Application for Renewal of Authorization To Export Electric Energy; Calpine Energy Solutions, LLC, 103806-103807 [2024-30221]
Download as PDF
103806
Federal Register / Vol. 89, No. 244 / Thursday, December 19, 2024 / Notices
Public Participation: The in-person/
online virtual hybrid meeting is open to
the public in person or virtually, via
WebEx. Written statements may be filed
with the Board no later than 5 p.m. MST
on Friday, January 24, 2025, or within
seven days after the meeting by sending
them to the NNMCAB Executive
Director at the aforementioned email
address. Written public comments
received prior to the meeting will be
read into the record. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to submit public comments
should follow as directed above.
Minutes: Minutes will be available by
emailing or calling Bridget Maestas,
NNMCAB Executive Director, at
bridget.maestas@em.doe.gov or at (505)
709–7466.
Signing Authority: This document of
the Department of Energy was signed on
December 13, 2024, by Alyssa Petit,
Deputy Committee Management Officer,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC on December
13, 2024.
Jennifer Hartzell,
Alternate Federal Register Liaison Officer,
U.S. Department of Energy.
[FR Doc. 2024–30062 Filed 12–18–24; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[GDO Docket No. EA–284–G]
Application for Renewal of
Authorization To Export Electric
Energy; Calpine Energy Solutions, LLC
Grid Deployment Office,
Department of Energy.
ACTION: Notice of application.
lotter on DSK11XQN23PROD with NOTICES1
AGENCY:
Calpine Energy Solutions,
LLC (the Applicant or Calpine
Solutions) has applied for the renewal
of authorization to transmit electric
energy from the United States to Mexico
pursuant to the Federal Power Act.
SUMMARY:
VerDate Sep<11>2014
18:08 Dec 18, 2024
Jkt 265001
Comments, protests, or motions
to intervene must be submitted on or
before January 21, 2025.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
by electronic mail to
Electricity.Exports@hq.doe.gov.
FOR FURTHER INFORMATION CONTACT:
Janessa Zucchetto, (240) 474–8226,
Electricity.Exports@hq.doe.gov.
SUPPLEMENTARY INFORMATION: The
United States Department of Energy
(DOE) regulates electricity exports from
the United States to foreign countries in
accordance with section 202(e) of the
Federal Power Act (FPA) (16 U.S.C.
824a(e)) and regulations thereunder (10
CFR 205.300 et seq.). Sections 301(b)
and 402(f) of the DOE Organization Act
(42 U.S.C. 7151(b) and 7172(f))
transferred this regulatory authority,
previously exercised by the nowdefunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides
that an entity which seeks to export
electricity must obtain an order from
DOE authorizing that export (16 U.S.C.
824a(e)). On April 10, 2023, the
authority to issue such orders was
delegated to the DOE’s Grid Deployment
Office (GDO) under Redelegation Order
No. S3–DEL–GD1–2023.
On November 22, 2024, Calpine
Solutions filed an application for the
renewal of authorization to transmit
electric energy from the United States to
Mexico for a term of five years. App. at
1.
According to the Application, Calpine
Solutions is ‘‘a California limited
liability company with its principal
place of business at 401 West A Street,
Suite 400, San Diego, California, and is
an indirect, wholly owned subsidiary of
Calpine Corporation.’’ Id. The Applicant
represents that its wholesale sales ‘‘are
made pursuant to authority granted by
the Federal Energy Regulatory
Commission (‘‘FERC’’) to sell wholesale
power at market-based rates under a
wholesale power sales tariff currently
on file with FERC.’’ Id. at 1–2.
The Applicant states it ‘‘does not own
or control electric generation,
transmission, cogeneration facilities, or
distribution facilities, nor does [it] have
a franchised service area.’’ App. at 5.
Calpine Solutions states that any
electric energy it exports ‘‘on either a
firm or interruptible basis, will be
surplus to the system of the generator
thereof.’’ Id. Thus, the Applicant states
that ‘‘its exports cannot have any
adverse impact on the reliability,
stability, or sufficiency of supply on a
franchise electric supply system or the
DATES:
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
electric power supply within the U.S.’’
Id. at 5–6.
Further, regarding the second
criterion used to analyze applications to
export electricity, Calpine Solutions
states it ‘‘will comply with existing
industry procedures for obtaining
transmission capacity’’ and ‘‘will
comply with any other export limits that
DOE may deem appropriate, consistent
with DOE’s orders authorizing exports
of electric energy by power marketers.’’
App. at 6–7.
The existing international
transmission facilities to be utilized by
the Applicant have been previously
authorized by Presidential permits
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties. See App. at Exhibit C.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at Electricity.Exports@
hq.doe.gov. Protests should be filed in
accordance with Rule 211 of FERC’s
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at
Electricity.Exports@hq.doe.gov in
accordance with FERC Rule 214 (18 CFR
385.214).
