Rover Pipeline LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Rover-Bulger Compressor Station and Harmon Creek Meter Station Expansion Project, 102127-102133 [2024-29667]
Download as PDF
Federal Register / Vol. 89, No. 242 / Tuesday, December 17, 2024 / Notices
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters but will
not be telecast.
Issued: December 12, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–30057 Filed 12–13–24; 4:15 pm]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15376–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Kram Hydro 8, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On October 11, 2024, Kram Hydro 8,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
hydropower project that would be
located at the U.S. Army Corps of
Engineers’ (Corps) Howell Heflin Lock
and Dam on Tennessee-Tombigbee
River, near the Town of Gainesville, in
Sumter County, Alabama. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed Howell Heflin Lock and
Dam Hydroelectric Project would
consist of the following: (1) a 125-footwide, 350-foot-long armored intake
channel; (2) a 125-foot-long, 125-footwide concrete powerhouse located
downstream of the existing Corps dam
on the eastern bank, containing two
Kaplan turbine-generator units, with a
combined generating capacity of 30
megawatts; (3) a 200-foot-long, 125-footwide unlined tailrace; and (4) a 2.75mile-long, 46 kilovolt transmission line.
The proposed project would have an
estimated annual generation of 208.4
gigawatt-hours.
Applicant Contact: Kristen Fan, Kram
Hydro 8, 3120 Southwest Fwy., Suite
VerDate Sep<11>2014
19:45 Dec 16, 2024
Jkt 265001
101, PMB 50808, Houston, TX 77080;
phone: (772) 418–2705.
FERC Contact: Prabharanjani
Madduri; phone: (202) 502–8017, or by
email at prabharanjani.madduri@
ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/eFiling.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Debbie-Anne Reese,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne
Reese, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The first page of any filing should
include docket number P–15376–000.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
More information about this project,
including a copy of the application, can
be viewed, or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P–15376) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
102127
Dated: December 11, 2024.
Carlos D. Clay,
Acting Deputy Secretary.
[FR Doc. 2024–29669 Filed 12–16–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP25–12–000]
Rover Pipeline LLC; Notice of Scoping
Period Requesting Comments on
Environmental Issues for the Proposed
Rover-Bulger Compressor Station and
Harmon Creek Meter Station
Expansion Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document, that will
discuss the environmental impacts of
the Rover-Bulger Compressor Station
and Harmon Creek Meter Station
Expansion Project (Project) involving
construction and operation of facilities
by Rover Pipeline LLC (Rover) in Smith
Township, Washington County,
Pennsylvania. The Commission will use
this environmental document in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
from its action whenever it considers
the issuance of a Certificate of Public
Convenience and Necessity. This
gathering of public input is referred to
as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the environmental document on the
important environmental issues.
Additional information about the
Commission’s NEPA process is
described below in the NEPA Process
and Environmental Document section of
this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on
January 10, 2025. Comments may be
E:\FR\FM\17DEN1.SGM
17DEN1
102128
Federal Register / Vol. 89, No. 242 / Tuesday, December 17, 2024 / Notices
ddrumheller on DSK120RN23PROD with NOTICES1
submitted in written form. Further
details on how to submit comments are
provided in the Public Participation
section of this notice.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
staff determine what issues they need to
evaluate in the environmental
document. Commission staff will
consider all written comments during
the preparation of the environmental
document.
If you submitted comments on this
project to the Commission before the
opening of this docket on October 31,
2024, you will need to file those
comments in Docket No. CP25–12–000
to ensure they are considered as part of
this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
Rover provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
which addresses typically asked
questions, including the use of eminent
domain and how to participate in the
Commission’s proceedings. This fact
sheet along with other landowner topics
of interest are available for viewing on
the FERC website (www.ferc.gov) under
the Natural Gas, Landowner Topics link.
