Download as PDF ddrumheller on DSK120RN23PROD with NOTICES1 91430 Federal Register / Vol. 89, No. 223 / Tuesday, November 19, 2024 / Notices collection of information is necessary for the proper performance of the functions of the Agency, including whether the information shall have practical utility; (b) the accuracy of the Agency’s estimate of the burden of the proposed collection of information; (c) ways to enhance the quality, utility, and clarity of the information on respondents, including through the use of automated collection techniques or other forms of information technology; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques or other forms of information technology. Title of Collection: DUE Project Data Form. OMB Control No.: 3145–0201. Expiration Date of Approval: January 31, 2025. Abstract: The Division of Undergraduate Education (DUE) Project Data Form is a component of all grant proposals submitted to NSF’s Division of Undergraduate Education. This form collects information needed to direct proposals to appropriate reviewers and to report the estimated collective impact of proposed projects on institutions, students, and faculty members. Requested information includes the discipline of the proposed project, collaborating organizations involved in the project, the academic level on which the project focuses (e.g., lower-level undergraduate courses, upper-level undergraduate courses), characteristics of the organization submitting the proposal, special audiences (if any) that the project would target (e.g., women, underrepresented minorities, persons with disabilities), strategic foci (if any) of the project (e.g., research on teaching and learning, international activities, integration of research and education), and the number of students and faculty at different educational levels who would benefit from the project. Respondents: Investigators who submit proposals to NSF’s Division of Undergraduate Education. Estimated Number of Annual Respondents: 2,550. Burden on the Public: 20 minutes (per response) for an annual total of 850 hours. Dated: November 14, 2024. Suzanne H. Plimpton, Reports Clearance Officer, National Science Foundation. [FR Doc. 2024–26904 Filed 11–18–24; 8:45 am] BILLING CODE 7555–01–P VerDate Sep<11>2014 17:42 Nov 18, 2024 Jkt 265001 NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–317 and 50–318; NRC– 2024–0179] Constellation Energy Generation, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Exemptions Nuclear Regulatory Commission. ACTION: Notice; issuance. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) has issued exemptions in response to a December 7, 2023, request from Constellation Energy Generation, LLC (Constellation), regarding the submittal of subsequent license renewal applications for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Pursuant to these exemptions, if the licensee submits the subsequent license renewal applications at least 3 years prior to the expiration of the existing operating licenses, and if the NRC staff finds them acceptable for docketing, the existing operating licenses will be in timely renewal under NRC regulations until the NRC has made final determinations on whether to approve the subsequent license renewal applications. DATES: The exemptions were issued on November 12, 2024. ADDRESSES: Please refer to Docket ID NRC–2024–0179 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2024–0179. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301–415–0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, at 301–415–4737, or by email to PDR.Resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. SUMMARY: PO 00000 Frm 00118 Fmt 4703 Sfmt 4703 • NRC’s PDR: The PDR, where you may examine and order copies of publicly available documents, is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1–800–397–4209 or 301–415– 4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: Brian Harris, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001; telephone: 301–415–2277; email: Brian.Harris2@nrc.gov. SUPPLEMENTARY INFORMATION: The text of the exemptions is attached. Dated: November 14, 2024. For the Nuclear Regulatory Commission. Brian Harris, Senior Project Manager, License Renewal Projects Branch, Division of New and Renewed Licenses, Office of Nuclear Reactor Regulation. Attachment—Nuclear Regulatory Commission Docket Nos. 50–317 and 50–318 Constellation Energy Generation, LLC Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Exemptions I. Background Constellation Energy Generation, LLC (Constellation, the licensee), is the holder of Renewed Facility Operating License Nos. DPR–53 and DPR–69 which authorize operation of the Calvert Cliffs Nuclear Power Plant (Calvert), Units 1 and 2. These units are pressurized-water reactors located in Calvert County, Maryland. The operating licenses provide, among other things, that the facility is subject to all rules, regulations, and orders of the U.S. Nuclear Regulatory Commission (NRC, Commission) now or hereafter in effect. The current operating licenses for Calvert, Units 1 and 2, expire on July 31, 2034, and August 13, 2036, respectively. II. Request/Action By letter dated December 7, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23341A188), Constellation requested exemptions from 10 CFR 2.109(b), which provides that if a nuclear power plant licensee files a sufficient license renewal application ‘‘at least 5 years before the expiration of the existing license, the existing license will not be deemed to have expired until the application has been finally determined.’’ Specifically, E:\FR\FM\19NON1.SGM 19NON1 Federal Register / Vol. 89, No. 223 / Tuesday, November 19, 2024 / Notices Constellation requested timely renewal protection under 10 CFR 2.109(b) if it submits subsequent license renewal applications (SLRAs) for Calvert, Units 1 and 2, at least 3 years prior to the expiration of the existing licenses. In its December 7, 2023, letter, the licensee stated that three special circumstances apply to its exemption requests. The three special circumstances that Constellation included in its requests are: (1) Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule; (2) Compliance would result in undue hardship or other costs that are significantly in excess of those contemplated when the regulation was adopted, or that are significantly in excess of those incurred by others similarly situated; and (3) There is present any other material circumstance not considered when the regulation was adopted for which it would be in the public interest to grant an exemption. III. Discussion Under 10 CFR 54.17(a), the NRC requires that the filing of an application for a renewed license be in accordance with, among other regulations, 10 CFR 2.109(b). As provided in 10 CFR 54.15, exemptions from the requirements of 10 CFR part 54 may be granted by the Commission in accordance with 10 CFR 50.12. Pursuant to 10 CFR 50.12, the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR part 50 when (1) the exemptions are authorized by law, will not present an undue risk to public health or safety, and are consistent with the common defense and security; and (2) special circumstances are present, as defined in 10 CFR 50.12(a)(2). ddrumheller on DSK120RN23PROD with NOTICES1 A. The Exemptions Are Authorized by Law These exemptions would allow Constellation to receive timely renewal protection under 10 CFR 2.109(b) if it submits sufficient SLRAs for Calvert at least 3 years prior to the expiration of its existing licenses. This means that if the licensee submits an SLRA by July 31, 2031, for Calvert, Unit 1, and by August 13, 2033, for Calvert, Unit 2, and the staff finds them acceptable for docketing, the existing licenses for Calvert will not be deemed to have expired until the NRC has made final determinations on whether to approve the SLRAs. The staff has determined VerDate Sep<11>2014 17:42 Nov 18, 2024 Jkt 265001 that granting these exemptions are authorized by law. Section 103(c) of the Atomic Energy Act of 1954, as amended, permits the Commission to issue operating licenses, including renewed licenses. 10 CFR 2.109 implements section 9(b) of the Administrative Procedure Act (APA), 5 U.S.C. 558(c), which states: When the licensee has made timely and sufficient application for a renewal or a new license in accordance with agency rules, a license with reference to an activity of a continuing nature does not expire until the application has been finally determined by the agency. The 5-year time period specified in 10 CFR 2.109(b) is not required by the Atomic Energy Act of 1954, as amended, or the APA. It is the result of a discretionary agency rulemaking under sections 161 and 181 of the Atomic Energy Act of 1954, as amended (56 FR 64943; December 13, 1991) that was designed to provide the NRC with a reasonable amount of time to review a license renewal application and decide whether to approve it. Prior to 1992, the rules provided that licensees would have received timely renewal protection when they submitted their license renewal applications 30 days before the expiration of the current license (56 FR 64962; December 13, 1991). In 1990, the NRC proposed modifying 10 CFR 2.109 to provide that applications must be submitted 3 years before expiration of the current license to be afforded timely renewal protection (55 FR 29058; July 17, 1990). There is nothing in the preamble supporting the proposed rule or final rule revising 10 CFR 2.109(b) that suggests that applying the timely renewal doctrine to license renewal applications submitted 30 days before the expiration of the license was not authorized by law. Instead, it appears the Commission proposed to revise 10 CFR 2.109(b) from 30 days to 3 years before the expiration of the license so that the final determination on a license renewal application would typically be made before the current operating license expired. In the proposed rule, the Commission explained that it did not believe 30 days would provide ‘‘a reasonable time to review an application for a renewed operating license’’ and estimated that the technical review of a license renewal application would take approximately 2 years (55 FR 29051; July 17, 1990). In the final rule, the Commission stated that the technical review of the application would take approximately 2 years due to the review of ‘‘many complex technical issues’’ and that ‘‘[a]ny necessary hearing could likely add an additional year or more’’ PO 00000 Frm 00119 Fmt 4703 Sfmt 4703 91431 (56 FR 64962; December 13, 1991). Ultimately, the Commission concluded in the final rule that timely renewal protection would be provided for license renewal applications filed 5 years before the operating license expired to promote consistency with the requirement that licensees submit decommissioning plans and related financial assurance information on or about 5 years prior to the expiration of their current operating license. Thus, in promulgating 10 CFR 2.109(b), the Commission considered that the time period needed to reach a final determination may be less than 5 years in some cases, but the rule also provides timely renewal protection for timelyfiled applications to account for situations where the resolution of complex technical issues may take more time. The exemptions constitute a change to the schedule by which the licensee must submit its SLRAs and are administrative in nature; they do not involve any change to the current operating licenses. Under 10 CFR 54.17(a), an application for a renewed license must be filed in accordance with subpart A of 10 CFR part 2, which includes 10 CFR 2.109(b). However, the NRC may grant exemptions from the requirements of 10 CFR part 54 pursuant to 10 CFR 54.15. For the reasons stated above, the NRC has determined that granting these exemptions will not result in a violation of the Atomic Energy Act of 1954, as amended, the APA, or the NRC’s regulations. Therefore, the exemptions are authorized by law. B. The Exemptions Present No Undue Risk to Public Health and Safety The requested exemptions to allow a 3-year time period, rather than the 5 years specified in 10 CFR 2.109(b), for Constellation to submit sufficient SLRAs and receive timely renewal protection are scheduling changes. The actions do not change the manner in which Calvert operates and maintains public health and safety because the exemptions from 10 CFR 2.109(b) do not result in a change to the facility or the current operating licenses. The NRC expects that a period of 3 years provides sufficient time for the NRC to perform a full and adequate safety and environmental review, and for the completion of the hearing process. Pending final action on the SLRAs, the NRC will continue to conduct all regulatory activities associated with licensing, inspection, and