Federal Register / Vol. 89, No. 223 / Tuesday, November 19, 2024 / Notices
250 gpm to 500 gpm, to satisfy the
increasing demand for liquefied natural
gas from the TLF and its downstream
users. The requested capacity increase
would require no construction and only
minor modifications to the existing LNG
facilities at the Terminal. Specifically,
the Project would only require LNG
sendout pressure control setpoint
adjustments at the inlet of the LNG
Supply Pipeline.
Background
On October 22, 2024, the Commission
issued a Notice of Scoping Period
Requesting Comments on
Environmental Issues for the Proposed
EcoEléctrica LNG Supply Pipeline
Capacity Project (Notice of Scoping).
The Notice of Scoping was sent to
affected landowners; Federal, State, and
local government agencies; elected
officials; environmental and public
interest groups; other interested parties;
and local libraries and newspapers. To
date, no comments have been received.
Any substantive comments received
will be addressed in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP24–490–000), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: November 13, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–26940 Filed 11–18–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meetings
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C.552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
TIME AND DATE:
November 21, 2024,
10:00 a.m.
Room 2C, 888 First Street NE,
Washington, DC 20426.
PLACE:
STATUS:
Open to the public.
Agenda.
* Note—Items listed on the agenda
may be deleted without further notice.
MATTERS TO BE CONSIDERED:
CONTACT PERSON FOR MORE INFORMATION:
Debbie-Anne A. Reese, Secretary,
Telephone (202) 502–8400.
For a recorded message listing items
Stricken from or added to the meeting,
call (202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed online at the Commission’s
website at https://elibrary.ferc.gov/
eLibrary/search using the eLibrary link.
1119TH—MEETING, OPEN
[November 21, 2024, 10:00 a.m.]
Item No.
Docket No.
Company
Administrative
A–1 ........
A–2 ........
A–3 ........
AD25–1–000 ................................................
AD25–2–000 ................................................
AD06–3–000 ................................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Market Update.
ddrumheller on DSK120RN23PROD with NOTICES1
Electric
E–1 ........
RM21–17–001 .............................................
E–2 ........
E–3 ........
RM05–5–031 ...............................................
ER24–2584–000 ..........................................
EL23–62–000 ..............................................
OMITTED.
ER24–2971–000, TS24–5–000 ...................
ER24–2016–000 ..........................................
ER24–2038–000 ..........................................
ER24–1993–000 ..........................................
ER24–2217–000 ..........................................
ER24–697–001, ER24–698–001 ................
ER14–714–003, ER18–2002–003, EL25–
6–000.
ER14–715–003, EL25–7–000 .....................
ER24–1583–001 ..........................................
ER14–199–003, EL25–11–000 ...................
E–4 ........
E–5 ........
E–6 ........
E–7 ........
E–8 ........
E–9 ........
E–10 ......
E–11 ......
E–12 ......
E–13 ......
E–14 ......
VerDate Sep<11>2014
17:42 Nov 18, 2024
Jkt 265001
PO 00000
Building for the Future Through Electric Regional Transmission Planning and Cost Allocation.
Standards for Business Practices and Communication Protocols for Public Utilities.
ISO New England Inc. and New England Power Pool Participants Committee.
ISO New England Inc.
Dan’s Mountain Wind Force, LLC.
MATL LLP.
UNS Electric, Inc.
NorthWestern Corporation.
SunZia Transmission, LLC.
Westlands Solar Blue (OZ) Owner, LLC, Castanea Project, LLC.
Essential Power Rock Springs, LLC.
Essential Power OPP, LLC.
Southwest Power Pool, Inc.
Lakewood Cogeneration, L.P.
Frm 00066
Fmt 4703
Sfmt 4703
E:\FR\FM\19NON1.SGM
19NON1
Federal Register / Vol. 89, No. 223 / Tuesday, November 19, 2024 / Notices
91379
1119TH—MEETING, OPEN—Continued
[November 21, 2024, 10:00 a.m.]
Item No.
Docket No.
