quantities at the required
pressures. According to Rover, the
Project is designed to receive up to an
additional 400,000 dekatherms of
natural gas assets per day to Rover.
Rover does not have the authority to
construct facilities pursuant to blanket
certificate authority under Part 157,
Subpart F of the Commission’s
regulations, therefore, Rover was
required to file an application under
part 157 of the Commission’s
regulations.
1 40
CFR 1501.10 (2024).
Commission’s deadline applies to the
decisions of other Federal agencies, and State
agencies acting under federally delegated authority,
that are responsible for Federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by Federal law.
2 The
E:\FR\FM\06JAN1.SGM
06JAN1
Federal Register / Vol. 90, No. 3 / Monday, January 6, 2025 / Notices
Background
DEPARTMENT OF ENERGY
On December 11, 2024, the
Commission issued a Notice of Scoping
Period Requesting Comments on
Environmental Issues for the Proposed
Rover—Bulger Delivery Meter Station
Project (Notice of Scoping). The Notice
of Scoping was sent to affected
landowners; Federal, State, and local
government agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. All substantive
comments will be addressed in the EA.
khammond on DSK9W7S144PROD with NOTICES
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP24–88–000), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Dated: December 30, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–31649 Filed 1–3–25; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:04 Jan 03, 2025
Jkt 265001
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: OR25–6–000.
Applicants: Buckeye Pipe Line
Company, L.P.
Description: Petition for Declaratory
Order of Buckeye Pipe Line Company,
L.P.
Filed Date: 12/20/24.
Accession Number: 20241220–5518.
Comment Date: 5 p.m. ET 1/21/25.
Docket Numbers: RP25–309–000.
Applicants: ETC Tiger Pipeline, LLC.
Description: § 4(d) Rate Filing:
Assignment of Chesapeake NRA to SWN
to be effective 1/1/2025.
Filed Date: 12/30/24.
Accession Number: 20241230–5059.
Comment Date: 5 p.m. ET 1/13/25.
Docket Numbers: RP25–310–000.
Applicants: Gulf Run Transmission,
LLC.
Description: § 4(d) Rate Filing:
Assignment of Chesapeake NRA to SWN
to be effective 1/1/2025.
Filed Date: 12/30/24.
Accession Number: 20241230–5064.
Comment Date: 5 p.m. ET 1/13/25.
Docket Numbers: RP25–311–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing: NRA
Filing—SWEPCO & Comanche to be
effective 1/1/2025.
Filed Date: 12/30/24.
Accession Number: 20241230–5080.
Comment Date: 5 p.m. ET 1/13/25.
Docket Numbers: RP25–312–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing: Cancel
SWEPCO Agreement_2 to be effective 1/
1/2025.
Filed Date: 12/30/24.
Accession Number: 20241230–5081.
Comment Date: 5 p.m. ET 1/13/25.
Docket Numbers: RP25–313–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: Compliance filing: Cash
Out Surcharge True Up Filing 2025 to
be effective 2/1/2025.
Filed Date: 12/30/24.
Accession Number: 20241230–5085.
Comment Date: 5 p.m. ET 1/13/25.
Docket Numbers: RP25–314–000.
Applicants: Texas Eastern
Transmission, LP.
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
637
Description: § 4(d) Rate Filing: TETLP
EPC FEB 2025 FILING to be effective 2/
1/2025.
Filed Date: 12/30/24.
Accession Number: 20241230–5108.
Comment Date: 5 p.m. ET 1/13/25.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP23–466–003.
Applicants: Florida Gas Transmission
Company, LLC.
Description: Compliance filing: RP23–
466–002 Settlement Compliance Filing
to be effective 1/1/2025.
Filed Date: 12/30/24.
Accession Number: 20241230–5141.
Comment Date: 5 p.m. ET 1/13/25.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 30, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–31652 Filed 1–3–25; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\06JAN1.SGM
06JAN1
Agencies
[Federal Register Volume 90, Number 3 (Monday, January 6, 2025)]
[Notices]
[Pages 636-637]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-31649]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP25-12-000]
Rover Pipeline LLC; Notice of Schedule for the Preparation of an
Environmental Assessment for the Rover--Bulger Delivery Meter Station
Project
On October 31, 2024, Rover Pipeline LLC (Rover), filed an
application in Docket No. CP25-12-000 requesting a Certificate of
Public Convenience and Necessity pursuant to section 7(c) of the
Natural Gas Act to construct, own, and operate certain natural gas
pipeline facilities necessary to expand its existing Bulger Compressor
Station in Washington County, Pennsylvania. The proposed project is
known as the Rover--Bulger Compressor Station and Harmon Creek Meter
Station Expansion Project (Project).
On November 14, 2024, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing Federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a Federal authorization
within 90 days of the date of issuance of the Commission staff's
environmental document for the Project.
This notice identifies Commission staff's intention to prepare an
environmental assessment (EA) for the Project and the planned schedule
for the completion of the environmental review.\1\
---------------------------------------------------------------------------
\1\ 40 CFR 1501.10 (2024).
---------------------------------------------------------------------------
Schedule for Environmental Review
Issuance of EA May 5, 2025
90-day Federal Authorization Decision Deadline \2\ August 4, 2025
---------------------------------------------------------------------------
\2\ The Commission's deadline applies to the decisions of other
Federal agencies, and State agencies acting under federally
delegated authority, that are responsible for Federal
authorizations, permits, and other approvals necessary for proposed
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the
Commission's deadline for other agency's decisions applies unless a
schedule is otherwise established by Federal law.
---------------------------------------------------------------------------
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Rover proposes to construct, own, and operate certain facilities
necessary to expand its existing Harmon Creek Receipt Meter Station and
Bulger Compressor Station, within its existing Bulger Compressor
Station in Washington County, Pennsylvania. The Rover-Bulger Compressor
Station and Harmon Creek Meter Station Expansion Project would allow
Rover to ensure delivery of Range Resources--Appalachia LLC's (Range)
requested transportation quantities at the required pressures.
According to Rover, the Project is designed to receive up to an
additional 400,000 dekatherms of natural gas assets per day to Rover.
Rover does not have the authority to construct facilities pursuant to
blanket certificate authority under Part 157, Subpart F of the
Commission's regulations, therefore, Rover was required to file an
application under part 157 of the Commission's regulations.
[[Page 637]]
Background
On December 11, 2024, the Commission issued a Notice of Scoping
Period Requesting Comments on Environmental Issues for the Proposed
Rover--Bulger Delivery Meter Station Project (Notice of Scoping). The
Notice of Scoping was sent to affected landowners; Federal, State, and
local government agencies; elected officials; environmental and public
interest groups; Native American Tribes; other interested parties; and
local libraries and newspapers. All substantive comments will be
addressed in the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of formal issuances and submittals in specific dockets, the
Commission offers a free service called eSubscription. This service
provides automatic notification of filings made to subscribed dockets,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP24-88-000), and follow the instructions. For assistance with access
to eLibrary, the helpline can be reached at (866) 208-3676, TTY (202)
502-8659, or at [email protected]. The eLibrary link on the
FERC website also provides access to the texts of formal documents
issued by the Commission, such as orders, notices, and rulemakings.
Dated: December 30, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-31649 Filed 1-3-25; 8:45 am]
BILLING CODE 6717-01-P