Notice of Effectiveness of Withdrawal of Long-Term Flow Variance (Article 33); Pacific Gas and Electric Company, 107135 [2024-31435]
Download as PDF
Federal Register / Vol. 89, No. 250 / Tuesday, December 31, 2024 / Notices
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP25–31–
000.
To file via USPS: Debbie-Anne A.
Reese, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
To file via any other method: DebbieAnne A. Reese, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail at: David A. Alonzo, Manager of
Project Authorizations, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 1300, Houston, Texas
77002 or by email (with a link to the
document) at david_alonzo@
tcenergy.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online.
khammond on DSK9W7S144PROD with NOTICES
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: December 23, 2024.
Debbie-Anne A. Reese,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1121–140]
Notice of Effectiveness of Withdrawal
of Long-Term Flow Variance (Article
33); Pacific Gas and Electric Company
On June 8, 2023, Pacific Gas and
Electric Company (licensee), filed a
long-term variance request to remove
the current compliance requirement for
the ramping rate from license Article
33(d) for the Battle Creek Hydroelectric
Project No. 1121. Because the
Commission determined that the
licensee’s request would require an
amendment to Article 33(d) of the
project license, the Commission issued
a public notice for the licensee’s request
on June 30, 2023. On August 9, 2023,
Commission staff requested additional
information from the licensee to address
comments received from the California
State Water Resources Control Board
during the public notice period. Finally,
on November 14, 2024, the licensee
filed a request to withdraw its long-term
variance request regarding the license
Article 33(d) ramping rate for North
Battle Creek Dam.
No motion in opposition to the
request for withdrawal has been filed,
and the Commission has taken no action
to disallow the withdrawal. Pursuant to
Rule 216(b) of the Commission’s Rules
of Practice and Procedure,1 the
withdrawal of the application became
effective on November 29, 2024, and
this proceeding is hereby terminated.
Dated: December 23, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–31435 Filed 12–30–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP25–29–000]
Notice of Application and Establishing
Intervention Deadline; Eastern Gas
Transmission and Storage, Inc.
Take notice that on December 11,
2024, Eastern Gas Transmission and
Storage, Inc. (EGTS), 10700 Energy Way,
Glen Allen, VA, 23060, filed an
application under section 7(c), of the
Natural Gas Act (NGA), and Part 157 of
the Commission’s regulations requesting
authorization for its Capital Area Project
(Project). The Project involves the
installation of a 6,130-horsepower gasfired turbine compressor at the Centre
Compressor Station in Centre County,
Pennsylvania; an 11,110-horsepower
gas-fired turbine compressor at the
Chambersburg Compressor Station in
Franklin County, Pennsylvania; and a
5,000-horsepower electric-driven
compressor at the Leesburg Compressor
Station in Loudoun County, Virginia.
Additionally, the Finnefrock
Compressor Station in Clinton County,
Pennsylvania, will undergo upgrades,
including the replacement of gas
coolers, headers, and cold recycle
piping, as well as the installation of new
check valves. The project will provide
an additional 67,500 dekatherms per
day of firm transportation service to
Washington Gas Light Company at an
estimated total cost of $171 million,
with proposed incremental rates to
recover project costs all as more fully set
forth in the application which is on file
with the Commission and open for
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
Any questions regarding the proposed
project should be directed to Kenan
Carioti, Regulatory Specialist, Eastern
Gas Transmission and Storage, Inc.,
10700 Energy Way, Glen Allen, VA
23060, by email at Kenan.Carioti@
bhegts.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
[FR Doc. 2024–31437 Filed 12–30–24; 8:45 am]
1 18
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:31 Dec 30, 2024
Jkt 265001
PO 00000
CFR 385.216(b) (2024).
Frm 00032
Fmt 4703
Sfmt 4703
107135
1 18
E:\FR\FM\31DEN1.SGM
CFR 157.9.
31DEN1
Agencies
[Federal Register Volume 89, Number 250 (Tuesday, December 31, 2024)]
[Notices]
[Page 107135]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-31435]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1121-140]
Notice of Effectiveness of Withdrawal of Long-Term Flow Variance
(Article 33); Pacific Gas and Electric Company
On June 8, 2023, Pacific Gas and Electric Company (licensee), filed
a long-term variance request to remove the current compliance
requirement for the ramping rate from license Article 33(d) for the
Battle Creek Hydroelectric Project No. 1121. Because the Commission
determined that the licensee's request would require an amendment to
Article 33(d) of the project license, the Commission issued a public
notice for the licensee's request on June 30, 2023. On August 9, 2023,
Commission staff requested additional information from the licensee to
address comments received from the California State Water Resources
Control Board during the public notice period. Finally, on November 14,
2024, the licensee filed a request to withdraw its long-term variance
request regarding the license Article 33(d) ramping rate for North
Battle Creek Dam.
No motion in opposition to the request for withdrawal has been
filed, and the Commission has taken no action to disallow the
withdrawal. Pursuant to Rule 216(b) of the Commission's Rules of
Practice and Procedure,\1\ the withdrawal of the application became
effective on November 29, 2024, and this proceeding is hereby
terminated.
---------------------------------------------------------------------------
\1\ 18 CFR 385.216(b) (2024).
Dated: December 23, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-31435 Filed 12-30-24; 8:45 am]
BILLING CODE 6717-01-P