oversight, and will take whatever action may be necessary to ensure adequate protection of the public health and safety. The existence of these exemptions does not E:\FR\FM\19NON1.SGM 19NON1 91432 Federal Register / Vol. 89, No. 223 / Tuesday, November 19, 2024 / Notices affect NRC’s authority, applicable to all licenses, to modify, suspend, or revoke a license for cause, such as a serious safety concern. Based on the above, the NRC finds that the exemptions do not cause undue risk to public health and safety. ddrumheller on DSK120RN23PROD with NOTICES1 C. The Exemptions Are Consistent With the Common Defense and Security The requested exemptions are scheduling changes that do not alter the design, function, or operation of any structures or plant equipment that are necessary to maintain safe and secure status of any site security matters. Therefore, the NRC finds that the actions are consistent with the common defense and security. D. Special Circumstances The Commission will not consider granting a specific exemption from the requirements in 10 CFR part 50 unless special circumstances are present. For the following reasons, the NRC finds that the special circumstances of 10 CFR 50.12(a)(2)(ii) are present for Calvert, Units 1 and 2. That is, application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule. The purpose of 10 CFR 2.109(b), as it is applied to nuclear power reactors licensed by the NRC, is to implement the ‘‘timely renewal’’ provision of section 9(b) of the APA, 5 U.S.C. 558(c). The underlying purpose of this ‘‘timely renewal’’ provision in the APA is to protect a licensee who is engaged in an ongoing licensed activity and who has complied with agency rules in applying for a renewed or new license from facing license expiration as the result of delays in the administrative process. On December 13, 1991, the NRC published the final license renewal rule, 10 CFR part 54, with associated changes to 10 CFR parts 2, 50, and 140, in the Federal Register (56 FR 64943; December 13, 1991). The preamble discussed the basis for establishing the latest date for filing license renewal applications for the purposes of the timely renewal doctrine (56 FR 64962; December 13, 1991). As discussed in Section III.A of this issuance, the NRC originally estimated that approximately 3 years would be a reasonable amount of time to review a license renewal application and to complete any hearing that might be held on the application. The NRC changed its original deadline from 3 years to 5 years to have consistent deadlines for when licensees must submit their decommissioning plans and related financial assurance VerDate Sep<11>2014 17:42 Nov 18, 2024 Jkt 265001 information and when they must submit their license renewal application to receive timely renewal protection. Accordingly, application of the 5-year period in 10 CFR 2.109(b) is not necessary to achieve the underlying purpose of the timely renewal provision in the regulation if Constellation files sufficient SLRAs at least 3 years prior to expiration of the Calvert licenses. The NRC’s current schedule for review of SLRAs is to complete its review and make a decision on issuing the renewed license within 18 months of acceptance if there is no hearing. If a hearing is held, the NRC’s model schedule anticipates completion of the NRC’s review, the hearing process, and issuance of a decision on the license renewal application within 30 months of receipt. However, it is recognized that the estimate of 30 months for completion of a contested hearing is subject to variation in any given proceeding. A period of 3 years (36 months), nevertheless, is expected to provide sufficient time for performance of a full and adequate safety and environmental review, and completion of the hearing process. Meeting this schedule is based on a sufficient application being submitted and on the review being completed in accordance with the NRC’s established license renewal review schedule. Based on the above, the NRC finds that the special circumstance of 10 CFR 50.12(a)(2)(ii) is present in the particular circumstances of Calvert, Units 1 and 2. Because the NRC staff finds that special circumstances exist under 10 CFR 50.12(a)(2)(ii), the NRC staff did not consider whether special circumstances also exist under 10 CFR 50.12(a)(2)(iii) or 10 CFR 50.12(a)(2)(vi), as presented by the licensee in its exemption requests. E. Environmental Considerations The NRC has determined that the issuance of the requested exemptions meets the provisions of categorical exclusion specified in 10 CFR 51.22(c)(25). Under 10 CFR 51.22(c)(25), the granting of an exemption from the requirements of any regulation of Title 10, Chapter 1 of the Code of Federal Regulations qualifies as a categorical exclusion if (i) there is no significant hazards consideration; (ii) there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (iii) there is no significant increase in individual or cumulative public or occupational radiation exposure; (iv) there is no significant construction impact; (v) there is no PO 00000 Frm 00120 Fmt 4703 Sfmt 4703 significant increase in the potential for or consequences from radiological accidents; and (vi) the requirements from which an exemption is sought involve one of several matters, which includes scheduling requirements under 10 CFR 51.22(c)(25)(vi)(G). The basis for NRC’s determination is provided in the following evaluation of the requirements in 10 CFR 51.22(c)(25)(i)– (vi). Requirements in 10 CFR 51.22(c)(25)(i) To qualify for a categorical exclusion under 10 CFR 51.22(c)(25)(i), the exemption must involve a no significant hazards consideration. The criteria for making a no significant hazards consideration determination are found in 10 CFR 50.92(c). The NRC has determined that the granting of the exemption requests involves no significant hazards consideration because allowing the submittal of the SLRAs at least 3 years before the expiration of the existing licenses while maintaining the protection of the timely renewal provision in 10 CFR 2.109(b) does not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. Therefore, the requirements of 10 CFR 51.22(c)(25)(i) are met. Requirements in 10 CFR 51.22(c)(25)(ii) and (iii) The exemptions constitute a change to the schedule by which Constellation must submit its SLRAs and still place the licenses in timely renewal, which is administrative