Minor Modification Notice, 102243 [2024-29694]
Download as PDF
Federal Register / Vol. 89, No. 242 / Tuesday, December 17, 2024 / Notices
ddrumheller on DSK120RN23PROD with NOTICES1
identified in the summary above, these
actions were also taken: (1) adoption of
the 2025 regulatory program fee
schedule; (2) approval of a contribution
to an abandoned mine drainage project;
(3) approval to release a proposed
general permit, GP–04 Into-Basin
Diversion of Water for public comment;
and (4) actions on 16 regulatory program
projects.
Project Applications Approved
1. Project Sponsor and Facility:
Chesapeake Appalachia, L.L.C.
(Susquehanna River), Sheshequin
Township, Bradford County, Pa.
Application for surface water
withdrawal of up to 4.000 mgd (peak
day).
2. Project Sponsor and Facility:
Coterra Energy Inc. (Tunkhannock
Creek), Lenox Township, Susquehanna
County, Pa. Application for renewal and
modification of surface water
withdrawal of up to 2.880 mgd (peak
day) (Docket No. 20191201).
3. Project Sponsor and Facility:
Coterra Energy Inc. (Tunkhannock
Creek), Nicholson Township, Wyoming
County, Pa. Application for renewal and
modification of surface water
withdrawal of up to 2.880 mgd (peak
day) (Docket No. 20230903).
4. Project Sponsor and Facility: Dover
Township, York County, Pa.
Application for groundwater
withdrawal of up to 0.144 mgd (30-day
average) from Well 11.
5. Project Sponsor and Facility: East
Cocalico Township Authority, East
Cocalico Township, Lancaster County,
Pa. Application for renewal of
groundwater withdrawal of up to 0.115
mgd (30-day average) from Well 2A
(Docket No. 19990901). Source and
service area are located in an
Environmental Justice area.
6. Project Sponsor and Facility:
Edgewood by Sand Springs, LLC
(Nescopeck Creek), Butler Township,
Luzerne County, Pa. Applications for
renewal of surface water withdrawal of
up to 0.317 mgd (peak day) and
consumptive use of up to 0.249 mgd
(30-day average) (Docket No. 19980102).
7. Project Sponsor: New Enterprise
Stone & Lime Co., Inc. Project Facility:
Roaring Spring Quarry (Halter Creek 2),
Taylor Township, Blair County, Pa.
Applications for renewal and
modification of consumptive use of up
to 0.380 mgd (peak day) and surface
water withdrawal of up to 0.288 mgd
(peak day) (Docket No. 19940705 and
Certificate of Registration No. GF–
202204215).
8. Project Sponsor: New Enterprise
Stone & Lime Co., Inc. Project Facility:
Shippensburg Quarry, Southampton
VerDate Sep<11>2014
19:45 Dec 16, 2024
Jkt 265001
Township, Cumberland County, Pa.
Applications for groundwater
withdrawals (30-day averages) of up to
0.065 mgd from the Transit Well and
0.020 mgd from the Quarry Well, and
consumptive use of up to 0.150 mgd
(peak day).
9. Project Sponsor and Facility:
Newport Borough Water Authority,
Oliver Township, Perry County, Pa.
Application for renewal and
modification of groundwater
withdrawal of up to 0.096 mgd (30-day
average) from Well 1 (Docket No.
20140908).
10. Project Sponsor: Pennsylvania
Fish & Boat Commission. Project
Facility: Benner Spring State Fish
Hatchery, Benner Township, Centre
County, Pa. Applications for
groundwater withdrawals (30-day
averages) of up to 0.720 mgd from Well
1 (renewal of Docket No. 19940701) and
up to 0.311 mgd from Well 3.
11. Project Sponsor and Facility:
Schuylkill County Municipal Authority,
Butler Township, Schuylkill County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.362 mgd (30-day
average) from the Gordon Well (Docket
No. 20090624). Service area is located
in an Environmental Justice area.
