Revisions to the Filing Process for Commission Forms; Notice of eForms Updates, 104142 [2024-30474]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
104142
Federal Register / Vol. 89, No. 245 / Friday, December 20, 2024 / Notices
Description: § 205(d) Rate Filing: 4346
WAPA/Black Hills Electric/Rushmore
Electric Inter Agr to be effective 12/16/
2024.
Filed Date: 12/16/24.
Accession Number: 20241216–5220.
Comment Date: 5 p.m. ET 1/6/25.
Docket Numbers: ER25–723–000.
Applicants: Basin Electric Power
Cooperative.
Description: § 205(d) Rate Filing:
Basin Electric Submission of Revisions
to Attachment K Trans. Planning
Process to be effective 12/17/2024.
Filed Date: 12/16/24.
Accession Number: 20241216–5232.
Comment Date: 5 p.m. ET 1/6/25.
Docket Numbers: ER25–724–000.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing: 2024–
12–16 Att R Revisions to be effective 12/
17/2024.
Filed Date: 12/16/24.
Accession Number: 20241216–5251.
Comment Date: 5 p.m. ET 1/6/25.
Docket Numbers: ER25–725–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2024–12–16 Amendment to the COI–
POA & Request for Waiver to be
effective 1/1/2025.
Filed Date: 12/16/24.
Accession Number: 20241216–5257.
Comment Date: 5 p.m. ET 1/6/25.
Docket Numbers: ER25–726–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Compliance filing:
Compliance Filing in Response to
October 17, 2024 Order on Remand to
be effective 12/17/2024.
Filed Date: 12/16/24.
Accession Number: 20241216–5261.
Comment Date: 5 p.m. ET 1/6/25.
Docket Numbers: ER25–727–000.
Applicants: Cascade Energy Storage,
LLC, Bracewell LLP.
Description: § 205(d) Rate Filing:
Cascade Energy Storage, LLC submits
tariff filing per 35.13(a)(2)(iii: Shared
Facilities Agreement to be effective 12/
17/2024.
Filed Date: 12/16/24.
Accession Number: 20241216–5262.
Comment Date: 5 p.m. ET 1/6/25.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
VerDate Sep<11>2014
20:12 Dec 19, 2024
Jkt 265001
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 16, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–30469 Filed 12–19–24; 8:45 am]
BILLING CODE 6717–01–P
01 will be effective starting with the first
quarter 2025.
The draft updated (Version 2025–01–
01) taxonomies, validation rules, and
rendering files are currently available
for download in the eForms portal
(https://ecollection.ferc.gov) and are
available for testing in the eForms
portal. Suggestions on the draft Version
2025–01–01 taxonomies can be
provided by March 3, 2025, through
https://XBRLview.ferc.gov. Version
2025–01–01 includes the incorporation
of Order No. 898,3 technical edits to the
codesets required for updating to Xule
v1.2, Arelle v2.35.18, and the adoption
of the XBRL Inline Renderer (XENDR)
(https://xbrl.us/xule/xendr/) to render
the human readable HTML documents.
The following FERC Form filings due
after March 28, 2025, must be filed
using the Version 2025–04–01
taxonomies, validation rules, and
rendering files: (1) the 2024 FERC Form
Nos. 60 and 714 4 and; (2) the 2025
FERC Form Nos. 1, 1–F, 2, 2–A, 3–Q
electric, 3–Q natural gas, and 6. Please
see the Taxonomy History page (https://
ecollection.ferc.gov/taxonomyHistory)
for detailed version information
organized by form.
Dated: December 16, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–30474 Filed 12–19–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. RM19–12–000]
[Project No. 1988–104]
Revisions to the Filing Process for
Commission Forms; Notice of eForms
Updates
Notice is hereby given that, on March
28, 2025, the eXtensible Business
Reporting Language (XBRL) taxonomies,
validation rules, and rendering files
needed to file the FERC Form Nos. 1, 1–
F, 2, 2–A, 3–Q electric, 3–Q natural gas,
6, 60, and 714,1 will be updated to
Version 2025–04–01.2 Version 2025–04–
1 The Commission adopted the XBRL process for
filing these forms in Order No. 859. Revisions to the
Filing Process for Comm’n Forms, Order No. 859,
167 FERC ¶ 61,241 (2019).
2 The Commission adopted the final XBRL
taxonomies, protocols, implementation guide, and
other supporting documents, and established the
implementation schedule for filing the Commission
Forms following a technical conference in this
proceeding. Revisions to the Filing Process for
Comm’n Forms, 172 FERC ¶ 61,059 (2020). The
Commission also stated that technical updates, such
as the updates referenced here, will not take effect
until at least 60 days after issuance of a notice from
the Office of the Secretary. Id. P 26.
