Tennessee Gas Pipeline Company, L.L.C.; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed 507g Line Abandonment Project, 89990-89992 [2024-26487]
Download as PDF
89990
Federal Register / Vol. 89, No. 220 / Thursday, November 14, 2024 / Notices
limitation should be waived. Motions to
intervene are more fully described at
https://www.ferc.gov/how-intervene.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: November 7, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–26489 Filed 11–13–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–529–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Scoping Period
Requesting Comments on
Environmental Issues for the Proposed
507g Line Abandonment Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document, that will
discuss the environmental impacts of
the 507G Line Abandonment Project
involving construction and operation of
facilities by Tennessee Gas Pipeline
Company, L.L.C. (Tennessee) in Acadia,
VerDate Sep<11>2014
20:16 Nov 13, 2024
Jkt 265001
Vermilion, Iberia, and St. Mary Parishes,
Louisiana. The Commission will use
this environmental document in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
from its action whenever it considers
the issuance of an authorization. This
gathering of public input is referred to
as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the environmental document on the
important environmental issues.
Additional information about the
Commission’s NEPA process is
described below in the NEPA Process
and Environmental Document section of
this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00pm Eastern Time on
December 9, 2024. Comments may be
submitted in written form. Further
details on how to submit comments are
provided in the Public Participation
section of this notice.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
staff determine what issues they need to
evaluate in the environmental
document. Commission staff will
consider all written comments during
the preparation of the environmental
document.
If you submitted comments on this
project to the Commission before the
opening of this docket on September 30,
2024, you will need to file those
comments in Docket No. CP24–529–000
to ensure they are considered as part of
this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
Tennessee provided landowners with
a fact sheet prepared by the FERC
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ which addresses typically
asked questions, including the use of
eminent domain and how to participate
in the Commission’s proceedings. This
fact sheet along with other landowner
topics of interest are available for
viewing on the FERC website
(www.ferc.gov) under the Natural Gas,
Landowner Topics link.
Public Participation
There are three methods you can use
to submit your comments to the
Commission. Please carefully follow
these instructions so that your
comments are properly recorded. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
a file with your submission. New
eFiling users must first create an
account by clicking on ‘‘eRegister.’’ You
will be asked to select the type of filing
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP24–529–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Debbie-Anne A. Reese, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Room 1A,
Washington, DC 20426. Submissions
sent via any other carrier must be
addressed to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Additionally, the Commission offers a
free service called eSubscription which
makes it easy to stay informed of all
issuances and submittals regarding the
dockets/projects to which you
subscribe. These instant email
notifications are the fastest way to
receive notification and provide a link
to the document files which can reduce
the amount of time you spend
E:\FR\FM\14NON1.SGM
14NON1
Federal Register / Vol. 89, No. 220 / Thursday, November 14, 2024 / Notices
researching proceedings. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Summary of the Proposed Project
Tennessee proposes to abandon a
portion of its 507G pipeline. The 507G
Line Abandonment Project would
consist of abandonment in-place and by
removal of a portion of the 507G–100
Line and abandonment in-place and by
removal of the remaining portion of the
507G–500 Line. According to
Tennessee, since these pipeline
facilities were placed in service, there
have been changes in natural gas supply
locations, patterns, and flows that have
led Tennessee to now request
abandonment of these facilities.
The 507G Line Abandonment Project
would consist of the following facilities:
• abandon in-place and by removal
approximately 59.6 miles and 15.8 miles
of 16-inch-diameter pipeline of the
507G–100 Line, respectively; and
• abandon in-place and by removal
approximately 7.9 miles and 1.1 miles
of 12-inch-diameter pipeline of the
507G–500 supply lateral pipeline,
respectively.
Under Section 2.55(a) of the
Commission’s regulations, Tennessee
intends to relocate an existing pigging
facility.1 The general location of the
project facilities is shown in appendix
1.2
Land Requirements for Construction
ddrumheller on DSK120RN23PROD with NOTICES1
Construction of the proposed facilities
would disturb about 458.64 acres of
land for the abandonment of the
pipelines. Following construction,
1 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’. For instructions on
connecting to eLibrary, refer to the last page of this
notice. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll free, (886)
208–3676 or TTY (202) 502–8659.
