National Fuel Gas Supply Corporation; Notice of Request for Extension of Time, 95201-95202 [2024-28092]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 89, No. 231 / Monday, December 2, 2024 / Notices
Comment Date: 5 p.m. ET 12/13/24.
Docket Numbers: ER25–536–000.
Applicants: Respond Power, LLC.
Description: Compliance filing:
Revised Market-Based Rate Tariff to be
effective 11/23/2024.
Filed Date: 11/22/24.
Accession Number: 20241122–5202.
Comment Date: 5 p.m. ET 12/13/24.
Docket Numbers: ER25–537–000.
Applicants: Verde Energy USA New
York, LLC.
Description: Compliance filing:
Revised Market-Based Rate Tariff to be
effective 11/23/2024.
Filed Date: 11/22/24.
Accession Number: 20241122–5207.
Comment Date: 5 p.m. ET 12/13/24.
Docket Numbers: ER25–538–000.
Applicants: Placid Solar II, LLC.
Description: Baseline eTariff Filing:
Placid Solar II, LLC MBR Application
Filing to be effective 1/22/2025.
Filed Date: 11/22/24.
Accession Number: 20241122–5214.
Comment Date: 5 p.m. ET 12/13/24.
Docket Numbers: ER25–539–000.
Applicants: Verde Energy USA
Trading, LLC.
Description: Compliance filing:
Revised Market-Based Rate Tariff to be
effective 11/23/2024.
Filed Date: 11/22/24.
Accession Number: 20241122–5216.
Comment Date: 5 p.m. ET 12/13/24.
Docket Numbers: ER25–540–000.
Applicants: Verde Energy USA Inc.
Description: Compliance filing:
Revised Market-Based Rate Tariff to be
effective 11/23/2024.
Filed Date: 11/22/24.
Accession Number: 20241122–5218.
Comment Date: 5 p.m. ET 12/13/24.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF13–22–002.
Applicants: FRV Tucson Solar, LLC.
Description: Refund Report of Picture
Rocks Solar, LLC.
Filed Date: 11/14/24.
Accession Number: 20241114–5296.
Comment Date: 5 p.m. ET 12/5/24.
Docket Numbers: QF13–654–002;
QF13–655–002.
Applicants: Sol Orchard San Diego
23, LLC, Sol Orchard San Diego 22, LLC.
Description: Refund Report of Sol
Orchard San Diego 22, LLC, et al.
Filed Date: 11/14/24.
Accession Number: 20241114–5298.
Comment Date: 5 p.m. ET 12/5/24.
Docket Numbers: QF13–656–002;
QF13–653–002.
Applicants: Sol Orchard San Diego
21, LLC, Sol Orchard San Diego 20, LLC.
Description: Refund Report of Sol
Orchard San Diego 20, LLC, et al.
VerDate Sep<11>2014
18:25 Nov 29, 2024
Jkt 265001
Filed Date: 11/14/24.
Accession Number: 20241114–5297.
Comment Date: 5 p.m. ET 12/5/24.
Docket Numbers: QF15–719–003.
Applicants: Ewauna Solar 2, LLC.
Description: Refund Report of
Klamath Falls Solar 2 LLC.
Filed Date: 11/14/24.
Accession Number: 20241114–5294.
Comment Date: 5 p.m. ET 12/5/24.
Docket Numbers: QF19–881–002.
Applicants: Branch Street Solar
Partners LLC.
Description: Refund Report of Branch
Street Solar Partners, LLC.
Filed Date: 11/14/24.
Accession Number: 20241114–5295.
Comment Date: 5 p.m. ET 12/5/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: November 22, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–28089 Filed 11–29–24; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
95201
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–486–001]
National Fuel Gas Supply Corporation;
Notice of Request for Extension of
Time
Take notice that on November 19,
2024, National Fuel Gas Supply
Corporation (National Fuel) requested
that the Commission grant an extension
of time, until December 1, 2025, to test
Well 7451 located within the Beech Hill
Storage Field buffer boundary (Project)
located in Allegany and Steuben
Counties, New York as authorized in the
January 26, 2018 Commission Order
(Order).1 The Order required National
Fuel to complete well testing of Well
7451 within three years of the date of
the Order. The Commission
subsequently granted two extensions of
time; the current deadline for
completing the well testing is December
1, 2024.2
Currently, National Fuel has
completed withdrawals from Well 7451
and does not intend to undertake further
withdrawals from the well. National
Fuel states that it needs additional time
to complete its assessment of data
gathered from well testing which
includes analyses of associated
modeling and other data gathered over
the testing period. National Fuel
requests an extension of time to
December 1, 2025, to complete its
assessment and finalize an application
filing.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on National Fuel’s request for
an extension of time may do so. No
reply comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (NGA) (18 CFR 157.10).