in nature, and does not involve any change in the types or significant increase in the amounts of effluents that may be released offsite and does not contribute to any significant increase in occupational or public radiation exposure. Therefore, the requirements of 10 CFR 51.22(c)(25)(ii) and (iii) are met. Requirements in 10 CFR 51.22(c)(25)(iv) The exempted regulation is not associated with construction, and the exemptions do not propose any changes to the site, alter the site, or change the operation of the site. Therefore, the requirements of 10 CFR 51.22(c)(25)(iv) are met because there is no significant construction impact. Requirements in 10 CFR 51.22(c)(25)(v) The exemptions constitute changes to the schedule by which Constellation must submit its SLRAs and still place E:\FR\FM\19NON1.SGM 19NON1 Federal Register / Vol. 89, No. 223 / Tuesday, November 19, 2024 / Notices the licenses in timely renewal, which is administrative in nature, and does not impact the probability or consequences of accidents. Thus, there is no significant increase in the potential for, or consequences of, a radiological accident. Therefore, the requirements of 10 CFR 51.22(c)(25)(v) are met. Requirements in 10 CFR 51.22(c)(25)(vi) To qualify for a categorical exclusion under 10 CFR 51.22(c)(25)(vi)(G), the exemption must involve scheduling requirements. The exemptions involve scheduling requirements because they would allow Constellation to submit SLRAs for Calvert, Units 1 and 2, at least 3 years prior to the expiration of the existing licenses, rather than the 5 years specified in 10 CFR 2.109(b), and still place the licenses in timely renewal under 10 CFR 2.109(b). Therefore, the requirements of 10 CFR 51.22(c)(25)(vi) are met. Based on the above, the NRC concludes that the proposed exemptions meet the eligibility criteria for a categorical exclusion set forth in 10 CFR 51.22(c)(25). Therefore, pursuant to 10 CFR 51.22(b), no environmental assessment or environmental impact statement need be prepared in connection with the approval of these exemption requests. ddrumheller on DSK120RN23PROD with NOTICES1 IV. Conclusions Accordingly, the NRC has determined that, pursuant to 10 CFR 54.15 and 10 CFR 50.12, the requested exemptions are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. Also, special circumstances, as defined in 10 CFR 50.12(a)(2)(ii), are present. Therefore, the NRC hereby grants the licensee a one-time exemption for each Unit such that if the licensee submits SLRAs for Calvert, Units 1 and 2, at least 3 years prior to the expiration of each of the existing operating licenses, and if the NRC staff finds them acceptable for docketing, the existing operating licenses will be in timely renewal under NRC regulations until the NRC has made final determinations on whether to approve the SLRAs. These exemptions are effective upon issuance. Dated: November 12, 2024. For the Nuclear Regulatory Commission. /RA/ Michelle Sampson, Director, Division of New and Renewed Licenses, Office of Nuclear Reactor Regulation. [FR Doc. 2024–26920 Filed 11–18–24; 8:45 am] BILLING CODE 7590–01–P VerDate Sep<11>2014 17:42 Nov 18, 2024 Jkt 265001 NUCLEAR REGULATORY COMMISSION [Docket No. 50–333; NRC–2024–0178] Constellation Energy Generation, LLC; James A. FitzPatrick Nuclear Power Plant; Exemption Nuclear Regulatory Commission. ACTION: Notice; issuance. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption in response to a December 7, 2023, request from Constellation Energy Generation, LLC (Constellation), regarding the submittal of a subsequent license renewal application for James A. FitzPatrick Nuclear Power Plant. Pursuant to this exemption, if the licensee submits a subsequent license renewal application at least 3 years prior to the expiration of the existing operating license, and if the NRC staff finds it acceptable for docketing, the existing operating license will be in timely renewal under NRC regulations until the NRC has made a final determination on whether to approve the subsequent license renewal application. SUMMARY: The exemption was issued on November 12, 2024. ADDRESSES: Please refer to Docket ID NRC–2024–0178 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2024–0178. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301–415–0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, at 301–415–4737, or by email to PDR.Resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. DATES: PO 00000 Frm 00121 Fmt 4703 Sfmt 4703 91433 • NRC’s PDR: The PDR, where you may examine and order copies of publicly available documents, is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1–800–397–4209 or 301–415– 4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: Brian Harris, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001; telephone: 301–415–2277; email: Brian.Harris2@nrc.gov. SUPPLEMENTARY INFORMATION: The text of the exemption is attached. Dated: November 14, 2024. For the Nuclear Regulatory Commission. Brian Harris, Senior Project Manager, License Renewal Projects Branch, Division of New and Renewed Licenses, Office of Nuclear Reactor Regulation. Attachment—Nuclear Regulatory Commission Docket No. 50–333 Constellation Energy Generation, LLC James A. FitzPatrick Nuclear Power Plant Exemption I. Background Constellation Energy Generation, LLC (Constellation, the licensee), is the holder of Renewed Facility Operating License No. DPR–59 which authorizes operation of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). This unit is a boiling-water reactor located in Oswego County, New York. The operating license provides, among other things, that the facility is subject to all rules, regulations, and orders of the U.S. Nuclear Regulatory Commission (NRC, Commission) now or hereafter in effect. The current operating license for FitzPatrick expires on October 17, 2034. II. Request/Action By letter dated December 7, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23341A189), Constellation requested an exemption from 10 CFR 2.109(b), which provides that if a nuclear power plant licensee files a sufficient license renewal application ‘‘at least 5 years before the expiration of the existing license, the existing license will not be deemed to have expired until the application has been finally determined.’’ Specifically, Constellation requested timely renewal protection under 10 CFR 2.109(b) if it E:\FR\FM\19NON1.SGM 19NON1

