Combined Notice of Filings #1, 96236-96237 [2024-28412]
Download as PDF
96236
Federal Register / Vol. 89, No. 233 / Wednesday, December 4, 2024 / Notices
MW and hydraulic capacity to decrease
from 3,500 cfs to 3,160 cfs.
On September 30, 2024, the
Commission issued a public notice for
the proposed amendment. On October
30, 2024, the South Caronia Department
of Natural Resources filed comments on
the proposal. DESC filed a response to
comments on November 8, 2024.
This notice identifies Commission
staff’s intention to prepare an
environmental assessment (EA) for the
project.1 Commission staff plans to issue
an EA by July 18, 2025. Revisions to the
schedule may be made as appropriate.
The EA will be issued for a 30-day
comment period. All comments filed on
the EA will be reviewed by staff and
considered in the Commission’s final
decision on the proceeding.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members, and
others to access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Any questions regarding this notice
may be directed to Elizabeth Moats at
202–502–6632 or
Elizabeth.OsierMoats@ferc.gov.
Dated: November 27, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–28407 Filed 12–3–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG25–46–000.
Applicants: Bocanova Power LLC.
Description: Bocanova Power LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 11/27/24.
Accession Number: 20241127–5213.
Comment Date: 5 p.m. ET 12/18/24.
1 In accordance with the Council on
Environmental Quality’s regulations, the unique
identification number for documents relating to this
environmental review is EAXX–019–20–000–
1732197559. 40 CFR 1501.5(c)(4) (2024).
VerDate Sep<11>2014
17:36 Dec 03, 2024
Jkt 265001
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL25–22–000.
Applicants: Advanced Energy United,
American Clean Power Association,
Solar Energy Industries Association,
American Clean Power Association
Solar Energy Industries Association
Advanced Energy United v. PJM
Interconnection, L.L.C.
Description: Complaint of American
Clean Power Association, Solar Energy
Industries Association, and Advanced
Energy United v. PJM Interconnection,
L.L.C.
Filed Date: 11/26/24.
Accession Number: 20241126–5340.
Comment Date: 5 p.m. ET 12/16/24.
Docket Numbers: EL25–23–000.
Applicants: Rio Grande Electric
Cooperative, Inc.
Description: Petition for Declaratory
Order of Rio Grande Electric
Cooperative, Inc.
Filed Date: 11/26/24.
Accession Number: 20241126–5341.
Comment Date: 5 p.m. ET 12/17/24.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER24–2034–001.
Applicants: GridLiance Heartland
LLC.
Description: Compliance filing:
Gridliance Heartland Further Order
2023 Compliance Filing to be effective
9/1/2024.
Filed Date: 11/27/24.
Accession Number: 20241127–5158.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–313–001;
ER25–314–001; ER25–315–001.
Applicants: South River OnSite
Generation, LLC, Martinsville OnSite
Generation, LLC, Clyde Onsite
Generation, LLC.
Description: Supplement to
10/31/2024, Clyde Onsite Generation,
LLC submits tariff filing Notice of
Change in Status and Tariff Revisions.
Filed Date: 11/22/24.
Accession Number: 20241122–5290.
Comment Date: 5 p.m. ET 12/13/24.
Docket Numbers: ER25–346–001.
Applicants: Public Service Company
of Colorado.
Description: Tariff Amendment:
2024–11–27 Att O–SPS Formula Rates—
Order 898—Errata Filing to be effective
1/1/2025.
Filed Date: 11/27/24.
Accession Number: 20241127–5151.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–580–000.
Applicants: Pacific Gas and Electric
Company.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Description: § 205(d) Rate Filing:
WDT SA 17: November 2024 WAPA
Service Agreement Biannual Filing to be
effective 2/1/2025.
Filed Date: 11/27/24.
Accession Number: 20241127–5001.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–581–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: TO
SA 59: November 2024 WAPA
Interconnection Agreement Biannual
Filing to be effective 2/1/2025.
