Public Hearing, 381-382 [2024-31584]

Download as PDF Federal Register / Vol. 90, No. 2 / Friday, January 3, 2025 / Notices [FR Doc. 2024–31509 Filed 1–2–25; 8:45 am] BILLING CODE 4710–20–P SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing Susquehanna River Basin Commission. ACTION: Notice. AGENCY: The Susquehanna River Basin Commission will hold a public hearing on January 30, 2025. The Commission will hold this hearing in person and telephonically. At this public hearing, the Commission will hear testimony on the projects listed in the Supplementary Information section of this notice. The Commission will also hear testimony on a proposed general permit, GP–04 relating to Into Basin Diversions of Water and a proposed Dry Cooling Resolution to update the 2015 Dry Cooling Resolution previously adopted by the Commission. Such projects and actions are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for March 13, 2025, which will be noticed separately. The public should note that this public hearing will be the only opportunity to offer oral comments to the Commission for the listed projects and actions. The deadline for the submission of written comments is February 10, 2025. DATES: The public hearing will convene on January 30, 2025, at 6 p.m. The public hearing will end at 9 p.m. or at the conclusion of public testimony, whichever is earlier. The deadline for submitting written comments is Monday, February 10, 2025. ADDRESSES: This public hearing will be conducted in person and telephonically. You may attend in person at Susquehanna River Basin Commission, 4423 N Front St., Harrisburg, Pennsylvania, or join by telephone at Toll-Free Number 1–877–304–9269 and then enter the guest passcode 2619070 followed by #. FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and Secretary to the Commission, telephone: (717) 238–0423 or joyler@srbc.gov. Information concerning the project applications is available at the Commission’s Water Application and Approval Viewer at https:// www.srbc.gov/waav. The Proposed General Permit and the Proposed Dry Cooling Resolution are available on the Commission’s website at https:// www.srbc.gov/regulatory/public- lotter on DSK11XQN23PROD with NOTICES1 SUMMARY: VerDate Sep<11>2014 18:01 Jan 02, 2025 Jkt 265001 participation/. Additional supporting documents are available to inspect and copy in accordance with the Commission’s Access to Records Policy at www.srbc.gov/regulatory/policiesguidance/docs/access-to-records-policy2009-02.pdf. SUPPLEMENTARY INFORMATION: In addition to the Proposed General Permit, GP–04 relating to the Into Basin Diversion of Water and the Proposed Dry Cooling Resolution, the public hearing will cover the following projects: Projects Scheduled for Action 1. Project Sponsor and Facility: Beavertown Municipal Authority, Beaver Township, Snyder County, Pa. Applications for renewal of groundwater withdrawals (30-day averages) of up to 0.199 mgd from Well 6 and 0.199 mgd from Well 7 (Docket No. 19930901). 2. Project Sponsor and Facility: Bedford Township Municipal Authority, Bedford County, Pa. Applications for renewal of groundwater withdrawals (30-day averages) of up to 0.324 mgd from Bowman Well 1 and 0.100 mgd from Bowman Well 2 (Docket No. 19990502). Service area is located in an Environmental Justice area. 3. Project Sponsor: BlueTriton Brands, Inc. Project Facility: Pine Grove Spring, Pine Grove Township, Schuylkill County, Pa. Applications for renewal of groundwater withdrawal of up to 0.288 mgd (30-day average) from Borehole PB–1, consumptive use of up to 0.288 mgd (30-day average), and an out-ofbasin diversion of up to 0.288 mgd (30day average) (Docket No. 20000202). 4. Project Sponsor: Borough of Ephrata. Project Facility: Ephrata Area Joint Authority, Ephrata Borough, Lancaster County, Pa. Application for renewal of groundwater withdrawal of up to 0.260 mgd (30-day average) from Well 2 (Docket No. 19940706). Service area is located in an Environmental Justice area. 5. Project Sponsor and Facility: College Township Water Authority, College Township, Centre County, Pa. Application for groundwater withdrawal of up to 1.405 mgd (30-day average) from Well OH–20. 6. Project Sponsor and Facility: Diversified Production LLC (Wilson Creek), Duncan Township, Tioga County, Pa. Application for renewal of surface water withdrawal of up to 0.720 mgd (peak day) (Docket No. 20200302). 