Notice of Availability of the Record of Decision for the Lava Ridge Wind Project in Jerome, Lincoln, and Minidoka Counties, Idaho, 99904 [2024-29099]
Download as PDF
99904
Federal Register / Vol. 89, No. 238 / Wednesday, December 11, 2024 / Notices
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[BLM_ID_FRN; MO# 4500183156]
Notice of Availability of the Record of
Decision for the Lava Ridge Wind
Project in Jerome, Lincoln, and
Minidoka Counties, Idaho
Bureau of Land Management,
Interior.
ACTION: Notice of availability.
AGENCY:
The Bureau of Land
Management (BLM) announces the
availability of the Record of Decision
(ROD) for the Lava Ridge Wind Project
Final Environmental Impact Statement
(EIS). The ROD constitutes the decision
of the BLM, as approved by the
Department of the Interior (DOI).
DATES: The ROD was signed on Dec. 5,
2024.
ADDRESSES: The ROD is available at
https://eplanning.blm.gov/eplanning-ui/
project/2013782/510 and in hard copy
at the BLM Shoshone Field Office, 400
W F St., Shoshone, ID 83352.
FOR FURTHER INFORMATION CONTACT:
Kasey Prestwich, project manager,
telephone 208–732–7204; address in
ADDRESSES above; and email
kprestwich@blm.gov. Individuals in the
United States who are deaf, deafblind,
hard of hearing, or have a speech
disability may dial 711 (TTY, TDD, or
TeleBraille) to access
telecommunications relay services for
contacting Mr. Prestwich. Individuals
outside the United States should use the
relay services offered within their
country to make international calls to
the point-of-contact in the United
States.
SUPPLEMENTARY INFORMATION: The DOI
has approved the BLM’s decision to
issue a right-of-way (ROW) grant for the
Lava Ridge Wind Project. Consistent
with the direction provided through the
ROD and applicable laws and
regulations, the BLM will issue Magic
Valley Energy (MVE) a non-exclusive,
non-possessory ROW grant with
stipulations, to construct, operate and
maintain, and decommission a windpowered electrical generation facility on
public lands within Jerome, Lincoln,
and Minidoka counties, Idaho. The
ROW grant will authorize MVE to
develop and operate the project as
described in an approved plan of
development, updated consistent with
the terms established in the ROD.
The ROW authorizes installation of
up to 231 wind turbines, along with
related infrastructure and facilities on
BLM-managed public lands. The ROW
lotter on DSK11XQN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
18:17 Dec 10, 2024
Jkt 265001
grant issued by the BLM will require
MVE to comply with terms and
conditions, including project avoidance
and minimization measures, fulfill
compensatory mitigation requirements,
adhere to processes established for the
preservation of historic properties, and
meet any additional requirements, such
as obtaining additional permits or
authorizations, established by Federal,
State, or local laws.
The ROW area encompasses the BLMmanaged public lands delineated and
described in Appendices A and B of the
ROD. The estimated total area of the
ROW is 57,447 acres, with all projectrelated infrastructure and facilities
confined within the designated siting
corridors. The siting corridors,
estimated to be 38,535 acres, limit the
location of the project infrastructure to
areas considered within the Lava Ridge
Wind Project Final EIS; however, the
final footprint of the project will be
smaller and consistent with the
disturbance area described in the Final
EIS (the portion of ground disturbance
on public lands is estimated to be 3,926
acres).
The decision to authorize this energy
generation project on BLM-managed
public lands is consistent with the
Federal Land Policy and Management
Act, as amended, and the BLM’s ROW
regulations (43 U.S.C. 1761; 43 CFR part
2800).
Approval of this ROW constitutes the
final decision of the DOI and, in
accordance with the regulations at 43
CFR 4.410(a)(3), is not subject to appeal
under DOI regulations at 43 CFR part 4.
[FR Doc. 2024–29099 Filed 12–10–24; 8:45 am]
BILLING CODE 4331–21–P
DEPARTMENT OF THE INTERIOR
Bureau of Ocean Energy Management
[Docket No. BOEM–2023–0061]
Notice of Availability of the California
Offshore Wind Draft Programmatic
Environmental Impact Statement;
Correction
Bureau of Ocean Energy
Management, Interior.
ACTION: Notice of availability;
correction.
AGENCY:
BOEM published a document
in the Federal Register of November 14,
2024, concerning a Notice of
Availability for the California Offshore
Wind Draft Programmatic
Environmental Impact Statement. The
PO 00000
Frm 00078
Fmt 4703
Sfmt 4703
Correction
In the Federal Register of November
14, 2024, in FR Doc. 2024–26424, at 89
FR 90051, in the second column, correct
‘‘Submission of Public Comments’’ to
read: The 90-day comment period began
on November 14, 2024.
Douglas P. Boren,
Pacific Regional Director, Bureau of Ocean
Energy Management.
[FR Doc. 2024–29103 Filed 12–10–24; 8:45 am]
BILLING CODE 4340–98–P
INTERNATIONAL TRADE
COMMISSION
[Investigation Nos. 701–TA–716–719 and
731–TA–1683–1687 (Final)]
Epoxy Resins From China, India, South
Korea, Taiwan, and Thailand; Revised
Schedule for the Subject
Investigations
United States International
Trade Commission.