Filed Date: 11/27/24.
Accession Number: 20241127–5002.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–582–000.
Applicants: NextEra Energy
Transmission Southwest, LLC.
Description: § 205(d) Rate Filing:
NextEra Energy Transmission
Southwest, LLC Depreciation Rate
Revisions to be effective 2/1/2025.
Filed Date: 11/27/24.
Accession Number: 20241127–5067.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–583–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Ministerial Clean-up Filing of Tariff,
Definitions R—S to be effective 12/3/
2019.
Filed Date: 11/27/24.
Accession Number: 20241127–5093.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–584–000.
Applicants: Constellation Mystic
Power, LLC.
Description: Compliance filing:
Compliance Filing of Tariff Records to
Implement ROE Settlement to be
effective 6/1/2022.
Filed Date: 11/27/24.
Accession Number: 20241127–5136.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–586–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amended ISA, SA No. 2637; AF1–177
to be effective 1/27/2025.
Filed Date: 11/27/24.
Accession Number: 20241127–5144.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–588–000.
Applicants: Essential Power
Newington, LLC.
Description: § 205(d) Rate Filing:
IROL–CIP Rate Schedule to be effective
1/27/2025.
Filed Date: 11/27/24.
Accession Number: 20241127–5166.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–589–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
E:\FR\FM\04DEN1.SGM
04DEN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 89, No. 233 / Wednesday, December 4, 2024 / Notices
Description: § 205(d) Rate Filing:
Amendment to Rate Schedule FERC No.
57 to be effective 1/27/2025.
Filed Date: 11/27/24.
Accession Number: 20241127–5187.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–590–000.
Applicants: Pome BESS LLC.
Description: § 205(d) Rate Filing:
POME BESS Section 205 Filing to be
effective 12/31/9998.
Filed Date: 11/27/24.
Accession Number: 20241127–5240.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–591–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
DEC–CEPCI RS No. 665 Reimbursement
Agmt to be effective 2/1/2025.
Filed Date: 11/27/24.
Accession Number: 20241127–5245.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25–592–000.
Applicants: Wisconsin Power and
Light Company.
Description: Initial rate filing: WPL
Rate Schedule for Blackstart Resource
Services to be effective 1/27/2025.
Filed Date: 11/27/24.
Accession Number: 20241127–5255.
Comment Date: 5 p.m. ET 12/18/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
VerDate Sep<11>2014
17:36 Dec 03, 2024
Jkt 265001
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: November 27, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–28412 Filed 12–3–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP22–21–000; CP22–21–001;
CP22–22–000; CP22–22–001]
Venture Global CP2 LNG, LLC, Venture
Global CP Express, LLC; Notice of
Schedule for the Preparation of a
Supplemental Environmental Impact
Statement for the CP2 LNG Project and
CP Express Pipeline Project
On June 27, 2024, the Federal Energy
Regulatory Commission (Commission or
FERC) issued an Order Granting
Authorizations Under Sections 3 and 7
of the Natural Gas Act (Authorization
Order) for Venture Global CP2 LNG,
LLC’s CP2 LNG Project and Venture
Global CP Express, LLC’s CP Express
Pipeline Project.1 On July 29, 2024, a
coalition of petitioners (Petitioners)
filed a timely request for rehearing and
motion for stay of the Authorization
Order. On November 27, 2024, the
Commission issued an Order
Addressing Arguments Raised on
Rehearing And Setting Aside Prior
Order, In Part (Rehearing Order).2 The
Rehearing Order set aside the
Authorization Order, in part, regarding
the Commission’s analysis of the
cumulative air quality impacts specific
to the projects’ nitrogen dioxide (NO2)
and particles with an aerodynamic
diameter of less than or equal to 2.5
microns (PM2.5) emissions, for the
purpose of conducting additional
environmental review in light of an
opinion issued by the U.S. Court of
Appeals for the District of Columbia
Circuit.3 The Rehearing Order further
stated that these issues and other air
quality issues raised on rehearing by
Petitioners will be addressed in a future
order to be issued upon completion of
an environmental review, as described
below.