Public Participation
There are three methods you can use
to submit your comments to the
Commission. Please carefully follow
these instructions so that your
comments are properly recorded. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
a file with your submission. New
eFiling users must first create an
VerDate Sep<11>2014
19:45 Dec 16, 2024
Jkt 265001
account by clicking on ‘‘eRegister.’’ You
will be asked to select the type of filing
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP25–12–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Debbie-Anne A. Reese, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Room 1A,
Washington, DC 20426. Submissions
sent via any other carrier must be
addressed to: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Additionally, the Commission offers a
free service called eSubscription which
makes it easy to stay informed of all
issuances and submittals regarding the
dockets/projects to which you
subscribe. These instant email
notifications are the fastest way to
receive notification and provide a link
to the document files which can reduce
the amount of time you spend
researching proceedings. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
Summary of the Proposed Project
Rover proposes to construct, own, and
operate certain facilities at its existing
Bulger Compressor Station, located at
milepost 0 of Rover’s Burgettstown
Lateral in Washington County,
Pennsylvania. The proposed expansion
of the Bulger Compressor Station would
consist of the following facilities:
• one new 2,750-horsepower
compressor unit package and cooling;
• one discharge filter separator;
• one unit blowdown silencer;
• extension of the existing
compressor building and station
fencing; and
• associated interconnect piping
systems.
The Project also includes expansion
of Rover’s existing Harmon Creek
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Receipt Meter Station located within the
Bulger Compressor Station. The
proposed meter station expansion
consist of one ultrasonic meter skid, one
flow control skid, one filter separator,
and associated interconnect piping. The
Rover-Bulger Compressor Station and
Harmon Creek Meter Station Expansion
Project would allow Rover to ensure
delivery of Range Resources—
Appalachia LLC’s (Range) requested
transportation quantities at the required
pressures. According to Rover, the
Project is designed to provide to an
additional 400,000 dekatherms of
natural gas per day.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
The Project would impact about 8.38
acres of land within and immediately
adjacent to Rover’s existing Bulger
Compressor Station. About 8.05 acres of
land would be used for temporary
workspace, including 6.62 acres of
existing aboveground facilities, 1.09
acres of an existing permanent access
road, 0.24 acre of an existing parking
area, and 0.10 acre of a temporary access
road. Of the 8.38 acres, about 0.33 acre
of open space land cover would be
permanently impacted due to the
extension of the compressor station
fence line by 50 feet. Rover would
convert the 0.33 acre of open space land
cover to gravel to accommodate the
addition of the new compressor unit
and building.
NEPA Process and the Environmental
Document
Any environmental document issued
by the Commission will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under the relevant
general resource areas:
• geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• environmental justice;
• air quality and noise; and
• reliability and safety.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project and
make recommendations on how to
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’. For instructions on
connecting to eLibrary, refer to the last page of this
notice. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll free, (886)
208–3676 or TTY (202) 502–8659.
E:\FR\FM\17DEN1.SGM
17DEN1
Federal Register / Vol. 89, No. 242 / Tuesday, December 17, 2024 / Notices
lessen or avoid impacts on the various
resource areas. Your comments will
help Commission staff identify and
focus on the issues that might have an
effect on the human environment and
potentially eliminate others from further
study and discussion in the
environmental document.
Following this scoping period,
Commission staff will determine
whether to prepare an Environmental
Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the
EIS will present Commission staff’s
independent analysis of the issues. If
Commission staff prepares an EA, a
Notice of Schedule for the Preparation
of an Environmental Assessment will be
issued. The EA may be issued for an
allotted public comment period. The
Commission would consider timely
comments on the EA before making its
decision regarding the proposed project.
If Commission staff prepares an EIS, a
Notice of Intent to Prepare an EIS/
Notice of Schedule will be issued,
which will open up an additional
comment period. Staff will then prepare
a draft EIS which will be issued for
public comment. Commission staff will
consider all timely comments received
during the comment period on the draft
EIS and revise the document, as
necessary, before issuing a final EIS.
Any EA or draft and final EIS will be
available in electronic format in the
public record through eLibrary 2 and the
Commission’s natural gas
environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents). If
eSubscribed, you will receive instant
email notification when the
environmental document is issued.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the environmental document.3
ddrumheller on DSK120RN23PROD with NOTICES1
2 For instructions on connecting to eLibrary, refer
to the last page of this notice.
3 The Council on Environmental Quality
regulations addressing cooperating agency
VerDate Sep<11>2014
19:45 Dec 16, 2024
Jkt 265001
Agencies that would like to request
cooperating agency status should follow
the instructions for filing comments
provided under the Public Participation
section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office(s), and to solicit
their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.4
The environmental document for this
project will document findings on the
impacts on historic properties and
summarize the status of consultations
under section 106.