Agencies

[Federal Register Volume 89, Number 223 (Tuesday, November 19, 2024)]
[Notices]
[Pages 91430-91433]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-26920]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-317 and 50-318; NRC-2024-0179]


Constellation Energy Generation, LLC; Calvert Cliffs Nuclear 
Power Plant, Units 1 and 2; Exemptions

AGENCY: Nuclear Regulatory Commission.

ACTION: Notice; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has issued 
exemptions in response to a December 7, 2023, request from 
Constellation Energy Generation, LLC (Constellation), regarding the 
submittal of subsequent license renewal applications for Calvert Cliffs 
Nuclear Power Plant, Units 1 and 2. Pursuant to these exemptions, if 
the licensee submits the subsequent license renewal applications at 
least 3 years prior to the expiration of the existing operating 
licenses, and if the NRC staff finds them acceptable for docketing, the 
existing operating licenses will be in timely renewal under NRC 
regulations until the NRC has made final determinations on whether to 
approve the subsequent license renewal applications.

DATES: The exemptions were issued on November 12, 2024.

ADDRESSES: Please refer to Docket ID NRC-2024-0179 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2024-0179. Address 
questions about Docket IDs in Regulations.gov to Stacy Schumann; 
telephone: 301-415-0624; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737, 
or by email to [email protected]. The ADAMS accession number for 
each document referenced (if it is available in ADAMS) is provided the 
first time that it is mentioned in this document.
     NRC's PDR: The PDR, where you may examine and order copies 
of publicly available documents, is open by appointment. To make an 
appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except 
Federal holidays.

FOR FURTHER INFORMATION CONTACT: Brian Harris, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2277; email: [email protected].

SUPPLEMENTARY INFORMATION: The text of the exemptions is attached.

    Dated: November 14, 2024.

    For the Nuclear Regulatory Commission.
Brian Harris,
Senior Project Manager, License Renewal Projects Branch, Division of 
New and Renewed Licenses, Office of Nuclear Reactor Regulation.

Attachment--Nuclear Regulatory Commission

Docket Nos. 50-317 and 50-318

Constellation Energy Generation, LLC

Calvert Cliffs Nuclear Power Plant, Units 1 and 2

Exemptions

I. Background

    Constellation Energy Generation, LLC (Constellation, the licensee), 
is the holder of Renewed Facility Operating License Nos. DPR-53 and 
DPR-69 which authorize operation of the Calvert Cliffs Nuclear Power 
Plant (Calvert), Units 1 and 2. These units are pressurized-water 
reactors located in Calvert County, Maryland. The operating licenses 
provide, among other things, that the facility is subject to all rules, 
regulations, and orders of the U.S. Nuclear Regulatory Commission (NRC, 
Commission) now or hereafter in effect. The current operating licenses 
for Calvert, Units 1 and 2, expire on July 31, 2034, and August 13, 
2036, respectively.

II. Request/Action

    By letter dated December 7, 2023 (Agencywide Documents Access and 
Management System (ADAMS) Accession No. ML23341A188), Constellation 
requested exemptions from 10 CFR 2.109(b), which provides that if a 
nuclear power plant licensee files a sufficient license renewal 
application ``at least 5 years before the expiration of the existing 
license, the existing license will not be deemed to have expired until 
the application has been finally determined.'' Specifically,

[[Page 91431]]

Constellation requested timely renewal protection under 10 CFR 2.109(b) 
if it submits subsequent license renewal applications (SLRAs) for 
Calvert, Units 1 and 2, at least 3 years prior to the expiration of the 
existing licenses.
    In its December 7, 2023, letter, the licensee stated that three 
special circumstances apply to its exemption requests. The three 
special circumstances that Constellation included in its requests are:
    (1) Application of the regulation in the particular circumstances 
would not serve the underlying purpose of the rule or is not necessary 
to achieve the underlying purpose of the rule;
    (2) Compliance would result in undue hardship or other costs that 
are significantly in excess of those contemplated when the regulation 
was adopted, or that are significantly in excess of those incurred by 
others similarly situated; and
    (3) There is present any other material circumstance not considered 
when the regulation was adopted for which it would be in the public 
interest to grant an exemption.