Comments and other filings
concerning Calpine Solutions’
Application should be clearly marked
with GDO Docket No. EA–284–G.
Additional copies are to be provided
directly to Rachael Marsh, Calpine
Corporation, 875 15th Street NW, Suite
700, Washington, DC 20005,
rachel.marsh@calpine.com, and Greg
Bass, Calpine Energy Solutions, LLC,
401 West A Street, Suite 500, San Diego,
CA 92101, greg.bass@calpine.com.
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the United States electric power supply
system.
Copies of this Application will be
made available, upon request, by
accessing the program website at
https://www.energy.gov/gdo/pendingapplications-0 or by emailing
Electricity.Exports@hq.doe.gov.
Signing Authority: This document of
the Department of Energy was signed on
December 13, 2024, by Maria Robinson,
Director, Grid Deployment Office,
pursuant to delegated authority from the
Secretary of Energy. That document
E:\FR\FM\19DEN1.SGM
19DEN1
Federal Register / Vol. 89, No. 244 / Thursday, December 19, 2024 / Notices
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on December
16, 2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2024–30221 Filed 12–18–24; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
lotter on DSK11XQN23PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER22–1697–003.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing: Order
No. 2222 Compliance Filing in
Response to March 2024 Order to be
effective 12/31/9998.
Filed Date: 12/13/24.
Accession Number: 20241213–5144.
Comment Date: 5 p.m. ET 1/3/25.
Docket Numbers: ER24–2037–001.
Applicants: Tucson Electric Power
Company.
Description: Compliance filing: Order
Nos. 2023 and 2023–A Second
Compliance Filing to be effective 8/15/
2024.
Filed Date: 12/13/24.
Accession Number: 20241213–5068.
Comment Date: 5 p.m. ET 1/3/25.
Docket Numbers: ER25–699–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 429—E&P
Agreement w/RWE to be effective 11/
12/2024.
Filed Date: 12/12/24.
Accession Number: 20241212–5228.
Comment Date: 5 p.m. ET 1/2/25.
Docket Numbers: ER25–700–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
4268R1 Blue Valley Grid GIA to be
effective 12/3/2024.
VerDate Sep<11>2014
18:08 Dec 18, 2024
Jkt 265001
Filed Date: 12/13/24.
Accession Number: 20241213–5023.
Comment Date: 5 p.m. ET 1/3/25.
Docket Numbers: ER25–701–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, Service Agreement No.
7432; AF1–140 to be effective 2/12/
2025.
Filed Date: 12/13/24.
Accession Number: 20241213–5034.
Comment Date: 5 p.m. ET 1/3/25.
Docket Numbers: ER25–702–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to WMPA, Service
Agreement No. 6082; Queue No. AF1–
039 to be effective 2/12/2025.
Filed Date: 12/13/24.
Accession Number: 20241213–5043.
Comment Date: 5 p.m. ET 1/3/25.
Docket Numbers: ER25–703–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1628R27 Western Farmers Electric
Cooperative NITSA NOAs to be effective
12/1/2024.
Filed Date: 12/13/24.
Accession Number: 20241213–5050.
Comment Date: 5 p.m. ET 1/3/25.
Docket Numbers: ER25–704–000.
Applicants: Amite Solar, LLC.
Description: § 205(d) Rate Filing:
Application for MBR Authorization to
be effective 2/12/2025.
Filed Date: 12/13/24.
Accession Number: 20241213–5102.
Comment Date: 5 p.m. ET 1/3/25.
Docket Numbers: ER25–705–000.
Applicants: Green River Solar, LLC.
Description: § 205(d) Rate Filing:
Application for MBR Authorization to
be effective 2/12/2025.
Filed Date: 12/13/24.
Accession Number: 20241213–5104.
Comment Date: 5 p.m. ET 1/3/25.
Docket Numbers: ER25–706–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original GIA Service Agreement No.
7433; Project Identifier No. AF2–306 to
be effective 11/15/2024.
Filed Date: 12/13/24.
Accession Number: 20241213–5108.
Comment Date: 5 p.m. ET 1/3/25.
Docket Numbers: ER25–707–000.
Applicants: Taunton Municipal
Lighting Plant Hudson Light & Power
Department North Attleborough Electric
Department.
Description: Petition for Declaratory
Order of Taunton Municipal Lighting
Plant Hudson Light & Power
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
103807
Department North Attleborough Electric
Department.
Filed Date: 12/2/24.
Accession Number: 20241202–5311.
Comment Date: 5 p.m. ET 12/23/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 13, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–30279 Filed 12–18–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3451–047]
Beaver Falls Municipal Authority;
Notice of Application Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
E:\FR\FM\19DEN1.SGM
19DEN1
Agencies
[Federal Register Volume 89, Number 244 (Thursday, December 19, 2024)]
[Notices]
[Pages 103806-103807]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-30221]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[GDO Docket No. EA-284-G]
Application for Renewal of Authorization To Export Electric
Energy; Calpine Energy Solutions, LLC
AGENCY: Grid Deployment Office, Department of Energy.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Calpine Energy Solutions, LLC (the Applicant or Calpine
Solutions) has applied for the renewal of authorization to transmit
electric energy from the United States to Mexico pursuant to the
Federal Power Act.