7. Project Sponsor and Facility: DS Services of America, Inc., West Earl Township, Lancaster County, Pa. Application for renewal of consumptive PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 381 use of up to 0.242 mgd (30-day average) (Docket No. 20000203). Located adjacent to an Environmental Justice area. 8. Project Sponsor and Facility: EQT ARO LLC (Lycoming Creek), Lewis Township, Lycoming County, Pa. Application for renewal of surface water withdrawal of up to 1.340 mgd (peak day) (Docket No. 20200301). 9. Project Sponsor: First Investors General, Inc. Project Facility: Cool Creek Golf Club, Hellam Township, York County, Pa. Application for renewal with modification for consumptive use of up to 0.190 mgd (30-day average) (Docket No. 20000602). 10. Project Sponsor and Facility: Fredericksburg Sewer and Water Authority, Bethel Township, Lebanon County, Pa. Applications for groundwater withdrawals (30-day averages) of up to 0.158 mgd from Well 7 and 0.144 mgd from Well 8. 11. Project Sponsor: H&K Group, Inc. Project Facility: Penn/MD Materials Quarry, Fulton Township, Lancaster County, Pa. Applications for consumptive use of up to 0.024 mgd (peak day) and groundwater withdrawals (30-day averages) of up to 1.980 mgd from the Pit Sump, 0.004 mgd from the Primary and Secondary Well, and 0.011 mgd from the Tertiary Well. 12. Project Sponsor: HP Hood LLC. Project Facility: Arkport NY Plant, Hornellsville Town, Steuben County, N.Y. Application for groundwater withdrawal of up to 0.600 mgd (30-day average) from Well 2. 13. Project Sponsor and Facility: Huntsinger Farms, Inc. (Deep Creek 3), Hegins Township, Schuylkill County, Pa. Application for surface water withdrawal of up to 0.504 mgd (peak day). 14. Project Sponsor and Facility: JKLM Energy, LLC (Tioga River), Tioga Township, Tioga County, Pa. Application for surface water withdrawal of up to 3.000 mgd (peak day). 15. Project Sponsor: McStern, L.L.C. Project Facility: Deer Valley Golf Course, South Hanover Township, Dauphin County, Pa. Application for renewal with modification for consumptive use of up to 0.217 mgd (30-day average) (Docket No. 20020618). 16. Project Sponsor and Facility: Meadia Heights Golf Club LLC (Conestoga River), West Lampeter Township, Lancaster County, Pa. Applications for renewal of surface water withdrawal of up to 0.249 mgd (peak day) and consumptive use of up to 0.249 mgd (30-day average) (Docket E:\FR\FM\03JAN1.SGM 03JAN1 lotter on DSK11XQN23PROD with NOTICES1 382 Federal Register / Vol. 90, No. 2 / Friday, January 3, 2025 / Notices No. 20200910). Located in an Environmental Justice area. 17. Project Sponsor: Michael Foods, Inc. Project Facility: Papetti’s Hygrade Egg Products, Inc., d.b.a. Michael Foods Egg Products Company, Upper Mahantango Township, Schuylkill County, Pa. Applications for renewal of consumptive use of up to 0.225 mgd (peak day) and groundwater withdrawals (30-day averages) of up to 0.186 mgd from Well 1, 0.079 mgd from Well 2, and 0.350 mgd from Well 3 (Docket No. 19990903). 18. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Sugar Creek), Troy Township, Bradford County, Pa. Application for surface water withdrawal of up to 0.750 mgd (peak day). 19. Project Sponsor: Susquehanna Nuclear, LLC. Project Facility: Susquehanna Steam Electric Station, Salem Township, Luzerne County, Pa. Applications for renewal of surface water withdrawal of up to 76.000 mgd (peak day) from the Susquehanna River, consumptive use of up to 53.000 mgd (peak day), and groundwater withdrawal of up to 0.125 (30-day average) from Well TW–2 (Docket No. 19950301). 20. Project Sponsor and Facility: SWN Production Company, LLC (Susquehanna River), Oakland Township, Susquehanna County, Pa. Application for renewal of surface water withdrawal of up to 3.000 mgd (peak day) (Docket No. 20200305). 21. Project Sponsor and Facility: SWN Production Company, LLC (Tunkhannock Creek), Lenox Township, Susquehanna County, Pa. Application for renewal of surface water withdrawal of up to 1.218 mgd (peak day) (Docket No. 20200306). 22. Project Sponsor: Valley CC LLC. Project Facility: Valley Country Club, Sugarloaf Township, Luzerne County, Pa. Applications for renewal of groundwater withdrawals (30-day averages) of up to 0.090 mgd from the Shop Well and 0.090 mgd from the Pumphouse Well (Docket No. 20090632). 23. Project Sponsor: Weaverland Valley Authority. Project Facility: Terre Hill Water System, East Earl Township, Lancaster County, Pa. Application for renewal of groundwater withdrawal of up to 0.098 mgd (30-day average) from Well 6 (Docket No. 19880405). 