Environmental Mailing List
The environmental mailing list
federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American Tribes;
other interested parties; and local
libraries and newspapers. This list also
includes all affected landowners (as
defined in the Commission’s
regulations) who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within certain
distances of aboveground facilities, and
anyone who submits comments on the
project and includes a mailing address
with their comments. Commission staff
will update the environmental mailing
list as the analysis proceeds to ensure
that Commission notices related to this
environmental review are sent to all
responsibilities are at Title 40, Code of Federal
Regulations, Section 1501.8.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
102129
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number CP24–88–000 in
your request. If you are requesting a
change to your address, please be sure
to include your name and the correct
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/newsevents/events along with other related
information.
Dated: December 11, 2024.
Carlos D. Clay,
Acting Deputy Secretary.
Appendix 1
BILLING CODE 6717–01–P
E:\FR\FM\17DEN1.SGM
17DEN1
102130
Federal Register / Vol. 89, No. 242 / Tuesday, December 17, 2024 / Notices
ROVER PIPELINE, LLC
o:::-·-,
ROWR•BULGER COMPRESSOR
C
$TATIONAND HARMON CREEK
METER STATION. EXPANSION
W•ehlngton County, PA
USGS 1', 5' 011,dr•ngt,:
Clnloo, f'l', ,40080·0:I
NAO 11163 UTM Zone 17N
Rover Pipeline Segment
Project Area
o
o
40.3862'N 804022'W
N
Figure 1-1: Project
Location Map
A
Appendix 2
VerDate Sep<11>2014
19:45 Dec 16, 2024
Jkt 265001
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
E:\FR\FM\17DEN1.SGM
17DEN1
EN17DE24.082
ddrumheller on DSK120RN23PROD with NOTICES1
1:250,000
Federal Register / Vol. 89, No. 242 / Tuesday, December 17, 2024 / Notices
102131
MAILING LIST UPDATE FORM
Rover-Bulger Compressor Station and Harmon Creek Meter Station Expansion Project
Name
--------------------
Agency_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Address
-------------------
VerDate Sep<11>2014
D
Please update the mailing list
D
Please remove my name from the mailing list
19:45 Dec 16, 2024
Jkt 265001
PO 00000
Frm 00028
Fmt 4703
Sfmt 4725
E:\FR\FM\17DEN1.SGM
17DEN1
EN17DE24.083
ddrumheller on DSK120RN23PROD with NOTICES1
City_ _ _ _ _ _ _ _State___ Zip Code_ _ __
102132
Federal Register / Vol. 89, No. 242 / Tuesday, December 17, 2024 / Notices
FROM._ _ _ _ _ _ _ _ _ __
ATIN:
OEP - Gas 5, PJ - 11.5
Federal Energy Regulatory Commission
888 First Street NE
Washington, DC 20426
EN17DE24.085
Project
Staple or Tape Here
VerDate Sep<11>2014
19:45 Dec 16, 2024
Jkt 265001
PO 00000
Frm 00029
Fmt 4703
Sfmt 4725
E:\FR\FM\17DEN1.SGM
17DEN1
EN17DE24.084
ddrumheller on DSK120RN23PROD with NOTICES1
CP25-12-000 Rover-Bulger Compressor Station and Harmon Creek Meter Station Expansion
Federal Register / Vol. 89, No. 242 / Tuesday, December 17, 2024 / Notices
[FR Doc. 2024–29667 Filed 12–16–24; 8:45 am]
BILLING CODE 6717–01–C
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC25–28–000.
Applicants: Plus Power, Cranberry
Point Energy Storage, LLC, Cross Town
Energy Storage, LLC, Energy Storage
Resources, LLC, Sierra Estrella Energy
Storage LLC, Superstition Energy
Storage LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Plus Power, LLC,
et al.
Filed Date: 12/10/24.
Accession Number: 20241210–5208.
Comment Date: 5 p.m. ET 12/31/24.
Docket Numbers: EC25–29–000.
Applicants: Washington Wind LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Washington Wind
LLC.
Filed Date: 12/10/24.
Accession Number: 20241210–5213.
Comment Date: 5 p.m. ET 12/31/24.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG25–59–000.
Applicants: SMT Mission II LLC.