III. Discussion

    Under 10 CFR 54.17(a), the NRC requires that the filing of an 
application for a renewed license be in accordance with, among other 
regulations, 10 CFR 2.109(b). As provided in 10 CFR 54.15, exemptions 
from the requirements of 10 CFR part 54 may be granted by the 
Commission in accordance with 10 CFR 50.12. Pursuant to 10 CFR 50.12, 
the Commission may, upon application by any interested person or upon 
its own initiative, grant exemptions from the requirements of 10 CFR 
part 50 when (1) the exemptions are authorized by law, will not present 
an undue risk to public health or safety, and are consistent with the 
common defense and security; and (2) special circumstances are present, 
as defined in 10 CFR 50.12(a)(2).

A. The Exemptions Are Authorized by Law

    These exemptions would allow Constellation to receive timely 
renewal protection under 10 CFR 2.109(b) if it submits sufficient SLRAs 
for Calvert at least 3 years prior to the expiration of its existing 
licenses. This means that if the licensee submits an SLRA by July 31, 
2031, for Calvert, Unit 1, and by August 13, 2033, for Calvert, Unit 2, 
and the staff finds them acceptable for docketing, the existing 
licenses for Calvert will not be deemed to have expired until the NRC 
has made final determinations on whether to approve the SLRAs. The 
staff has determined that granting these exemptions are authorized by 
law.
    Section 103(c) of the Atomic Energy Act of 1954, as amended, 
permits the Commission to issue operating licenses, including renewed 
licenses. 10 CFR 2.109 implements section 9(b) of the Administrative 
Procedure Act (APA), 5 U.S.C. 558(c), which states:

    When the licensee has made timely and sufficient application for 
a renewal or a new license in accordance with agency rules, a 
license with reference to an activity of a continuing nature does 
not expire until the application has been finally determined by the 
agency.

    The 5-year time period specified in 10 CFR 2.109(b) is not required 
by the Atomic Energy Act of 1954, as amended, or the APA. It is the 
result of a discretionary agency rulemaking under sections 161 and 181 
of the Atomic Energy Act of 1954, as amended (56 FR 64943; December 13, 
1991) that was designed to provide the NRC with a reasonable amount of 
time to review a license renewal application and decide whether to 
approve it. Prior to 1992, the rules provided that licensees would have 
received timely renewal protection when they submitted their license 
renewal applications 30 days before the expiration of the current 
license (56 FR 64962; December 13, 1991). In 1990, the NRC proposed 
modifying 10 CFR 2.109 to provide that applications must be submitted 3 
years before expiration of the current license to be afforded timely 
renewal protection (55 FR 29058; July 17, 1990). There is nothing in 
the preamble supporting the proposed rule or final rule revising 10 CFR 
2.109(b) that suggests that applying the timely renewal doctrine to 
license renewal applications submitted 30 days before the expiration of 
the license was not authorized by law. Instead, it appears the 
Commission proposed to revise 10 CFR 2.109(b) from 30 days to 3 years 
before the expiration of the license so that the final determination on 
a license renewal application would typically be made before the 
current operating license expired. In the proposed rule, the Commission 
explained that it did not believe 30 days would provide ``a reasonable 
time to review an application for a renewed operating license'' and 
estimated that the technical review of a license renewal application 
would take approximately 2 years (55 FR 29051; July 17, 1990). In the 
final rule, the Commission stated that the technical review of the 
application would take approximately 2 years due to the review of 
``many complex technical issues'' and that ``[a]ny necessary hearing 
could likely add an additional year or more'' (56 FR 64962; December 
13, 1991). Ultimately, the Commission concluded in the final rule that 
timely renewal protection would be provided for license renewal 
applications filed 5 years before the operating license expired to 
promote consistency with the requirement that licensees submit 
decommissioning plans and related financial assurance information on or 
about 5 years prior to the expiration of their current operating 
license. Thus, in promulgating 10 CFR 2.109(b), the Commission 
considered that the time period needed to reach a final determination 
may be less than 5 years in some cases, but the rule also provides 
timely renewal protection for timely-filed applications to account for 
situations where the resolution of complex technical issues may take 
more time.
    The exemptions constitute a change to the schedule by which the 
licensee must submit its SLRAs and are administrative in nature; they 
do not involve any change to the current operating licenses. Under 10 
CFR 54.17(a), an application for a renewed license must be filed in 
accordance with subpart A of 10 CFR part 2, which includes 10 CFR 
2.109(b). However, the NRC may grant exemptions from the requirements 
of 10 CFR part 54 pursuant to 10 CFR 54.15. For the reasons stated 
above, the NRC has determined that granting these exemptions will not 
result in a violation of the Atomic Energy Act of 1954, as amended, the 
APA, or the NRC's regulations. Therefore, the exemptions are authorized 
by law.