1 Venture Global CP2 LNG, LLC, 187 FERC
¶ 61,199 (2024).
2 Venture Global CP2 LNG, LLC, 189 FERC
¶ 61,148 (2024).
3 See Healthy Gulf v. FERC, 107 F.4th 1033 (D.C.
Cir. 2024).
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
96237
Schedule for Environmental Review
This notice identifies the planned
schedule for the completion of a
supplemental environmental impact
statement (SEIS) for the projects to
address the issues related to the
Commission’s analysis of the
cumulative air quality impacts specific
to the projects’ NO2 and PM2.5
emissions, as raised by Petitioners.4
This planned schedule is based on
issuance of the draft SEIS in February
2025, opening a 45-day comment
period.
Issuance of Notice of Availability of the
final SEIS—May 9, 2025
This notice identifies the
Commission’s anticipated schedule for
issuance of the final order for the
projects, which serves as the
Commission’s record of decision. We
currently anticipate issuing a final order
for the projects no later than:
Issuance of Final Order—July 24, 2025
If a schedule change becomes
necessary, additional notice will be
provided.
Projects Description
The CP2 LNG Project includes a
liquefaction plant with 20 million
metric tons per annum (MTPA) of
nameplate liquefaction capacity and a
peak achievable capacity of 28 MTPA
under optimal operating conditions
consisting of eighteen liquefaction
blocks, four aboveground full
containment LNG storage tanks, and two
marine LNG loading docks.
The CP Express Pipeline Project
involves an approximately 85.4-milelong mainline pipeline from Jasper
County, Texas, to the LNG Project in
Cameron Parish, Louisiana, an
approximately 6.0-mile-long lateral
pipeline in Calcasieu Parish, Louisiana,
and associated aboveground facilities in
Louisiana and Texas. The pipeline
project is designed to transport feed gas
to the CP2 LNG Project and will allow
CP Express to provide up to 4,400,000
dekatherms per day of firm
transportation service.
Background
On December 2, 2021, Venture Global
CP2 LNG, LLC filed a request, in Docket
No. CP22–21–000, under section 3 of
the Natural Gas Act (NGA) and Part 153
of the Commission’s regulations for
authorization to site, construct, and
operate the CP2 LNG Project, a new
4 In accordance with the Council on
Environmental Quality’s regulations, the unique
identification number for documents relating to this
environmental review is SEIS–019–20–000–
1732105621. 40 CFR 1501.5(c)(4) (2024).
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 89, Number 233 (Wednesday, December 4, 2024)]
[Notices]
[Pages 96236-96237]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-28412]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG25-46-000.
Applicants: Bocanova Power LLC.
Description: Bocanova Power LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 11/27/24.
Accession Number: 20241127-5213.
Comment Date: 5 p.m. ET 12/18/24.
Take notice that the Commission received the following Complaints
and Compliance filings in EL Dockets:
Docket Numbers: EL25-22-000.
Applicants: Advanced Energy United, American Clean Power
Association, Solar Energy Industries Association, American Clean Power
Association Solar Energy Industries Association Advanced Energy United
v. PJM Interconnection, L.L.C.
Description: Complaint of American Clean Power Association, Solar
Energy Industries Association, and Advanced Energy United v. PJM
Interconnection, L.L.C.
Filed Date: 11/26/24.
Accession Number: 20241126-5340.
Comment Date: 5 p.m. ET 12/16/24.
Docket Numbers: EL25-23-000.
Applicants: Rio Grande Electric Cooperative, Inc.
Description: Petition for Declaratory Order of Rio Grande Electric
Cooperative, Inc.
Filed Date: 11/26/24.
Accession Number: 20241126-5341.
Comment Date: 5 p.m. ET 12/17/24.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER24-2034-001.