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for NGA facilities
when such requests are contested before
order issuance. For those extension
1 National Fuel Gas Supply Corporation, 162
FERC ¶ 62,063 (2018).
2 National Fuel Gas Supply Corporation, Docket
No. CP17–486–000, Letter Order Granting
Extension, (December 18, 2023).
E:\FR\FM\02DEN1.SGM
02DEN1
95202
Federal Register / Vol. 89, No. 231 / Monday, December 2, 2024 / Notices
ddrumheller on DSK120RN23PROD with NOTICES1
requests that are contested,3 the
Commission will aim to issue an order
acting on the request within 45 days.4
The Commission will address all
arguments relating to whether the
applicant has demonstrated there is
good cause to grant the extension.5 The
Commission will not consider
arguments that re-litigate the issuance of
the certificate order, including whether
the Commission properly found the
project to be in the public convenience
and necessity and whether the
Commission’s environmental analysis
for the certificate complied with the
National Environmental Policy Act
(NEPA).6 At the time a pipeline requests
an extension of time, orders on
certificates of public convenience and
necessity are final and the Commission
will not re-litigate their issuance.7 The
Director of the Office of Energy Projects,
or his or her designee, will act on all of
those extension requests that are
uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
The Commission strongly encourages
electronic filings of comments in lieu of
paper using the ‘‘eFile’’ link at https://
3 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1).
4 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
5 Id. at P 40.
6 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
7 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
VerDate Sep<11>2014
18:25 Nov 29, 2024
Jkt 265001
www.ferc.gov. In lieu of electronic filing,
you may submit a paper copy which
must reference the Project docket
number.
To file via USPS: Debbie-Anne A.
Reese, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
To file via any other courier: DebbieAnne A. Reese, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Comment Date: 5:00 p.m. Eastern
Time on December 9, 2024.
Dated: November 22, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–28092 Filed 11–29–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG25–44–000.
Applicants: Northwest Ohio Wind,
LLC.
Description: Northwest Ohio Wind,
LLC submits Notice of Self-Certification
of Exempt Wholesale Generator Status.
Filed Date: 11/22/24.
Accession Number: 20241122–5240.
Comment Date: 5 p.m. ET 12/13/24.
Docket Numbers: EG25–45–000.
Applicants: Bocanova Power LLC.
Description: Bocanova Power LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 11/25/24.
Accession Number: 20241125–5169.
Comment Date: 5 p.m. ET 12/16/24.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL25–20–000.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
Applicants: Constellation Energy
Generation, LLC v. PJM Interconnection,
L.L.C.
Description: Complaint of
Constellation Energy Generation, LLC v.
PJM Interconnection, L.L.C.
Filed Date: 11/22/24.
Accession Number: 20241122–5285.
Comment Date: 5 p.m. ET 12/12/24.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–93–003.
Applicants: Consumers Energy
Company.
Description: Compliance filing:
Amended WDS SA with Michigan
Public Power Agency, Docket No. ER23–
93–to be effective 12/14/2022.
Filed Date: 11/25/24.
Accession Number: 20241125–5086.
Comment Date: 5 p.m. ET 12/16/24.
Docket Numbers: ER25–474–000.
Applicants: Blossburg Power, LLC,
Brunot Island Power, LLC, Gilbert
Power, LLC, Hamilton Power, LLC,
Hunterstown Power, LLC, Mountain
Power, LLC, New Castle Power, LLC,
Orrtanna Power, LLC, Portland Power,
LLC, Sayreville Power, LLC, Shawnee
Power, LLC, Shawville Power, LLC,
Titus Power, LLC, Tolna Power, LLC,
Warren Generation, LLC.
Description: Joint Request for Limited
Waiver of Blossburg Power, LLC, et al.
Filed Date: 11/15/24.
Accession Number: 20241115–5295.
Comment Date: 5 p.m. ET 12/6/24.
Docket Numbers: ER25–541–000.
Applicants: Big Rock ESS Assets LLC.
Description: 205(d) Rate Filing: Big
Rock ESS Asset, Certificate of
Concurrence Filing to be effective 11/
22/2024.
Filed Date: 11/22/24.
Accession Number: 20241122–5242.
Comment Date: 5 p.m. ET 12/13/24.
Docket Numbers: ER25–542–000.
Applicants: California Independent
System Operator Corporation.
Description: 205(d) Rate Filing: 2024–
11–22 Regulatory Filings Provision—
Pathways Step 1 Proposal to be effective
12/31/9998.
Filed Date: 11/22/24.
Accession Number: 20241122–5247.
Comment Date: 5 p.m. ET 12/13/24.
Docket Numbers: ER25–543–000.
Applicants: California Independent
System Operator Corporation.