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
Pacific Gas & Electric Company;
Notice of Application for a Variance
Under Article 402 Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Application for
Temporary Variance of Minimum Flow
Releases into Dinkey Creek.
b. Project No: 1988–104.
c. Date Filed: November 8, 2024.
d. Applicant: Pacific Gas & Electric
Company.
e. Name of Project: Haas-Kings River
Hydroelectric Project.
3 Acct. & Reporting Treatment of Certain
Renewable Energy Assets, Order No. 898, 183 FERC
¶ 61,205 (2023).
4 The changes to FERC Form Nos. 60 and 714
consist of only the technical updates to the
codesets.
E:\FR\FM\20DEN1.SGM
20DEN1
Agencies
[Federal Register Volume 89, Number 245 (Friday, December 20, 2024)]
[Notices]
[Page 104142]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-30474]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RM19-12-000]
Revisions to the Filing Process for Commission Forms; Notice of
eForms Updates
Notice is hereby given that, on March 28, 2025, the eXtensible
Business Reporting Language (XBRL) taxonomies, validation rules, and
rendering files needed to file the FERC Form Nos. 1, 1-F, 2, 2-A, 3-Q
electric, 3-Q natural gas, 6, 60, and 714,\1\ will be updated to
Version 2025-04-01.\2\ Version 2025-04-01 will be effective starting
with the first quarter 2025.
---------------------------------------------------------------------------
\1\ The Commission adopted the XBRL process for filing these
forms in Order No. 859. Revisions to the Filing Process for Comm'n
Forms, Order No. 859, 167 FERC ] 61,241 (2019).
\2\ The Commission adopted the final XBRL taxonomies, protocols,
implementation guide, and other supporting documents, and
established the implementation schedule for filing the Commission
Forms following a technical conference in this proceeding. Revisions
to the Filing Process for Comm'n Forms, 172 FERC ] 61,059 (2020).
The Commission also stated that technical updates, such as the
updates referenced here, will not take effect until at least 60 days
after issuance of a notice from the Office of the Secretary. Id. P
26.
---------------------------------------------------------------------------
The draft updated (Version 2025-01-01) taxonomies, validation
rules, and rendering files are currently available for download in the
eForms portal (https://ecollection.ferc.gov) and are available for
testing in the eForms portal. Suggestions on the draft Version 2025-01-
01 taxonomies can be provided by March 3, 2025, through https://XBRLview.ferc.gov. Version 2025-01-01 includes the incorporation of
Order No. 898,\3\ technical edits to the codesets required for updating
to Xule v1.2, Arelle v2.35.18, and the adoption of the XBRL Inline
Renderer (XENDR) (https://xbrl.us/xule/xendr/) to render the human
readable HTML documents.
---------------------------------------------------------------------------
\3\ Acct. & Reporting Treatment of Certain Renewable Energy
Assets, Order No. 898, 183 FERC ] 61,205 (2023).
---------------------------------------------------------------------------
The following FERC Form filings due after March 28, 2025, must be
filed using the Version 2025-04-01 taxonomies, validation rules, and
rendering files: (1) the 2024 FERC Form Nos. 60 and 714 \4\ and; (2)
the 2025 FERC Form Nos. 1, 1-F, 2, 2-A, 3-Q electric, 3-Q natural gas,
and 6. Please see the Taxonomy History page (https://ecollection.ferc.gov/taxonomyHistory) for detailed version information
organized by form.
---------------------------------------------------------------------------
\4\ The changes to FERC Form Nos. 60 and 714 consist of only the
technical updates to the codesets.
Dated: December 16, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-30474 Filed 12-19-24; 8:45 am]
BILLING CODE 6717-01-P