Transcontinental Gas Pipe Line Company, LLC; Notice of Application and Establishing Intervention Deadline, 90686-90688 [2024-26825]

Download as PDF 90686 Federal Register / Vol. 89, No. 222 / Monday, November 18, 2024 / Notices protests on January 25, 2024. The Commission extended the closing date of the comment period by notice on February 20, 2024, and April 18, 2024. The comment period closed on June 28, 2024. On August 22, 2024, the Commission issued a notice granting late intervention to the Peskotomuhkati Nation at Skutik. The Commission received numerous comments and motions to intervene from members of the public, resource agencies, and nongovernmental organizations. The January 25, 2024, notice also invited federal, state, local, and Tribal agencies with jurisdiction and/or special expertise with respect to environmental issues affected by the proposal, to cooperate in the preparation of any environmental document. The Commission did not receive any requests to be a cooperating agency. This notice identifies Commission staff’s intention to prepare an environmental assessment (EA) for the project.1 Commission staff plans to issue an EA by June 30, 2025. Revisions to the schedule may be made as appropriate. The EA will be issued for a 30-day public comment period. All comments filed on the EA will be reviewed by staff and considered in the Commission’s final decision on the proceeding. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members, and others to access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Any questions regarding this notice may be directed to Michael Calloway at 202–502–8041 or Michael.calloway@ ferc.gov. Dated: November 12, 2024 Debbie-Anne A. Reese, Secretary. [FR Doc. 2024–26822 Filed 11–15–24; 8:45 am] lotter on DSK11XQN23PROD with NOTICES1 BILLING CODE 6717–01–P 1 In accordance with the Council on Environmental Quality’s regulations, the unique identification number for documents relating to this environmental review is EAXX–019–20–000– 1731404846. 40 CFR 1501.5(c)(4) (2024). VerDate Sep<11>2014 17:17 Nov 15, 2024 Jkt 265001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP25–10–000] Transcontinental Gas Pipe Line Company, LLC; Notice of Application and Establishing Intervention Deadline Take notice that on October 29, 2024, Transcontinental Gas Pipe Line Company, LLC (Transco), 2800 Post Oak Boulevard, Houston, Texas 77056–6106, filed an application under sections 7(c) and 7(b) of the Natural Gas Act, and Part 157 of the Commission’s regulations requesting authorization for its Southeast Supply Enhancement Project (Project) located in various counties in Virginia, North Carolina, South Carolina, Georgia, and Alabama. The Project consists of Transco replacing certain facilities and expanding its existing system to provide 1,596,900 dekatherms per day of incremental firm transportation capacity in the southeastern United States. Transco estimates the total cost of the Project to be $1,527,002,036 and proposes a negotiated incremental recourse rate under Transco’s Rate Schedule FT and Part 284(g) of the Commission’s regulations, all as more fully set forth in the application which is on file with the Commission and open for public inspection. Specifically, Transco proposes to construct and operate: (1) approximately 30.8-mile-long, 42-inchdiameter pipeline loop in Pittsylvania County, Virginia and Rockingham County, North Carolina; (2) 24.1-milelong, 30-inch-diameter pipeline loop in Guilford, Forsyth, and Davidson Counties, North Carolina; (3) additional 45,000 hp at its existing Compressor Station (CS) 165 in Pittsylvania County, Virginia; (4) additional 87,207 hp at its existing CS 155 in Davidson County, North Carolina; (5) additional 15,900 hp at its existing CS 150 in Iredell County, North Carolina; (6) additional 61,500 hp at its existing CS 145 in Cleveland Counties, North Carolina and (7) other related piping and valving modifications located in various counties in North Carolina, South Carolina, Georgia, and Alabama. Transco states that it has executed binding precedent agreements with twelve Project Shippers for 100% of the incremental firm transportation service under the Project. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 document via the internet through the Commission’s Home Page (https:// www.ferc.gov). From the Commission’s Home Page on the internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field. User assistance is available for eLibrary and the Commission’s website during normal business hours from FERC Online Support at (202) 502–6652 (toll free at 1–866–208–3676) or email at ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502– 8371, TTY (202) 502–8659. Email the Public Reference Room at public.referenceroom@ferc.gov. Any questions regarding the proposed project should be directed to Antauis Byrd, Regulatory Analyst, Transcontinental Gas Pipe Line Company, LLC, Post Office Box 1396, Houston, Texas 77251, by phone at (713) 215–3741, or by email at Outreach@williams.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify Federal and State agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all Federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Water Quality Certification Transco stated that a water quality certificate under section 401 of the Clean Water Act is required for the project from the Virginia Department of Environmental Quality, the North Carolina Department of Environmental Quality, the South Carolina Department of Health and Environmental Control, 1 18 CFR 157.9. E:\FR\FM\18NON1.SGM 18NON1 Federal Register / Vol. 89, No. 222 / Monday, November 18, 2024 / Notices the Georgia Department of Natural Resources-Environmental Division, and the Alabama Department of Environmental Management. When available, Transco should submit to the Commission a copy of the request for certification for the Commission authorization, including the date the request was submitted to the certifying agency, and either (1) a copy of the certifying agency’s decision or (2) evidence of waiver of water quality certification. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file comments on the project, you can protest the filing, and you can file a motion to intervene in the proceeding. There is no fee or cost for filing comments or intervening. The deadline for filing a motion to intervene is 5:00 p.m. Eastern Time December 3, 2024. How to file protests, motions to intervene, and comments is explained below. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202)502–6595 or OPP@ ferc.gov. Comments Any person wishing to comment on the project may do so. Comments may include statements of support or objections, to the project as a whole or specific aspects of the project. The more specific your comments, the more useful they will be. lotter on DSK11XQN23PROD with NOTICES1 Protests Pursuant to sections 157.10(a)(4) 2 and 385.211 3 of the Commission’s regulations under the NGA, any person 4 may file a protest to the application. Protests must comply with the requirements specified in section 385.2001 5 of the Commission’s regulations. A protest may also serve as a motion to intervene so long as the 2 18 CFR 157.10(a)(4). CFR 385.211. 4 Persons include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 5 18 CFR 385.2001. 3 18 VerDate Sep<11>2014 17:17 Nov 15, 2024 Jkt 265001 protestor states it also seeks to be an intervenor. To ensure that your comments or protests are timely and properly recorded, please submit your comments on or before December 3, 2024. There are three methods you can use to submit your comments or protests to the Commission. In all instances, please reference the Project docket number CP25–10–000 in your submission. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments or protests electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments or protests by mailing them to the following address below. Your written comments must reference the Project docket number (CP25–10–000). To file via USPS: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To file via any other courier: DebbieAnne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of comments (options 1 and 2 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Persons who comment on the environmental review of this project will be placed on the Commission’s environmental mailing list, and will receive notification when the environmental documents (EA or EIS) are issued for this project and will be notified of meetings associated with the Commission’s environmental review process. The Commission considers all comments received about the project in determining the appropriate action to be taken. However, the filing of a comment alone will not serve to make the filer a party to the proceeding. To become a PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 90687 party, you must intervene in the proceeding. For instructions on how to intervene, see below. Interventions Any person, which includes individuals, organizations, businesses, municipalities, and other entities,6 has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 7 and the regulations under the NGA 8 by the intervention deadline for the project, which is December 3, 2024. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. There are two ways to submit your motion to intervene. In both instances, please reference the Project docket number CP25–10–000 in your submission. (1) You may file your motion to intervene by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/ document-less-intervention.pdf; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the address below. Your motion to intervene must reference the Project docket number CP25–10–000. To file via USPS: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory 6 18 CFR 385.102(d). CFR 385.214. 8 18 CFR 157.10. 7 18 E:\FR\FM\18NON1.SGM 18NON1 90688 Federal Register / Vol. 89, No. 222 / Monday, November 18, 2024 / Notices Commission, 888 First Street NE, Washington, DC 20426 To file via any other courier: DebbieAnne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail at: Antauis Byrd, Regulatory Analyst, Transcontinental Gas Pipe Line Company, LLC, Post Office Box 1396, Houston, Texas 77251, or by email at Outreach@williams.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 9 motions to intervene are automatically granted by operation of Rule 214(c)(1).10 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.11 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. lotter on DSK11XQN23PROD with NOTICES1 Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of 9 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 10 18 CFR 385.214(c)(1). 11 18 CFR. 385.214(b)(3) and (d). VerDate Sep<11>2014 17:17 Nov 15, 2024 Jkt 265001 time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on December 3, 2024. Dated: November 12, 2024. Debbie-Anne A. Reese, Secretary. [FR Doc. 2024–26825 Filed 11–15–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1922–052] Ketchikan Public Utilities; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for a new major license to continue to operate and maintain the Beaver Falls Hydroelectric Project No. 1922. The project is located on Beaver Falls Creek in Ketchikan Gateway Borough, Alaska. Commission staff has prepared an Environmental Assessment (EA) for the project. The EA contains the staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major Federal action that would significantly affect the quality of the human environment. The Commission provides all interested persons with an opportunity to view and/or print the EA via the internet through the Commission’s Home Page (https://www.ferc.gov/), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, or at (866) 208–3676 (toll-free), or (202) 502– 8659 (TTY). You may also register online at https://ferconline.ferc.gov/ FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Any comments should be filed within 30 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://ferconline.ferc.gov/ FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// ferconline.ferc.gov/ QuickComment.aspx. For assistance, please contact FERC Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–4639–033. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595, or OPP@ ferc.gov. For further information, contact Golbahar Mirhosseini at golbahar.mirhosseini@ferc.gov. Dated: November 12, 2024. Debbie-Anne A. Reese, Secretary. [FR Doc. 2024–26824 Filed 11–15–24; 8:45 am] BILLING CODE 6717–01–P FEDERAL COMMUNICATIONS COMMISSION [OMB 3060–0261 and OMB 3060–0270; FR ID 261511] Information Collections Being Submitted for Review and Approval to Office of Management and Budget Federal Communications Commission. ACTION: Notice and request for comments. AGENCY: As part of its continuing effort to reduce paperwork burdens, as SUMMARY: E:\FR\FM\18NON1.SGM 18NON1