Applicants: GridLiance Heartland LLC.
Description: Compliance filing: Gridliance Heartland Further Order
2023 Compliance Filing to be effective 9/1/2024.
Filed Date: 11/27/24.
Accession Number: 20241127-5158.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-313-001; ER25-314-001; ER25-315-001.
Applicants: South River OnSite Generation, LLC, Martinsville OnSite
Generation, LLC, Clyde Onsite Generation, LLC.
Description: Supplement to 10/31/2024, Clyde Onsite Generation, LLC
submits tariff filing Notice of Change in Status and Tariff Revisions.
Filed Date: 11/22/24.
Accession Number: 20241122-5290.
Comment Date: 5 p.m. ET 12/13/24.
Docket Numbers: ER25-346-001.
Applicants: Public Service Company of Colorado.
Description: Tariff Amendment: 2024-11-27 Att O-SPS Formula Rates--
Order 898--Errata Filing to be effective 1/1/2025.
Filed Date: 11/27/24.
Accession Number: 20241127-5151.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-580-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: WDT SA 17: November 2024
WAPA Service Agreement Biannual Filing to be effective 2/1/2025.
Filed Date: 11/27/24.
Accession Number: 20241127-5001.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-581-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: TO SA 59: November 2024 WAPA
Interconnection Agreement Biannual Filing to be effective 2/1/2025.
Filed Date: 11/27/24.
Accession Number: 20241127-5002.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-582-000.
Applicants: NextEra Energy Transmission Southwest, LLC.
Description: Sec. 205(d) Rate Filing: NextEra Energy Transmission
Southwest, LLC Depreciation Rate Revisions to be effective 2/1/2025.
Filed Date: 11/27/24.
Accession Number: 20241127-5067.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-583-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Ministerial Clean-up Filing
of Tariff, Definitions R--S to be effective 12/3/2019.
Filed Date: 11/27/24.
Accession Number: 20241127-5093.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-584-000.
Applicants: Constellation Mystic Power, LLC.
Description: Compliance filing: Compliance Filing of Tariff Records
to Implement ROE Settlement to be effective 6/1/2022.
Filed Date: 11/27/24.
Accession Number: 20241127-5136.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-586-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amended ISA, SA No. 2637;
AF1-177 to be effective 1/27/2025.
Filed Date: 11/27/24.
Accession Number: 20241127-5144.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-588-000.
Applicants: Essential Power Newington, LLC.
Description: Sec. 205(d) Rate Filing: IROL-CIP Rate Schedule to be
effective 1/27/2025.
Filed Date: 11/27/24.
Accession Number: 20241127-5166.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-589-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
[[Page 96237]]
Description: Sec. 205(d) Rate Filing: Amendment to Rate Schedule
FERC No. 57 to be effective 1/27/2025.
Filed Date: 11/27/24.
Accession Number: 20241127-5187.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-590-000.
Applicants: Pome BESS LLC.
Description: Sec. 205(d) Rate Filing: POME BESS Section 205 Filing
to be effective 12/31/9998.
Filed Date: 11/27/24.
Accession Number: 20241127-5240.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-591-000.
Applicants: Duke Energy Carolinas, LLC.
Description: Sec. 205(d) Rate Filing: DEC-CEPCI RS No. 665
Reimbursement Agmt to be effective 2/1/2025.
Filed Date: 11/27/24.
Accession Number: 20241127-5245.
Comment Date: 5 p.m. ET 12/18/24.
Docket Numbers: ER25-592-000.
Applicants: Wisconsin Power and Light Company.
Description: Initial rate filing: WPL Rate Schedule for Blackstart
Resource Services to be effective 1/27/2025.
Filed Date: 11/27/24.
Accession Number: 20241127-5255.
Comment Date: 5 p.m. ET 12/18/24.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: November 27, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-28412 Filed 12-3-24; 8:45 am]
BILLING CODE 6717-01-P