B. The Exemptions Present No Undue Risk to Public Health and Safety

    The requested exemptions to allow a 3-year time period, rather than 
the 5 years specified in 10 CFR 2.109(b), for Constellation to submit 
sufficient SLRAs and receive timely renewal protection are scheduling 
changes. The actions do not change the manner in which Calvert operates 
and maintains public health and safety because the exemptions from 10 
CFR 2.109(b) do not result in a change to the facility or the current 
operating licenses. The NRC expects that a period of 3 years provides 
sufficient time for the NRC to perform a full and adequate safety and 
environmental review, and for the completion of the hearing process. 
Pending final action on the SLRAs, the NRC will continue to conduct all 
regulatory activities associated with licensing, inspection, and 
oversight, and will take whatever action may be necessary to ensure 
adequate protection of the public health and safety. The existence of 
these exemptions does not

[[Page 91432]]

affect NRC's authority, applicable to all licenses, to modify, suspend, 
or revoke a license for cause, such as a serious safety concern. Based 
on the above, the NRC finds that the exemptions do not cause undue risk 
to public health and safety.

C. The Exemptions Are Consistent With the Common Defense and Security

    The requested exemptions are scheduling changes that do not alter 
the design, function, or operation of any structures or plant equipment 
that are necessary to maintain safe and secure status of any site 
security matters. Therefore, the NRC finds that the actions are 
consistent with the common defense and security.

D. Special Circumstances

    The Commission will not consider granting a specific exemption from 
the requirements in 10 CFR part 50 unless special circumstances are 
present. For the following reasons, the NRC finds that the special 
circumstances of 10 CFR 50.12(a)(2)(ii) are present for Calvert, Units 
1 and 2. That is, application of the regulation in the particular 
circumstances would not serve the underlying purpose of the rule or is 
not necessary to achieve the underlying purpose of the rule.
    The purpose of 10 CFR 2.109(b), as it is applied to nuclear power 
reactors licensed by the NRC, is to implement the ``timely renewal'' 
provision of section 9(b) of the APA, 5 U.S.C. 558(c). The underlying 
purpose of this ``timely renewal'' provision in the APA is to protect a 
licensee who is engaged in an ongoing licensed activity and who has 
complied with agency rules in applying for a renewed or new license 
from facing license expiration as the result of delays in the 
administrative process.
    On December 13, 1991, the NRC published the final license renewal 
rule, 10 CFR part 54, with associated changes to 10 CFR parts 2, 50, 
and 140, in the Federal Register (56 FR 64943; December 13, 1991). The 
preamble discussed the basis for establishing the latest date for 
filing license renewal applications for the purposes of the timely 
renewal doctrine (56 FR 64962; December 13, 1991). As discussed in 
Section III.A of this issuance, the NRC originally estimated that 
approximately 3 years would be a reasonable amount of time to review a 
license renewal application and to complete any hearing that might be 
held on the application. The NRC changed its original deadline from 3 
years to 5 years to have consistent deadlines for when licensees must 
submit their decommissioning plans and related financial assurance 
information and when they must submit their license renewal application 
to receive timely renewal protection.
    Accordingly, application of the 5-year period in 10 CFR 2.109(b) is 
not necessary to achieve the underlying purpose of the timely renewal 
provision in the regulation if Constellation files sufficient SLRAs at 
least 3 years prior to expiration of the Calvert licenses. The NRC's 
current schedule for review of SLRAs is to complete its review and make 
a decision on issuing the renewed license within 18 months of 
acceptance if there is no hearing. If a hearing is held, the NRC's 
model schedule anticipates completion of the NRC's review, the hearing 
process, and issuance of a decision on the license renewal application 
within 30 months of receipt.
    However, it is recognized that the estimate of 30 months for 
completion of a contested hearing is subject to variation in any given 
proceeding. A period of 3 years (36 months), nevertheless, is expected 
to provide sufficient time for performance of a full and adequate 
safety and environmental review, and completion of the hearing process. 
Meeting this schedule is based on a sufficient application being 
submitted and on the review being completed in accordance with the 
NRC's established license renewal review schedule.
    Based on the above, the NRC finds that the special circumstance of 
10 CFR 50.12(a)(2)(ii) is present in the particular circumstances of 
Calvert, Units 1 and 2. Because the NRC staff finds that special 
circumstances exist under 10 CFR 50.12(a)(2)(ii), the NRC staff did not 
consider whether special circumstances also exist under 10 CFR 
50.12(a)(2)(iii) or 10 CFR 50.12(a)(2)(vi), as presented by the 
licensee in its exemption requests.