12. Project Sponsor and Facility:
Strasburg Lancaster County Borough
Authority, Strasburg Township,
Lancaster County, Pa. Application for
renewal of groundwater withdrawal of
up to 0.275 mgd (30-day average) from
the Fisher Well (Docket No. 19890107).
Service area is located in an
Environmental Justice area.
13. Project Sponsor and Facility: SWN
Production Company, LLC
(Susquehanna River), Great Bend
Township, Susquehanna County, Pa.
Application for renewal of surface water
withdrawal of up to 2.000 mgd (peak
day) (Docket No. 20191209).
14. Project Sponsor and Facility:
Tallman Family Farms, L.L.C.
(Wiconisco Creek), Washington
Township, Dauphin County, Pa.
Application for surface water
withdrawal of up to 0.720 mgd (peak
day).
Projects Tabled
15. Project Sponsor: The H&K Group.
Project Facility: Penn/MD Materials,
Fulton Township, Lancaster County, Pa.
Applications for consumptive use of up
to 0.024 mgd (peak day) and
groundwater withdrawals (30-day
averages) of up to 1.980 mgd from the
Pit Sump, 0.004 mgd from the Primary
and Secondary Well, and 0.011 mgd
from the Tertiary Well.
16. Project Sponsor: Valley CC LLC.
Project Facility: Valley Country Club,
PO 00000
Frm 00140
Fmt 4703
Sfmt 9990
102243
Sugarloaf Township, Luzerne County,
Pa. Applications for renewal of
groundwater withdrawals (30-day
averages) of up to 0.090 mgd from the
Shop Well and up to 0.090 mgd from
the Pumphouse Well (Docket No.
20090632).
Authority: Public Law 91–575, 84
Stat. 1509 et seq., 18 CFR parts 806, 807,
and 808.
Dated: December 12, 2024.
Jason E. Oyler
General Counsel and Secretary to the
Commission.
[FR Doc. 2024–29693 Filed 12–16–24; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Minor Modification Notice
Susquehanna River Basin
Commission.
AGENCY:
ACTION:
Notice.
This notice lists the minor
modifications approved for previously
approved projects by the Susquehanna
River Basin Commission during the
period set forth in DATES.
SUMMARY:
DATES:
November 1–30, 2024.
Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax (717)
238–2436; email: joyler@srbc.gov.
Regular mail inquiries may be sent to
the above address.
This
notice lists previously approved
projects, receiving approval of minor
modification, described below, pursuant
to 18 CFR 806.18 or to Commission
Resolution Nos. 2013–11 and 2015–06,
for the time period specified above.
1. Seneca Resources Company—
Cowanesque River, Docket No.
20241217, Deerfield Township, Tioga
County, Pa.; modification approval to
change the intake design; Approval
Date: November 13, 2024.
Authority: Public Law 91–575, 84
Stat. 1509 et seq., 18 CFR parts 806 and
808.
SUPPLEMENTARY INFORMATION:
Dated: December 12, 2024.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2024–29694 Filed 12–16–24; 8:45 am]
BILLING CODE 7040–01–P
E:\FR\FM\17DEN1.SGM
17DEN1
Agencies
[Federal Register Volume 89, Number 242 (Tuesday, December 17, 2024)]
[Notices]
[Page 102243]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-29694]
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Minor Modification Notice
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice lists the minor modifications approved for
previously approved projects by the Susquehanna River Basin Commission
during the period set forth in DATES.
DATES: November 1-30, 2024.
ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone: (717) 238-0423, ext. 1312; fax
(717) 238-2436; email: [email protected]. Regular mail inquiries may be
sent to the above address.
SUPPLEMENTARY INFORMATION: This notice lists previously approved
projects, receiving approval of minor modification, described below,
pursuant to 18 CFR 806.18 or to Commission Resolution Nos. 2013-11 and
2015-06, for the time period specified above.
1. Seneca Resources Company--Cowanesque River, Docket No. 20241217,
Deerfield Township, Tioga County, Pa.; modification approval to change
the intake design; Approval Date: November 13, 2024.
Authority: Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806 and 808.
Dated: December 12, 2024.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2024-29694 Filed 12-16-24; 8:45 am]