Agencies

[Federal Register Volume 89, Number 222 (Monday, November 18, 2024)]
[Notices]
[Pages 90686-90688]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-26825]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP25-10-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of 
Application and Establishing Intervention Deadline

    Take notice that on October 29, 2024, Transcontinental Gas Pipe 
Line Company, LLC (Transco), 2800 Post Oak Boulevard, Houston, Texas 
77056-6106, filed an application under sections 7(c) and 7(b) of the 
Natural Gas Act, and Part 157 of the Commission's regulations 
requesting authorization for its Southeast Supply Enhancement Project 
(Project) located in various counties in Virginia, North Carolina, 
South Carolina, Georgia, and Alabama. The Project consists of Transco 
replacing certain facilities and expanding its existing system to 
provide 1,596,900 dekatherms per day of incremental firm transportation 
capacity in the southeastern United States. Transco estimates the total 
cost of the Project to be $1,527,002,036 and proposes a negotiated 
incremental recourse rate under Transco's Rate Schedule FT and Part 
284(g) of the Commission's regulations, all as more fully set forth in 
the application which is on file with the Commission and open for 
public inspection.
    Specifically, Transco proposes to construct and operate: (1) 
approximately 30.8-mile-long, 42-inch-diameter pipeline loop in 
Pittsylvania County, Virginia and Rockingham County, North Carolina; 
(2) 24.1-mile-long, 30-inch-diameter pipeline loop in Guilford, 
Forsyth, and Davidson Counties, North Carolina; (3) additional 45,000 
hp at its existing Compressor Station (CS) 165 in Pittsylvania County, 
Virginia; (4) additional 87,207 hp at its existing CS 155 in Davidson 
County, North Carolina; (5) additional 15,900 hp at its existing CS 150 
in Iredell County, North Carolina; (6) additional 61,500 hp at its 
existing CS 145 in Cleveland Counties, North Carolina and (7) other 
related piping and valving modifications located in various counties in 
North Carolina, South Carolina, Georgia, and Alabama. Transco states 
that it has executed binding precedent agreements with twelve Project 
Shippers for 100% of the incremental firm transportation service under 
the Project.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov). From 
the Commission's Home Page on the internet, this information is 
available on eLibrary. The full text of this document is available on 
eLibrary in PDF and Microsoft Word format for viewing, printing, and/or 
downloading. To access this document in eLibrary, type the docket 
number excluding the last three digits of this document in the docket 
number field.
    User assistance is available for eLibrary and the Commission's 
website during normal business hours from FERC Online Support at (202) 
502-6652 (toll free at 1-866-208-3676) or email at 
[email protected], or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the Public Reference Room at 
[email protected].
    Any questions regarding the proposed project should be directed to 
Antauis Byrd, Regulatory Analyst, Transcontinental Gas Pipe Line 
Company, LLC, Post Office Box 1396, Houston, Texas 77251, by phone at 
(713) 215-3741, or by email at [email protected].
    Pursuant to section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
Federal and State agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all Federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.9.
---------------------------------------------------------------------------