Company
E–15 ......
EC24–114–000 ............................................
E–16 ......
E–17 ......
E–18 ......
ER22–1804–000 ..........................................
ER22–1804–001 ..........................................
ER24–2520–000 ..........................................
Bridgeport Energy LLC, Essential Power Massachusetts, LLC, Essential Power
Newington, LLC, Essential Power OPP, LLC, Essential Power Rock Springs, LLC,
Hamilton Liberty LLC, Hamilton Patriot LLC, Hamilton Projects Acquiror, LLC, Lakewood Cogeneration, L.P., Nautilus Power, LLC, Revere Power, LLC, Rumford Power
LLC and Tiverton Power LLC.
Yaphank Fuel Cell Park, LLC.
Yaphank Fuel Cell Park, LLC.
Southwest Power Pool, Inc.
Hydro
H–1 ........
RM24–5–000 ...............................................
H–2 ........
H–3 ........
P–15332–000 ..............................................
P–77–321 ....................................................
Establishment of Categorical Reasonable Period of Time for Action on Requests for
Water Quality Certification under Section 401(a)(1) of the Clean Water Act and Clarifying Types of Hydroelectric Project Proceedings that May Require Water Quality
Certification.
York Energy Storage LLC.
Pacific Gas and Electric Company.
Certificates
C–1 ........
C–2 ........
C–3 ........
CP24–8–000 ................................................
CP24–88–000 ..............................................
CP23–375–000 ............................................
A free webcast of this event is
available through the Commission’s
website. Anyone with Internet access
who desires to view this event can do
so by navigating to www.ferc.gov’s
Calendar of Events and locating this
event in the Calendar. The Federal
Energy Regulatory Commission provides
technical support for the free webcasts.
Please call (202) 502–8680 or email
customer@ferc.gov if you have any
questions.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters but will
not be telecast.
Issued: November 14, 2024.
Carlos D. Clay,
Acting Deputy Secretary.
[FR Doc. 2024–27141 Filed 11–15–24; 4:15 pm]
ddrumheller on DSK120RN23PROD with NOTICES1
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:42 Nov 18, 2024
Jkt 265001
Natural Gas Pipeline Company of America LLC.
Rover Pipeline LLC.
Elba Liquefaction Company, L.L.C. and Southern LNG Company, L.L.C.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP25–14–000]
ANR Pipeline Company; Notice of
Request Under Blanket Authorization
and Establishing Intervention and
Protest Deadline
Take notice that on November 4,
2024, ANR Pipeline Company (ANR),
700 Louisiana Street, Suite 1300,
Houston, Texas 77002–2700, filed in the
above referenced docket, a prior notice
request pursuant to sections 157.205
and 157.208(b) of the Commission’s
regulations under the Natural Gas Act
(NGA), and ANR’s blanket certificate
issued in Docket No. CP82–480–000, for
authorization to construct and operate
one 1,900 horsepower natural gas-fired
reciprocating compressor unit and
appurtenant facilities at ANR’s existing
Joliet Compressor Station located in
Will County, Illinois. The project will
allow ANR to increase the delivery
capability of its existing Youngs Road
interconnect with Northern Border
Pipeline Company by 75,000
Dekatherms per day. The estimated cost
for the project is $38 million, all as more
fully set forth in the request which is on
file with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
Any questions concerning this request
should be directed to David A. Alonzo,
Manager of Project Authorizations, ANR
Pipeline Company, 700 Louisiana Street
Suite 1300, Houston, Texas 77002–2700,
at (832) 320–5477, or david_alonzo@
tcenergy.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
E:\FR\FM\19NON1.SGM
19NON1
Agencies
[Federal Register Volume 89, Number 223 (Tuesday, November 19, 2024)]
[Notices]
[Pages 91378-91379]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-27141]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meetings
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5
U.S.C.552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
TIME AND DATE: November 21, 2024, 10:00 a.m.
PLACE: Room 2C, 888 First Street NE, Washington, DC 20426.