ACTION: Notice.
AGENCY:
DATES:
November 29, 2024.
FOR FURTHER INFORMATION CONTACT:
Michael C. Courtney,
Twin Falls District Manager.
SUMMARY:
document contained the incorrect start
date of the 90-day comment period.
FOR FURTHER INFORMATION CONTACT: Lisa
Gilbane, Chief, Environmental Analysis
Section, Bureau of Ocean Energy
Management, Camarillo, California
Office, 760 Paseo Camarillo, Suite 102,
Camarillo, CA 93010, (805) 384–6387 or
lisa.gilbane@boem.gov.
SUPPLEMENTARY INFORMATION:
Alejandro Orozco (202–205–3177),
Office of Investigations, U.S.
International Trade Commission, 500 E
Street SW, Washington, DC 20436.
Hearing-impaired persons can obtain
information on this matter by contacting
the Commission’s TDD terminal on 202–
205–1810. Persons with mobility
impairments who will need special
assistance in gaining access to the
Commission should contact the Office
of the Secretary at 202–205–2000.
General information concerning the
Commission may also be obtained by
accessing its internet server (https://
www.usitc.gov). The public record for
this investigation may be viewed on the
Commission’s electronic docket (EDIS)
at https://edis.usitc.gov.
SUPPLEMENTARY INFORMATION: Effective
November 13, 2024, the Commission
established a schedule for the conduct
of the final phase of the subject
investigations (89 FR 92719, November
22, 2024) following the U.S. Department
of Commerce’s (‘‘Commerce’’)
E:\FR\FM\11DEN1.SGM
11DEN1
Agencies
[Federal Register Volume 89, Number 238 (Wednesday, December 11, 2024)]
[Notices]
[Page 99904]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-29099]
[[Page 99904]]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[BLM_ID_FRN; MO# 4500183156]
Notice of Availability of the Record of Decision for the Lava
Ridge Wind Project in Jerome, Lincoln, and Minidoka Counties, Idaho
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) announces the availability
of the Record of Decision (ROD) for the Lava Ridge Wind Project Final
Environmental Impact Statement (EIS). The ROD constitutes the decision
of the BLM, as approved by the Department of the Interior (DOI).
DATES: The ROD was signed on Dec. 5, 2024.
ADDRESSES: The ROD is available at https://eplanning.blm.gov/eplanning-ui/project/2013782/510 and in hard copy at the BLM Shoshone Field
Office, 400 W F St., Shoshone, ID 83352.
FOR FURTHER INFORMATION CONTACT: Kasey Prestwich, project manager,
telephone 208-732-7204; address in ADDRESSES above; and email
[email protected]. Individuals in the United States who are deaf,
deafblind, hard of hearing, or have a speech disability may dial 711
(TTY, TDD, or TeleBraille) to access telecommunications relay services
for contacting Mr. Prestwich. Individuals outside the United States
should use the relay services offered within their country to make
international calls to the point-of-contact in the United States.
SUPPLEMENTARY INFORMATION: The DOI has approved the BLM's decision to
issue a right-of-way (ROW) grant for the Lava Ridge Wind Project.
Consistent with the direction provided through the ROD and applicable
laws and regulations, the BLM will issue Magic Valley Energy (MVE) a
non-exclusive, non-possessory ROW grant with stipulations, to
construct, operate and maintain, and decommission a wind-powered
electrical generation facility on public lands within Jerome, Lincoln,
and Minidoka counties, Idaho. The ROW grant will authorize MVE to
develop and operate the project as described in an approved plan of
development, updated consistent with the terms established in the ROD.
The ROW authorizes installation of up to 231 wind turbines, along
with related infrastructure and facilities on BLM-managed public lands.
The ROW grant issued by the BLM will require MVE to comply with terms
and conditions, including project avoidance and minimization measures,
fulfill compensatory mitigation requirements, adhere to processes
established for the preservation of historic properties, and meet any
additional requirements, such as obtaining additional permits or
authorizations, established by Federal, State, or local laws.
The ROW area encompasses the BLM-managed public lands delineated
and described in Appendices A and B of the ROD. The estimated total
area of the ROW is 57,447 acres, with all project-related
infrastructure and facilities confined within the designated siting
corridors. The siting corridors, estimated to be 38,535 acres, limit
the location of the project infrastructure to areas considered within
the Lava Ridge Wind Project Final EIS; however, the final footprint of
the project will be smaller and consistent with the disturbance area
described in the Final EIS (the portion of ground disturbance on public
lands is estimated to be 3,926 acres).
The decision to authorize this energy generation project on BLM-
managed public lands is consistent with the Federal Land Policy and
Management Act, as amended, and the BLM's ROW regulations (43 U.S.C.
1761; 43 CFR part 2800).
Approval of this ROW constitutes the final decision of the DOI and,
in accordance with the regulations at 43 CFR 4.410(a)(3), is not
subject to appeal under DOI regulations at 43 CFR part 4.
Michael C. Courtney,
Twin Falls District Manager.
[FR Doc. 2024-29099 Filed 12-10-24; 8:45 am]