24. Project Sponsor and Facility: Westfield Borough, Tioga County, Pa. Application for groundwater withdrawal of up to 0.412 mgd (30-day average) from the Harvey Well. VerDate Sep<11>2014 18:01 Jan 02, 2025 Jkt 265001 Opportunity To Appear and Comment Interested parties may appear or call into the hearing to offer comments to the Commission on any business listed above required to be the subject of a public hearing. Given the nature of the meeting, the Commission strongly encourages those members of the public wishing to provide oral comments to pre-register with the Commission by emailing Jason Oyler at joyler@srbc.gov before the hearing date. The presiding officer reserves the right to limit oral statements in the interest of time and to control the course of the hearing otherwise. Access to the hearing via telephone will begin at 5:45 p.m. Guidelines for the public hearing are posted on the Commission’s website, www.srbc.gov, before the hearing for review. The presiding officer reserves the right to modify or supplement such guidelines at the hearing. Written comments on any business listed above required to be the subject of a public hearing may also be mailed to Mr. Jason Oyler, Secretary to the Commission, Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, Pa. 17110–1788, or submitted electronically through https://www.srbc.gov/meetingcomment/default.aspx?type=2&cat=7. Comments mailed or electronically submitted must be received by the Commission on or before Monday, February 10, 2025, to be considered. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: December 30, 2024. Jason E. Oyler, General Counsel and Secretary to the Commission. [FR Doc. 2024–31584 Filed 1–2–25; 8:45 am] BILLING CODE 7040–01–P DEPARTMENT OF TRANSPORTATION Federal Motor Carrier Safety Administration [Docket No. FMCSA–2024–0313] Agency Information Collection Activities; Revision of an Approved Information Collection: National Consumer Complaint Database Federal Motor Carrier Safety Administration (FMCSA), Department of Transportation (DOT). ACTION: Notice and request for comments. AGENCY: In accordance with the Paperwork Reduction Act of 1995, FMCSA announces its plan to submit the Information Collection Request (ICR) SUMMARY: PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 described below to the Office of Management and Budget (OMB) for its review and approval and invites public comment. This revision is for the National Consumer Complaint Database (NCCDB), which is an online interface allowing consumers, drivers, and others to file complaints against unsafe and unscrupulous companies and/or their employees, including shippers, receivers, and transportation intermediaries, depending on the type of complaint. These complaints cover a wide range of issues, including but not limited to driver harassment, coercion, movement of household goods, financial responsibility instruments for brokers and freight forwarders, Americans with Disability Act (ADA) compliance, Electronic Logging Device (ELD), EntryLevel Driver Training (ELDT), Medical Review Officer (MRO), and Substance Abuse Professional (SAP) complaints. FMCSA requests approval to revise the ICR titled ‘‘National Consumer Complaint Database.’’ Comments on this notice must be received on or before March 4, 2025. DATES: You may submit comments identified by Docket Number FMCSA– 2024–0313 using any of the following methods: • Federal eRulemaking Portal: https://www.regulations.gov. Follow the online instructions for submitting comments. • Mail: Dockets Operations; U.S. Department of Transportation, 1200 New Jersey Avenue SE, West Building, Ground Floor, Washington, DC 20590– 0001. • Hand Delivery or Courier: Dockets Operations, U.S. Department of Transportation, 1200 New Jersey Avenue SE, West Building, Ground Floor, Washington, DC 20590–0001 between 9 a.m. and 5 p.m. ET, Monday through Friday, except Federal holidays. To be sure someone is there to help you, please call (202) 366–9317 or (202) 366– 9826 before visiting Dockets Operations. • Fax: (202) 493–2251. To avoid duplication, please use only one of these four methods. See the ‘‘Public Participation and Request for Comments’’ portion of the SUPPLEMENTARY INFORMATION section for instructions on submitting comments. ADDRESSES: Ms. Donnice Wagoner, Commercial Enforcement Division/MC–SEI, DOT, FMCSA, West Building 6th Floor, 1200 New Jersey Avenue SE, Washington, DC 20590–0001; (202) 366–8045; Donnice.Wagoner@dot.gov. FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: E:\FR\FM\03JAN1.SGM 03JAN1