Description: SMT Mission II LLC
submits Notice of Self–Certification of
Exempt Wholesale Generator Status.
Filed Date: 12/11/24.
Accession Number: 20241211–5028.
Comment Date: 5 p.m. ET 1/1/25.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–1411–005;
ER12–1436–021; ER15–1447–009;
ER18–280–010; ER18–533–008; ER18–
534–008; ER18–535–008; ER18–536–
008; ER18–537–008; ER18–538–009;
ER20–2048–003; ER21–573–006; ER21–
574–006; ER21–575–006; ER21–2317–
002; ER22–48–006.
Applicants: Gridflex Generation, LLC,
Richland-Stryker Generation LLC,
Lanyard Power Marketing, LLC,
Dickerson Power, LLC, Chalk Point
Power, LLC, Ellwood Power, LLC,
Sidney, LLC, Monument Generating
Station, LLC,O.H. Hutchings CT, LLC,
Yankee Street, LLC, Montpelier
Generating Station, LLC, Tait Electric
VerDate Sep<11>2014
19:45 Dec 16, 2024
Jkt 265001
Generating Station, LLC, Lee County
Generating Station, LLC, Mid-Georgia
Cogen L.P., Eagle Point Power
Generation LLC, GenOn Bowline, LLC.
Description: Notice of Non-Material
Change in Status of Bowline, LLC, et al.
Filed Date: 12/10/24.
Accession Number: 20241210–5212.
Comment Date: 5 p.m. ET 12/31/24.
Docket Numbers: ER20–2186–003;
EL20–62–001.
Applicants: Fern Solar LLC, Fern
Solar LLC.
Description: Schedule 1 to Fern Solar
LLC’s compliance filing to the 10/17/
2024 Commission’s order, Opinion No.
591, Order on Initial Decision.
Filed Date: 12/9/24.
Accession Number: 20241209–5276.
Comment Date: 5 p.m. ET 12/30/24.
Docket Numbers: ER25–679–000.
Applicants: AlbertaEx, L.P.
Description: § 205(d) Rate Filing:
Filing of Contribution in Aid and
Construction Agreement_ITCMW RS
236 to be effective 2/8/2025.
Filed Date: 12/9/24.
Accession Number: 20241209–5159.
Comment Date: 5 p.m. ET 12/30/24.
Docket Numbers: ER25–688–000.
Applicants: The Potomac Edison
Company.
Description: § 205(d) Rate Filing:
Potomac Edison’s Request for Order
Authorizing Abandoned Plant Incentive
to be effective 2/10/2025.
Filed Date: 12/11/24.
Accession Number: 20241211–5051.
Comment Date: 5 p.m. ET 1/1/25.
Docket Numbers: ER25–689–000.
Applicants: Cooperative Energy.
Description: § 205(d) Rate Filing:
2024–12–11_SA 4411 Cooperative
Energy-Bluestown Solar E&P (J2127) to
be effective 12/12/2024.
Filed Date: 12/11/24.
Accession Number: 20241211–5054.
Comment Date: 5 p.m. ET 1/1/25.
Docket Numbers: ER25–690–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 375—Papago
LGIA Amendment No. 1 to be effective
2/10/2025.
Filed Date: 12/11/24.
Accession Number: 20241211–5063.
Comment Date: 5 p.m. ET 1/1/25.
Docket Numbers: ER25–691–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Initial Filing of Service Agreement No.
619 to be effective 11/12/2025.
Filed Date: 12/11/24.
Accession Number: 20241211–5095.
Comment Date: 5 p.m. ET 1/1/25.
PO 00000
Frm 00030
Fmt 4703
Sfmt 9990
102133
Docket Numbers: ER25–692–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
UAMPS TSOA Rev 9 (R.S. No. 297) to
be effective 2/10/2025.
Filed Date: 12/11/24.
Accession Number: 20241211–5096.
Comment Date: 5 p.m. ET 1/1/25.
Docket Numbers: ER25–693–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
UMPA TSOA Rev 7 (R.S. No. 637) to be
effective 2/10/2025.
Filed Date: 12/11/24.
Accession Number: 20241211–5097.
Comment Date: 5 p.m. ET 1/1/25.
Docket Numbers: ER25–694–000.
Applicants: San Diego Gas & Electric.