VerDate Sep<11>2014
20:16 Nov 13, 2024
Jkt 265001
Tennessee would maintain about 0.08
acre for permanent operation of the
pigging facility; the remaining acreage
would be restored and revert to former
uses.
NEPA Process and the Environmental
Document
Any environmental document issued
by the Commission will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under the relevant
general resource areas:
• geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• environmental justice;
• air quality and noise; and
• reliability and safety.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project and
make recommendations on how to
lessen or avoid impacts on the various
resource areas. Your comments will
help Commission staff identify and
focus on the issues that might have an
effect on the human environment and
potentially eliminate others from further
study and discussion in the
environmental document.
Following this scoping period,
Commission staff will determine
whether to prepare an Environmental
Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the
EIS will present Commission staff’s
independent analysis of the issues. If
Commission staff prepares an EA, a
Notice of Schedule for the Preparation
of an Environmental Assessment will be
issued. The EA may be issued for an
allotted public comment period. The
Commission would consider timely
comments on the EA before making its
decision regarding the proposed project.
If Commission staff prepares an EIS, a
Notice of Intent to Prepare an EIS/
Notice of Schedule will be issued,
which will open up an additional
comment period. Staff will then prepare
a draft EIS which will be issued for
public comment. Commission staff will
consider all timely comments received
during the comment period on the draft
EIS and revise the document, as
necessary, before issuing a final EIS.
Any EA or draft and final EIS will be
available in electronic format in the
public record through eLibrary 3 and the
Commission’s natural gas
environmental documents web page
3 For instructions on connecting to eLibrary, refer
to the last page of this notice.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
89991
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents). If
eSubscribed, you will receive instant
email notification when the
environmental document is issued.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the environmental document.4
Agencies that would like to request
cooperating agency status should follow
the instructions for filing comments
provided under the Public Participation
section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office(s), and to solicit
their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.5
The environmental document for this
project will document findings on the
impacts on historic properties and
summarize the status of consultations
under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project and includes a
mailing address with their comments.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Section 1501.8.
5 The Advisory Council on Historic Preservation’s
regulations are at title 36, Code of Federal
Regulations, part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\14NON1.SGM
14NON1
89992
Federal Register / Vol. 89, No. 220 / Thursday, November 14, 2024 / Notices
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number CP24–529–000 in
your request. If you are requesting a
change to your address, please be sure
to include your name and the correct
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/newsevents/events along with other related
information.
Dated: November 7, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–26487 Filed 11–13–24; 8:45 am]
ddrumheller on DSK120RN23PROD with NOTICES1
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–12394–01–OW]
Environmental Financial Advisory
Board (EFAB); Request for
Nominations
Environmental Protection
Agency (EPA).
AGENCY:
VerDate Sep<11>2014
20:16 Nov 13, 2024
Jkt 265001
Notice of request for
nominations of candidates to the
Environmental Financial Advisory
Board.
ACTION:
The U.S. Environmental
Protection Agency (EPA) invites
nominations of qualified candidates to
be considered for appointment to the
Environmental Financial Advisory
Board (the Board or EFAB). The Board
provides advice to EPA on ways to
lower the costs of, and increase
investments in, environmental and
public health protection. Appointments
will be made by the Administrator and
will be announced in June 2025. EPA
may also consider nominations received
through this solicitation in the event of
unanticipated vacancies on the Board.
DATES: Nominations should be
submitted in time to arrive no later than
December 16, 2024.
ADDRESSES: Nominations should be sent
via email to efab@epa.gov.
FOR FURTHER INFORMATION CONTACT: Any
member of the public who wants further
information concerning the nomination
process may contact Tara Johnson via
telephone/voicemail at (202) 809–7368
or email to efab@epa.gov. General
information concerning the EFAB is
available at www.epa.gov/
waterfinancecenter/efab.