Description: 205(d) Rate Filing: 2024–
11–22 SWIP-North Development
Agreement btwn Great Basin & CAISO
to be effective 11/23/2024.
Filed Date: 11/22/24.
Accession Number: 20241122–5258.
Comment Date: 5 p.m. ET 12/13/24.
E:\FR\FM\02DEN1.SGM
02DEN1
Agencies
[Federal Register Volume 89, Number 231 (Monday, December 2, 2024)]
[Notices]
[Pages 95201-95202]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-28092]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-486-001]
National Fuel Gas Supply Corporation; Notice of Request for
Extension of Time
Take notice that on November 19, 2024, National Fuel Gas Supply
Corporation (National Fuel) requested that the Commission grant an
extension of time, until December 1, 2025, to test Well 7451 located
within the Beech Hill Storage Field buffer boundary (Project) located
in Allegany and Steuben Counties, New York as authorized in the January
26, 2018 Commission Order (Order).\1\ The Order required National Fuel
to complete well testing of Well 7451 within three years of the date of
the Order. The Commission subsequently granted two extensions of time;
the current deadline for completing the well testing is December 1,
2024.\2\
---------------------------------------------------------------------------
\1\ National Fuel Gas Supply Corporation, 162 FERC ] 62,063
(2018).
\2\ National Fuel Gas Supply Corporation, Docket No. CP17-486-
000, Letter Order Granting Extension, (December 18, 2023).
---------------------------------------------------------------------------
Currently, National Fuel has completed withdrawals from Well 7451
and does not intend to undertake further withdrawals from the well.
National Fuel states that it needs additional time to complete its
assessment of data gathered from well testing which includes analyses
of associated modeling and other data gathered over the testing period.
National Fuel requests an extension of time to December 1, 2025, to
complete its assessment and finalize an application filing.
This notice establishes a 15-calendar day intervention and comment
period deadline. Any person wishing to comment on National Fuel's
request for an extension of time may do so. No reply comments or
answers will be considered. If you wish to obtain legal status by
becoming a party to the proceedings for this request, you should, on or
before the comment date stated below, file a motion to intervene in
accordance with the requirements of the Commission's Rules of Practice
and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the
Natural Gas Act (NGA) (18 CFR 157.10).
As a matter of practice, the Commission itself generally acts on
requests for extensions of time to complete construction for NGA
facilities when such requests are contested before order issuance. For
those extension
[[Page 95202]]
requests that are contested,\3\ the Commission will aim to issue an
order acting on the request within 45 days.\4\ The Commission will
address all arguments relating to whether the applicant has
demonstrated there is good cause to grant the extension.\5\ The
Commission will not consider arguments that re-litigate the issuance of
the certificate order, including whether the Commission properly found
the project to be in the public convenience and necessity and whether
the Commission's environmental analysis for the certificate complied
with the National Environmental Policy Act (NEPA).\6\ At the time a
pipeline requests an extension of time, orders on certificates of
public convenience and necessity are final and the Commission will not
re-litigate their issuance.\7\ The Director of the Office of Energy
Projects, or his or her designee, will act on all of those extension
requests that are uncontested.
---------------------------------------------------------------------------
\3\ Contested proceedings are those where an intervenor disputes
any material issue of the filing. 18 CFR 385.2201(c)(1).
\4\ Algonquin Gas Transmission, LLC, 170 FERC ] 61,144, at P 40
(2020).
\5\ Id. at P 40.
\6\ Similarly, the Commission will not re-litigate the issuance
of an NGA section 3 authorization, including whether a proposed
project is not inconsistent with the public interest and whether the
Commission's environmental analysis for the permit order complied
with NEPA.
\7\ Algonquin Gas Transmission, LLC, 170 FERC ] 61,144, at P 40
(2020).
---------------------------------------------------------------------------
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov).
From the Commission's Home Page on the internet, this information is
available on eLibrary. The full text of this document is available on
eLibrary in PDF and Microsoft Word format for viewing, printing, and/or
downloading. To access this document in eLibrary, type the docket
number excluding the last three digits of this document in the docket
number field.
User assistance is available for eLibrary and the Commission's
website during normal business hours from FERC Online Support at (202)
502-6652 (toll free at 1-866-208-3676) or email at
[email protected], or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the Public Reference Room at
[email protected].
The Commission strongly encourages electronic filings of comments
in lieu of paper using the ``eFile'' link at https://www.ferc.gov. In
lieu of electronic filing, you may submit a paper copy which must
reference the Project docket number.
To file via USPS: Debbie-Anne A. Reese, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other courier: Debbie-Anne A. Reese, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Comment Date: 5:00 p.m. Eastern Time on December 9, 2024.
Dated: November 22, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-28092 Filed 11-29-24; 8:45 am]
BILLING CODE 6717-01-P