Water Quality Certification

    Transco stated that a water quality certificate under section 401 
of the Clean Water Act is required for the project from the Virginia 
Department of Environmental Quality, the North Carolina Department of 
Environmental Quality, the South Carolina Department of Health and 
Environmental Control,

[[Page 90687]]

the Georgia Department of Natural Resources-Environmental Division, and 
the Alabama Department of Environmental Management. When available, 
Transco should submit to the Commission a copy of the request for 
certification for the Commission authorization, including the date the 
request was submitted to the certifying agency, and either (1) a copy 
of the certifying agency's decision or (2) evidence of waiver of water 
quality certification.

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file comments on the project, you can protest 
the filing, and you can file a motion to intervene in the proceeding. 
There is no fee or cost for filing comments or intervening. The 
deadline for filing a motion to intervene is 5:00 p.m. Eastern Time 
December 3, 2024. How to file protests, motions to intervene, and 
comments is explained below.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202)502-6595 or [email protected].

Comments

    Any person wishing to comment on the project may do so. Comments 
may include statements of support or objections, to the project as a 
whole or specific aspects of the project. The more specific your 
comments, the more useful they will be.

Protests

    Pursuant to sections 157.10(a)(4) \2\ and 385.211 \3\ of the 
Commission's regulations under the NGA, any person \4\ may file a 
protest to the application. Protests must comply with the requirements 
specified in section 385.2001 \5\ of the Commission's regulations. A 
protest may also serve as a motion to intervene so long as the 
protestor states it also seeks to be an intervenor.
---------------------------------------------------------------------------

    \2\ 18 CFR 157.10(a)(4).
    \3\ 18 CFR 385.211.
    \4\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
    \5\ 18 CFR 385.2001.
---------------------------------------------------------------------------

    To ensure that your comments or protests are timely and properly 
recorded, please submit your comments on or before December 3, 2024.
    There are three methods you can use to submit your comments or 
protests to the Commission. In all instances, please reference the 
Project docket number CP25-10-000 in your submission.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's website at www.ferc.gov 
under the link to Documents and Filings. Using eComment is an easy 
method for interested persons to submit brief, text-only comments on a 
project;
    (2) You may file your comments or protests electronically by using 
the eFiling feature, which is located on the Commission's website 
(www.ferc.gov) under the link to Documents and Filings. With eFiling, 
you can provide comments in a variety of formats by attaching them as a 
file with your submission. New eFiling users must first create an 
account by clicking on ``eRegister.'' You will be asked to select the 
type of filing you are making; first select ``General'' and then select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments or protests by 
mailing them to the following address below. Your written comments must 
reference the Project docket number (CP25-10-000).