Agencies

[Federal Register Volume 90, Number 2 (Friday, January 3, 2025)]
[Notices]
[Pages 381-382]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-31584]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Public Hearing

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Susquehanna River Basin Commission will hold a public 
hearing on January 30, 2025. The Commission will hold this hearing in 
person and telephonically. At this public hearing, the Commission will 
hear testimony on the projects listed in the Supplementary Information 
section of this notice. The Commission will also hear testimony on a 
proposed general permit, GP-04 relating to Into Basin Diversions of 
Water and a proposed Dry Cooling Resolution to update the 2015 Dry 
Cooling Resolution previously adopted by the Commission. Such projects 
and actions are intended to be scheduled for Commission action at its 
next business meeting, tentatively scheduled for March 13, 2025, which 
will be noticed separately. The public should note that this public 
hearing will be the only opportunity to offer oral comments to the 
Commission for the listed projects and actions. The deadline for the 
submission of written comments is February 10, 2025.

DATES: The public hearing will convene on January 30, 2025, at 6 p.m. 
The public hearing will end at 9 p.m. or at the conclusion of public 
testimony, whichever is earlier. The deadline for submitting written 
comments is Monday, February 10, 2025.

ADDRESSES: This public hearing will be conducted in person and 
telephonically. You may attend in person at Susquehanna River Basin 
Commission, 4423 N Front St., Harrisburg, Pennsylvania, or join by 
telephone at Toll-Free Number 1-877-304-9269 and then enter the guest 
passcode 2619070 followed by #.

FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and 
Secretary to the Commission, telephone: (717) 238-0423 or 
[email protected].
    Information concerning the project applications is available at the 
Commission's Water Application and Approval Viewer at https://www.srbc.gov/waav. The Proposed General Permit and the Proposed Dry 
Cooling Resolution are available on the Commission's website at https://www.srbc.gov/regulatory/public-participation/. Additional supporting 
documents are available to inspect and copy in accordance with the 
Commission's Access to Records Policy at www.srbc.gov/regulatory/policies-guidance/docs/access-to-records-policy-2009-02.pdf.

SUPPLEMENTARY INFORMATION: In addition to the Proposed General Permit, 
GP-04 relating to the Into Basin Diversion of Water and the Proposed 
Dry Cooling Resolution, the public hearing will cover the following 
projects:

Projects Scheduled for Action

    1. Project Sponsor and Facility: Beavertown Municipal Authority, 
Beaver Township, Snyder County, Pa. Applications for renewal of 
groundwater withdrawals (30-day averages) of up to 0.199 mgd from Well 
6 and 0.199 mgd from Well 7 (Docket No. 19930901).
    2. Project Sponsor and Facility: Bedford Township Municipal 
Authority, Bedford County, Pa. Applications for renewal of groundwater 
withdrawals (30-day averages) of up to 0.324 mgd from Bowman Well 1 and 
0.100 mgd from Bowman Well 2 (Docket No. 19990502). Service area is 
located in an Environmental Justice area.
    3. Project Sponsor: BlueTriton Brands, Inc. Project Facility: Pine 
Grove Spring, Pine Grove Township, Schuylkill County, Pa. Applications 
for renewal of groundwater withdrawal of up to 0.288 mgd (30-day 
average) from Borehole PB-1, consumptive use of up to 0.288 mgd (30-day 
average), and an out-of-basin diversion of up to 0.288 mgd (30-day 
average) (Docket No. 20000202).
    4. Project Sponsor: Borough of Ephrata. Project Facility: Ephrata 
Area Joint Authority, Ephrata Borough, Lancaster County, Pa. 
Application for renewal of groundwater withdrawal of up to 0.260 mgd 
(30-day average) from Well 2 (Docket No. 19940706). Service area is 
located in an Environmental Justice area.
    5. Project Sponsor and Facility: College Township Water Authority, 
College Township, Centre County, Pa. Application for groundwater 
withdrawal of up to 1.405 mgd (30-day average) from Well OH-20.
    6. Project Sponsor and Facility: Diversified Production LLC (Wilson 
Creek), Duncan Township, Tioga County, Pa. Application for renewal of 
surface water withdrawal of up to 0.720 mgd (peak day) (Docket No. 
20200302).
    7. Project Sponsor and Facility: DS Services of America, Inc., West 
Earl Township, Lancaster County, Pa. Application for renewal of 
consumptive use of up to 0.242 mgd (30-day average) (Docket No. 
20000203). Located adjacent to an Environmental Justice area.
    8. Project Sponsor and Facility: EQT ARO LLC (Lycoming Creek), 
Lewis Township, Lycoming County, Pa. Application for renewal of surface 
water withdrawal of up to 1.340 mgd (peak day) (Docket No. 20200301).
    9. Project Sponsor: First Investors General, Inc. Project Facility: 
Cool Creek Golf Club, Hellam Township, York County, Pa. Application for 
renewal with modification for consumptive use of up to 0.190 mgd (30-
day average) (Docket No. 20000602).
    10. Project Sponsor and Facility: Fredericksburg Sewer and Water 
Authority, Bethel Township, Lebanon County, Pa. Applications for 
groundwater withdrawals (30-day averages) of up to 0.158 mgd from Well 
7 and 0.144 mgd from Well 8.
    11. Project Sponsor: H&K Group, Inc. Project Facility: Penn/MD 
Materials Quarry, Fulton Township, Lancaster County, Pa. Applications 
for consumptive use of up to 0.024 mgd (peak day) and groundwater 
withdrawals (30-day averages) of up to 1.980 mgd from the Pit Sump, 
0.004 mgd from the Primary and Secondary Well, and 0.011 mgd from the 
Tertiary Well.
    12. Project Sponsor: HP Hood LLC. Project Facility: Arkport NY 
Plant, Hornellsville Town, Steuben County, N.Y. Application for 
groundwater withdrawal of up to 0.600 mgd (30-day average) from Well 2.
    13. Project Sponsor and Facility: Huntsinger Farms, Inc. (Deep 
Creek 3), Hegins Township, Schuylkill County, Pa. Application for 
surface water withdrawal of up to 0.504 mgd (peak day).
    14. Project Sponsor and Facility: JKLM Energy, LLC (Tioga River), 
Tioga Township, Tioga County, Pa. Application for surface water 
withdrawal of up to 3.000 mgd (peak day).
    15. Project Sponsor: McStern, L.L.C. Project Facility: Deer Valley 
Golf Course, South Hanover Township, Dauphin County, Pa. Application 
for renewal with modification for consumptive use of up to 0.217 mgd 
(30-day average) (Docket No. 20020618).
    16. Project Sponsor and Facility: Meadia Heights Golf Club LLC 
(Conestoga River), West Lampeter Township, Lancaster County, Pa. 
Applications for renewal of surface water withdrawal of up to 0.249 mgd 
(peak day) and consumptive use of up to 0.249 mgd (30-day average) 
(Docket