DATES: Comments, protests, or motions to intervene must be submitted on
or before January 21, 2025.
ADDRESSES: Comments, protests, motions to intervene, or requests for
more information should be addressed by electronic mail to
[email protected].
FOR FURTHER INFORMATION CONTACT: Janessa Zucchetto, (240) 474-8226,
[email protected].
SUPPLEMENTARY INFORMATION: The United States Department of Energy (DOE)
regulates electricity exports from the United States to foreign
countries in accordance with section 202(e) of the Federal Power Act
(FPA) (16 U.S.C. 824a(e)) and regulations thereunder (10 CFR 205.300 et
seq.). Sections 301(b) and 402(f) of the DOE Organization Act (42
U.S.C. 7151(b) and 7172(f)) transferred this regulatory authority,
previously exercised by the now-defunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides that an entity which seeks to
export electricity must obtain an order from DOE authorizing that
export (16 U.S.C. 824a(e)). On April 10, 2023, the authority to issue
such orders was delegated to the DOE's Grid Deployment Office (GDO)
under Redelegation Order No. S3-DEL-GD1-2023.
On November 22, 2024, Calpine Solutions filed an application for
the renewal of authorization to transmit electric energy from the
United States to Mexico for a term of five years. App. at 1.
According to the Application, Calpine Solutions is ``a California
limited liability company with its principal place of business at 401
West A Street, Suite 400, San Diego, California, and is an indirect,
wholly owned subsidiary of Calpine Corporation.'' Id. The Applicant
represents that its wholesale sales ``are made pursuant to authority
granted by the Federal Energy Regulatory Commission (``FERC'') to sell
wholesale power at market-based rates under a wholesale power sales
tariff currently on file with FERC.'' Id. at 1-2.
The Applicant states it ``does not own or control electric
generation, transmission, cogeneration facilities, or distribution
facilities, nor does [it] have a franchised service area.'' App. at 5.
Calpine Solutions states that any electric energy it exports ``on
either a firm or interruptible basis, will be surplus to the system of
the generator thereof.'' Id. Thus, the Applicant states that ``its
exports cannot have any adverse impact on the reliability, stability,
or sufficiency of supply on a franchise electric supply system or the
electric power supply within the U.S.'' Id. at 5-6.
Further, regarding the second criterion used to analyze
applications to export electricity, Calpine Solutions states it ``will
comply with existing industry procedures for obtaining transmission
capacity'' and ``will comply with any other export limits that DOE may
deem appropriate, consistent with DOE's orders authorizing exports of
electric energy by power marketers.'' App. at 6-7.
The existing international transmission facilities to be utilized
by the Applicant have been previously authorized by Presidential
permits issued pursuant to Executive Order 10485, as amended, and are
appropriate for open access transmission by third parties. See App. at
Exhibit C.
Procedural Matters: Any person desiring to be heard in this
proceeding should file a comment or protest to the Application at
[email protected]. Protests should be filed in accordance
with Rule 211 of FERC's Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to become a party to this proceeding
should file a motion to intervene at [email protected] in
accordance with FERC Rule 214 (18 CFR 385.214).
Comments and other filings concerning Calpine Solutions'
Application should be clearly marked with GDO Docket No. EA-284-G.
Additional copies are to be provided directly to Rachael Marsh, Calpine
Corporation, 875 15th Street NW, Suite 700, Washington, DC 20005,
[email protected], and Greg Bass, Calpine Energy Solutions, LLC,
401 West A Street, Suite 500, San Diego, CA 92101,
[email protected].
A final decision will be made on the requested authorization after
the environmental impacts have been evaluated pursuant to DOE's
National Environmental Policy Act Implementing Procedures (10 CFR part
1021) and after DOE evaluates whether the proposed action will have an
adverse impact on the sufficiency of supply or reliability of the
United States electric power supply system.
Copies of this Application will be made available, upon request, by
accessing the program website at https://www.energy.gov/gdo/pending-applications-0 or by emailing [email protected].
Signing Authority: This document of the Department of Energy was
signed on December 13, 2024, by Maria Robinson, Director, Grid
Deployment Office, pursuant to delegated authority from the Secretary
of Energy. That document
[[Page 103807]]
with the original signature and date is maintained by DOE. For
administrative purposes only, and in compliance with requirements of
the Office of the Federal Register, the undersigned DOE Federal
Register Liaison Officer has been authorized to sign and submit the
document in electronic format for publication, as an official document
of the Department of Energy. This administrative process in no way
alters the legal effect of this document upon publication in the
Federal Register.
Signed in Washington, DC, on December 16, 2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2024-30221 Filed 12-18-24; 8:45 am]