STATUS: Open to the public.
MATTERS TO BE CONSIDERED: Agenda.
* Note--Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MORE INFORMATION: Debbie-Anne A. Reese, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items Stricken from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed online at the
Commission's website at https://elibrary.ferc.gov/eLibrary/search using
the eLibrary link.
1119th--Meeting, Open
[November 21, 2024, 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1..................... AD25-1-000...................... Agency Administrative Matters.
A-2..................... AD25-2-000...................... Customer Matters, Reliability, Security and Market
Operations.
A-3..................... AD06-3-000...................... Market Update.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1..................... RM21-17-001..................... Building for the Future Through Electric Regional
Transmission Planning and Cost Allocation.
E-2..................... RM05-5-031...................... Standards for Business Practices and Communication
Protocols for Public Utilities.
E-3..................... ER24-2584-000................... ISO New England Inc. and New England Power Pool
Participants Committee.
EL23-62-000..................... ISO New England Inc.
E-4..................... OMITTED.........................
E-5..................... ER24-2971-000, TS24-5-000....... Dan's Mountain Wind Force, LLC.
E-6..................... ER24-2016-000................... MATL LLP.
E-7..................... ER24-2038-000................... UNS Electric, Inc.
E-8..................... ER24-1993-000................... NorthWestern Corporation.
E-9..................... ER24-2217-000................... SunZia Transmission, LLC.
E-10.................... ER24-697-001, ER24-698-001...... Westlands Solar Blue (OZ) Owner, LLC, Castanea
Project, LLC.
E-11.................... ER14-714-003, ER18-2002-003, Essential Power Rock Springs, LLC.
EL25-6-000.
E-12.................... ER14-715-003, EL25-7-000........ Essential Power OPP, LLC.
E-13.................... ER24-1583-001................... Southwest Power Pool, Inc.
E-14.................... ER14-199-003, EL25-11-000....... Lakewood Cogeneration, L.P.
[[Page 91379]]
E-15.................... EC24-114-000.................... Bridgeport Energy LLC, Essential Power
Massachusetts, LLC, Essential Power Newington, LLC,
Essential Power OPP, LLC, Essential Power Rock
Springs, LLC, Hamilton Liberty LLC, Hamilton
Patriot LLC, Hamilton Projects Acquiror, LLC,
Lakewood Cogeneration, L.P., Nautilus Power, LLC,
Revere Power, LLC, Rumford Power LLC and Tiverton
Power LLC.
E-16.................... ER22-1804-000................... Yaphank Fuel Cell Park, LLC.
E-17.................... ER22-1804-001................... Yaphank Fuel Cell Park, LLC.
E-18.................... ER24-2520-000................... Southwest Power Pool, Inc.
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1..................... RM24-5-000...................... Establishment of Categorical Reasonable Period of
Time for Action on Requests for Water Quality
Certification under Section 401(a)(1) of the Clean
Water Act and Clarifying Types of Hydroelectric
Project Proceedings that May Require Water Quality
Certification.
H-2..................... P-15332-000..................... York Energy Storage LLC.
H-3..................... P-77-321........................ Pacific Gas and Electric Company.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1..................... CP24-8-000...................... Natural Gas Pipeline Company of America LLC.
C-2..................... CP24-88-000..................... Rover Pipeline LLC.
C-3..................... CP23-375-000.................... Elba Liquefaction Company, L.L.C. and Southern LNG
Company, L.L.C.
----------------------------------------------------------------------------------------------------------------
A free webcast of this event is available through the Commission's
website. Anyone with Internet access who desires to view this event can
do so by navigating to www.ferc.gov's Calendar of Events and locating
this event in the Calendar. The Federal Energy Regulatory Commission
provides technical support for the free webcasts. Please call (202)
502-8680 or email [email protected] if you have any questions.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters but will not be telecast.
Issued: November 14, 2024.
Carlos D. Clay,
Acting Deputy Secretary.
[FR Doc. 2024-27141 Filed 11-15-24; 4:15 pm]