E. Environmental Considerations

    The NRC has determined that the issuance of the requested 
exemptions meets the provisions of categorical exclusion specified in 
10 CFR 51.22(c)(25). Under 10 CFR 51.22(c)(25), the granting of an 
exemption from the requirements of any regulation of Title 10, Chapter 
1 of the Code of Federal Regulations qualifies as a categorical 
exclusion if (i) there is no significant hazards consideration; (ii) 
there is no significant change in the types or significant increase in 
the amounts of any effluents that may be released offsite; (iii) there 
is no significant increase in individual or cumulative public or 
occupational radiation exposure; (iv) there is no significant 
construction impact; (v) there is no significant increase in the 
potential for or consequences from radiological accidents; and (vi) the 
requirements from which an exemption is sought involve one of several 
matters, which includes scheduling requirements under 10 CFR 
51.22(c)(25)(vi)(G). The basis for NRC's determination is provided in 
the following evaluation of the requirements in 10 CFR 51.22(c)(25)(i)-
(vi).
Requirements in 10 CFR 51.22(c)(25)(i)
    To qualify for a categorical exclusion under 10 CFR 
51.22(c)(25)(i), the exemption must involve a no significant hazards 
consideration. The criteria for making a no significant hazards 
consideration determination are found in 10 CFR 50.92(c). The NRC has 
determined that the granting of the exemption requests involves no 
significant hazards consideration because allowing the submittal of the 
SLRAs at least 3 years before the expiration of the existing licenses 
while maintaining the protection of the timely renewal provision in 10 
CFR 2.109(b) does not (1) involve a significant increase in the 
probability or consequences of an accident previously evaluated; or (2) 
create the possibility of a new or different kind of accident from any 
accident previously evaluated; or (3) involve a significant reduction 
in a margin of safety. Therefore, the requirements of 10 CFR 
51.22(c)(25)(i) are met.
Requirements in 10 CFR 51.22(c)(25)(ii) and (iii)
    The exemptions constitute a change to the schedule by which 
Constellation must submit its SLRAs and still place the licenses in 
timely renewal, which is administrative in nature, and does not involve 
any change in the types or significant increase in the amounts of 
effluents that may be released offsite and does not contribute to any 
significant increase in occupational or public radiation exposure. 
Therefore, the requirements of 10 CFR 51.22(c)(25)(ii) and (iii) are 
met.
Requirements in 10 CFR 51.22(c)(25)(iv)
    The exempted regulation is not associated with construction, and 
the exemptions do not propose any changes to the site, alter the site, 
or change the operation of the site. Therefore, the requirements of 10 
CFR 51.22(c)(25)(iv) are met because there is no significant 
construction impact.
Requirements in 10 CFR 51.22(c)(25)(v)
    The exemptions constitute changes to the schedule by which 
Constellation must submit its SLRAs and still place

[[Page 91433]]

the licenses in timely renewal, which is administrative in nature, and 
does not impact the probability or consequences of accidents. Thus, 
there is no significant increase in the potential for, or consequences 
of, a radiological accident. Therefore, the requirements of 10 CFR 
51.22(c)(25)(v) are met.
Requirements in 10 CFR 51.22(c)(25)(vi)
    To qualify for a categorical exclusion under 10 CFR 
51.22(c)(25)(vi)(G), the exemption must involve scheduling 
requirements. The exemptions involve scheduling requirements because 
they would allow Constellation to submit SLRAs for Calvert, Units 1 and 
2, at least 3 years prior to the expiration of the existing licenses, 
rather than the 5 years specified in 10 CFR 2.109(b), and still place 
the licenses in timely renewal under 10 CFR 2.109(b). Therefore, the 
requirements of 10 CFR 51.22(c)(25)(vi) are met.
    Based on the above, the NRC concludes that the proposed exemptions 
meet the eligibility criteria for a categorical exclusion set forth in 
10 CFR 51.22(c)(25). Therefore, pursuant to 10 CFR 51.22(b), no 
environmental assessment or environmental impact statement need be 
prepared in connection with the approval of these exemption requests.

IV. Conclusions

    Accordingly, the NRC has determined that, pursuant to 10 CFR 54.15 
and 10 CFR 50.12, the requested exemptions are authorized by law, will 
not present an undue risk to the public health and safety, and are 
consistent with the common defense and security. Also, special 
circumstances, as defined in 10 CFR 50.12(a)(2)(ii), are present. 
Therefore, the NRC hereby grants the licensee a one-time exemption for 
each Unit such that if the licensee submits SLRAs for Calvert, Units 1 
and 2, at least 3 years prior to the expiration of each of the existing 
operating licenses, and if the NRC staff finds them acceptable for 
docketing, the existing operating licenses will be in timely renewal 
under NRC regulations until the NRC has made final determinations on 
whether to approve the SLRAs.
    These exemptions are effective upon issuance.

    Dated: November 12, 2024.

    For the Nuclear Regulatory Commission.

/RA/

Michelle Sampson,

Director, Division of New and Renewed Licenses, Office of Nuclear 
Reactor Regulation.

[FR Doc. 2024-26920 Filed 11-18-24; 8:45 am]