Description: § 205(d) Rate Filing: 2025
RS Filing to be effective 1/1/2025.
Filed Date: 12/11/24.
Accession Number: 20241211–5157.
Comment Date: 5 p.m. ET 1/1/25.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 11, 2024.
Carlos D. Clay,
Acting Deputy Secretary.
[FR Doc. 2024–29665 Filed 12–16–24; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\17DEN1.SGM
17DEN1
Agencies
[Federal Register Volume 89, Number 242 (Tuesday, December 17, 2024)]
[Notices]
[Pages 102127-102133]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-29667]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP25-12-000]
Rover Pipeline LLC; Notice of Scoping Period Requesting Comments
on Environmental Issues for the Proposed Rover-Bulger Compressor
Station and Harmon Creek Meter Station Expansion Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental document, that will discuss
the environmental impacts of the Rover-Bulger Compressor Station and
Harmon Creek Meter Station Expansion Project (Project) involving
construction and operation of facilities by Rover Pipeline LLC (Rover)
in Smith Township, Washington County, Pennsylvania. The Commission will
use this environmental document in its decision-making process to
determine whether the project is in the public convenience and
necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies regarding the project. As part of the National Environmental
Policy Act (NEPA) review process, the Commission takes into account
concerns the public may have about proposals and the environmental
impacts that could result from its action whenever it considers the
issuance of a Certificate of Public Convenience and Necessity. This
gathering of public input is referred to as ``scoping.'' The main goal
of the scoping process is to focus the analysis in the environmental
document on the important environmental issues. Additional information
about the Commission's NEPA process is described below in the NEPA
Process and Environmental Document section of this notice.
By this notice, the Commission requests public comments on the
scope of issues to address in the environmental document. To ensure
that your comments are timely and properly recorded, please submit your
comments so that the Commission receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on January 10, 2025. Comments may be
[[Page 102128]]
submitted in written form. Further details on how to submit comments
are provided in the Public Participation section of this notice.
Your comments should focus on the potential environmental effects,
reasonable alternatives, and measures to avoid or lessen environmental
impacts. Your input will help the Commission staff determine what
issues they need to evaluate in the environmental document. Commission
staff will consider all written comments during the preparation of the
environmental document.
If you submitted comments on this project to the Commission before
the opening of this docket on October 31, 2024, you will need to file
those comments in Docket No. CP25-12-000 to ensure they are considered
as part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
Rover provided landowners with a fact sheet prepared by the FERC
entitled ``An Interstate Natural Gas Facility On My Land? What Do I
Need To Know?'' which addresses typically asked questions, including
the use of eminent domain and how to participate in the Commission's
proceedings. This fact sheet along with other landowner topics of
interest are available for viewing on the FERC website (www.ferc.gov)
under the Natural Gas, Landowner Topics link.
Public Participation
There are three methods you can use to submit your comments to the
Commission. Please carefully follow these instructions so that your
comments are properly recorded. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. Using eComment is an easy method for
submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; a comment on a particular project is considered a ``Comment
on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP25-
12-000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
Additionally, the Commission offers a free service called
eSubscription which makes it easy to stay informed of all issuances and
submittals regarding the dockets/projects to which you subscribe. These
instant email notifications are the fastest way to receive notification
and provide a link to the document files which can reduce the amount of
time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202)502-6595 or [email protected].
Summary of the Proposed Project
Rover proposes to construct, own, and operate certain facilities at
its existing Bulger Compressor Station, located at milepost 0 of
Rover's Burgettstown Lateral in Washington County, Pennsylvania. The
proposed expansion of the Bulger Compressor Station would consist of
the following facilities:
one new 2,750-horsepower compressor unit package and
cooling;
one discharge filter separator;
one unit blowdown silencer;
extension of the existing compressor building and station
fencing; and
associated interconnect piping systems.
The Project also includes expansion of Rover's existing Harmon
Creek Receipt Meter Station located within the Bulger Compressor
Station. The proposed meter station expansion consist of one ultrasonic
meter skid, one flow control skid, one filter separator, and associated
interconnect piping. The Rover-Bulger Compressor Station and Harmon
Creek Meter Station Expansion Project would allow Rover to ensure
delivery of Range Resources--Appalachia LLC's (Range) requested
transportation quantities at the required pressures. According to
Rover, the Project is designed to provide to an additional 400,000
dekatherms of natural gas per day.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary''. For instructions on
connecting to eLibrary, refer to the last page of this notice. For
assistance, contact FERC at [email protected] or call toll
free, (886) 208-3676 or TTY (202) 502-8659.