[[Page 382]]

No. 20200910). Located in an Environmental Justice area.
    17. Project Sponsor: Michael Foods, Inc. Project Facility: 
Papetti's Hygrade Egg Products, Inc., d.b.a. Michael Foods Egg Products 
Company, Upper Mahantango Township, Schuylkill County, Pa. Applications 
for renewal of consumptive use of up to 0.225 mgd (peak day) and 
groundwater withdrawals (30-day averages) of up to 0.186 mgd from Well 
1, 0.079 mgd from Well 2, and 0.350 mgd from Well 3 (Docket No. 
19990903).
    18. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Sugar 
Creek), Troy Township, Bradford County, Pa. Application for surface 
water withdrawal of up to 0.750 mgd (peak day).
    19. Project Sponsor: Susquehanna Nuclear, LLC. Project Facility: 
Susquehanna Steam Electric Station, Salem Township, Luzerne County, Pa. 
Applications for renewal of surface water withdrawal of up to 76.000 
mgd (peak day) from the Susquehanna River, consumptive use of up to 
53.000 mgd (peak day), and groundwater withdrawal of up to 0.125 (30-
day average) from Well TW-2 (Docket No. 19950301).
    20. Project Sponsor and Facility: SWN Production Company, LLC 
(Susquehanna River), Oakland Township, Susquehanna County, Pa. 
Application for renewal of surface water withdrawal of up to 3.000 mgd 
(peak day) (Docket No. 20200305).
    21. Project Sponsor and Facility: SWN Production Company, LLC 
(Tunkhannock Creek), Lenox Township, Susquehanna County, Pa. 
Application for renewal of surface water withdrawal of up to 1.218 mgd 
(peak day) (Docket No. 20200306).
    22. Project Sponsor: Valley CC LLC. Project Facility: Valley 
Country Club, Sugarloaf Township, Luzerne County, Pa. Applications for 
renewal of groundwater withdrawals (30-day averages) of up to 0.090 mgd 
from the Shop Well and 0.090 mgd from the Pumphouse Well (Docket No. 
20090632).
    23. Project Sponsor: Weaverland Valley Authority. Project Facility: 
Terre Hill Water System, East Earl Township, Lancaster County, Pa. 
Application for renewal of groundwater withdrawal of up to 0.098 mgd 
(30-day average) from Well 6 (Docket No. 19880405).
    24. Project Sponsor and Facility: Westfield Borough, Tioga County, 
Pa. Application for groundwater withdrawal of up to 0.412 mgd (30-day 
average) from the Harvey Well.

Opportunity To Appear and Comment

    Interested parties may appear or call into the hearing to offer 
comments to the Commission on any business listed above required to be 
the subject of a public hearing. Given the nature of the meeting, the 
Commission strongly encourages those members of the public wishing to 
provide oral comments to pre-register with the Commission by emailing 
Jason Oyler at [email protected] before the hearing date. The presiding 
officer reserves the right to limit oral statements in the interest of 
time and to control the course of the hearing otherwise. Access to the 
hearing via telephone will begin at 5:45 p.m. Guidelines for the public 
hearing are posted on the Commission's website, www.srbc.gov, before 
the hearing for review. The presiding officer reserves the right to 
modify or supplement such guidelines at the hearing. Written comments 
on any business listed above required to be the subject of a public 
hearing may also be mailed to Mr. Jason Oyler, Secretary to the 
Commission, Susquehanna River Basin Commission, 4423 North Front 
Street, Harrisburg, Pa. 17110-1788, or submitted electronically through 
https://www.srbc.gov/meeting-comment/default.aspx?type=2&cat=7. 
Comments mailed or electronically submitted must be received by the 
Commission on or before Monday, February 10, 2025, to be considered.
    Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 806, 
807, and 808.

    Dated: December 30, 2024.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2024-31584 Filed 1-2-25; 8:45 am]
BILLING CODE 7040-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.