To file via USPS: Debbie-Anne A. Reese, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other courier: Debbie-Anne A. Reese, Secretary, Federal 
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 
20852

    The Commission encourages electronic filing of comments (options 1 
and 2 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected].
    Persons who comment on the environmental review of this project 
will be placed on the Commission's environmental mailing list, and will 
receive notification when the environmental documents (EA or EIS) are 
issued for this project and will be notified of meetings associated 
with the Commission's environmental review process.
    The Commission considers all comments received about the project in 
determining the appropriate action to be taken. However, the filing of 
a comment alone will not serve to make the filer a party to the 
proceeding. To become a party, you must intervene in the proceeding. 
For instructions on how to intervene, see below.

Interventions

    Any person, which includes individuals, organizations, businesses, 
municipalities, and other entities,\6\ has the option to file a motion 
to intervene in this proceeding. Only intervenors have the right to 
request rehearing of Commission orders issued in this proceeding and to 
subsequently challenge the Commission's orders in the U.S. Circuit 
Courts of Appeal.
---------------------------------------------------------------------------

    \6\ 18 CFR 385.102(d).
---------------------------------------------------------------------------

    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \7\ and the regulations under the NGA \8\ by the 
intervention deadline for the project, which is December 3, 2024. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \7\ 18 CFR 385.214.
    \8\ 18 CFR 157.10.
---------------------------------------------------------------------------

    There are two ways to submit your motion to intervene. In both 
instances, please reference the Project docket number CP25-10-000 in 
your submission.
    (1) You may file your motion to intervene by using the Commission's 
eFiling feature, which is located on the Commission's website 
(www.ferc.gov) under the link to Documents and Filings. New eFiling 
users must first create an account by clicking on ``eRegister.'' You 
will be asked to select the type of filing you are making; first select 
``General'' and then select ``Intervention.'' The eFiling feature 
includes a document-less intervention option; for more information, 
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf; or
    (2) You can file a paper copy of your motion to intervene, along 
with three copies, by mailing the documents to the address below. Your 
motion to intervene must reference the Project docket number CP25-10-
000.

To file via USPS: Debbie-Anne A. Reese, Secretary, Federal Energy 
Regulatory

[[Page 90688]]

Commission, 888 First Street NE, Washington, DC 20426
To file via any other courier: Debbie-Anne A. Reese, Secretary, Federal 
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 
20852

    The Commission encourages electronic filing of motions to intervene 
(option 1 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected].
    Protests and motions to intervene must be served on the applicant 
either by mail at: Antauis Byrd, Regulatory Analyst, Transcontinental 
Gas Pipe Line Company, LLC, Post Office Box 1396, Houston, Texas 77251, 
or by email at [email protected]. Any subsequent submissions by an 
intervenor must be served on the applicant and all other parties to the 
proceeding. Contact information for parties can be downloaded from the 
service list at the eService link on FERC Online. Service can be via 
email with a link to the document.
    All timely, unopposed \9\ motions to intervene are automatically 
granted by operation of Rule 214(c)(1).\10\ Motions to intervene that 
are filed after the intervention deadline are untimely, and may be 
denied. Any late-filed motion to intervene must show good cause for 
being late and must explain why the time limitation should be waived 
and provide justification by reference to factors set forth in Rule 
214(d) of the Commission's Rules and Regulations.\11\ A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies (paper or 
electronic) of all documents filed by the applicant and by all other 
parties.
---------------------------------------------------------------------------

    \9\ The applicant has 15 days from the submittal of a motion to 
intervene to file a written objection to the intervention.
    \10\ 18 CFR 385.214(c)(1).
    \11\ 18 CFR. 385.214(b)(3) and (d).
---------------------------------------------------------------------------

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Intervention Deadline: 5:00 p.m. Eastern Time on December 3, 2024.

    Dated: November 12, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-26825 Filed 11-15-24; 8:45 am]
BILLING CODE 6717-01-P