---------------------------------------------------------------------------
Land Requirements for Construction
The Project would impact about 8.38 acres of land within and
immediately adjacent to Rover's existing Bulger Compressor Station.
About 8.05 acres of land would be used for temporary workspace,
including 6.62 acres of existing aboveground facilities, 1.09 acres of
an existing permanent access road, 0.24 acre of an existing parking
area, and 0.10 acre of a temporary access road. Of the 8.38 acres,
about 0.33 acre of open space land cover would be permanently impacted
due to the extension of the compressor station fence line by 50 feet.
Rover would convert the 0.33 acre of open space land cover to gravel to
accommodate the addition of the new compressor unit and building.
NEPA Process and the Environmental Document
Any environmental document issued by the Commission will discuss
impacts that could occur as a result of the construction and operation
of the proposed project under the relevant general resource areas:
geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
environmental justice;
air quality and noise; and
reliability and safety.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project and make recommendations on
how to
[[Page 102129]]
lessen or avoid impacts on the various resource areas. Your comments
will help Commission staff identify and focus on the issues that might
have an effect on the human environment and potentially eliminate
others from further study and discussion in the environmental document.
Following this scoping period, Commission staff will determine
whether to prepare an Environmental Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the EIS will present Commission
staff's independent analysis of the issues. If Commission staff
prepares an EA, a Notice of Schedule for the Preparation of an
Environmental Assessment will be issued. The EA may be issued for an
allotted public comment period. The Commission would consider timely
comments on the EA before making its decision regarding the proposed
project. If Commission staff prepares an EIS, a Notice of Intent to
Prepare an EIS/Notice of Schedule will be issued, which will open up an
additional comment period. Staff will then prepare a draft EIS which
will be issued for public comment. Commission staff will consider all
timely comments received during the comment period on the draft EIS and
revise the document, as necessary, before issuing a final EIS. Any EA
or draft and final EIS will be available in electronic format in the
public record through eLibrary \2\ and the Commission's natural gas
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you
will receive instant email notification when the environmental document
is issued.
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the environmental document.\3\ Agencies that would like
to request cooperating agency status should follow the instructions for
filing comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Section 1501.8.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office(s),
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\4\ The environmental document for this
project will document findings on the impacts on historic properties
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list federal, state, and local government
representatives and agencies; elected officials; environmental and
public interest groups; Native American Tribes; other interested
parties; and local libraries and newspapers. This list also includes
all affected landowners (as defined in the Commission's regulations)
who are potential right-of-way grantors, whose property may be used
temporarily for project purposes, or who own homes within certain
distances of aboveground facilities, and anyone who submits comments on
the project and includes a mailing address with their comments.
Commission staff will update the environmental mailing list as the
analysis proceeds to ensure that Commission notices related to this
environmental review are sent to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please complete one of
the following steps:
(1) Send an email to [email protected] stating your
request. You must include the docket number CP24-88-000 in your
request. If you are requesting a change to your address, please be sure
to include your name and the correct address. If you are requesting to
delete your address from the mailing list, please include your name and
address as it appeared on this notice. This email address is unable to
accept comments.
OR
(2) Return the attached ``Mailing List Update Form'' (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field. Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at [email protected] or (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at https://www.ferc.gov/news-events/events along with
other related information.
Dated: December 11, 2024.
Carlos D. Clay,
Acting Deputy Secretary.
Appendix 1
BILLING CODE 6717-01-P
[[Page 102130]]
[GRAPHIC] [TIFF OMITTED] TN17DE24.082
Appendix 2
[[Page 102131]]
[GRAPHIC] [TIFF OMITTED] TN17DE24.083
[[Page 102132]]
[GRAPHIC] [TIFF OMITTED] TN17DE24.084
[GRAPHIC] [TIFF OMITTED] TN17DE24.085
[[Page 102133]]
[FR Doc. 2024-29667 Filed 12-16-24; 8:45 am]
BILLING CODE 6717-01-C