SUPPLEMENTARY INFORMATION:
Background: The EFAB is an EPA
advisory committee chartered under the
Federal Advisory Committee Act
(FACA), 5 U.S.C. 10, to provide advice
and recommendations to EPA on
innovative approaches to financing
environmental programs, projects, and
activities. The Board was established in
1991 to provide advice and
recommendations to EPA. Since
inception, the Board has advised the
EPA on a wide-ranging set of issues
including but not limited to the
following:
• Creating incentives to increase
private investment in the provision of
environmental services and removing or
reducing constraints on private
involvement wherever possible;
• Developing new and innovative
environmental financing approaches
and supporting and encouraging the use
of cost-effective existing approaches;
• Identifying approaches, challenges,
opportunities, and methodologies
specifically targeted to small
community financing;
• Assessing government strategies for
implementing public-private
partnerships, including privatization,
operations and maintenance issues, and
other alternative financing mechanisms;
• Improving governmental principles
of accounting and disclosure standards
SUMMARY:
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
to help improve the financial
sustainability of environmental
programs;
• Increasing the capacity of state and
local governments to carry out their
respective environmental programs
under current Federal laws;
• Increasing the total investment in
environmental protection and
stewardship of public and private
environmental resources to help ease
the environmental financing challenge
facing our nation; and
• Developing innovative investment
models and market-based approaches
that increase the long-term resiliency of
infrastructure.
The Board’s recent work has
included:
• Options for the development of the
Greenhouse Gas Reduction Fund
authorized under the Inflation
Reduction Act; and
• Recommendations for catalyzing
pollution prevention finance, enhancing
the agency’s approach to encourage
increased Opportunity Zone funds
investment alongside existing EPA
funding tools, and improving the
availability of public and private
sources of funding for stormwater
infrastructure.
The Board meets either in-person or
virtually two times each calendar year
(two days per meeting) at different
locations within the continental United
States. In addition to the bi-annual
meetings, additional virtual meetings
may be held during the year to ensure
timely completion of the Board’s work.
Board members typically contribute
approximately 3 to 8 hours per month
to the activities of the Board. This
includes participation on one or more of
the Board’s active workgroups. Members
serve on the Board without
compensation; however, Board members
may receive travel and per diem
allowances where appropriate and in
accordance with Federal travel
regulations.
Members are appointed to represent
the perspective of specific
organizations, associations, or groups of
persons (Representative members), or to
provide their individual expertise
(Special Government Employee, or SGE,
members). Candidates invited to serve
as SGE members will be asked to submit
the ‘‘Confidential Financial Disclosure
Form for Special Government
Employees Serving on Federal Advisory
Committees at the U.S. Environmental
Protection Agency’’ (EPA Form 3110–
48). This confidential form allows EPA
to determine whether there is a statutory
conflict between that person’s public
responsibilities as an SGE member and
private interests and activities, or the
E:\FR\FM\14NON1.SGM
14NON1
Agencies
[Federal Register Volume 89, Number 220 (Thursday, November 14, 2024)]
[Notices]
[Pages 89990-89992]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-26487]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP24-529-000]
Tennessee Gas Pipeline Company, L.L.C.; Notice of Scoping Period
Requesting Comments on Environmental Issues for the Proposed 507g Line
Abandonment Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental document, that will discuss
the environmental impacts of the 507G Line Abandonment Project
involving construction and operation of facilities by Tennessee Gas
Pipeline Company, L.L.C. (Tennessee) in Acadia, Vermilion, Iberia, and
St. Mary Parishes, Louisiana. The Commission will use this
environmental document in its decision-making process to determine
whether the project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies regarding the project. As part of the National Environmental
Policy Act (NEPA) review process, the Commission takes into account
concerns the public may have about proposals and the environmental
impacts that could result from its action whenever it considers the
issuance of an authorization. This gathering of public input is
referred to as ``scoping.'' The main goal of the scoping process is to
focus the analysis in the environmental document on the important
environmental issues. Additional information about the Commission's
NEPA process is described below in the NEPA Process and Environmental
Document section of this notice.
By this notice, the Commission requests public comments on the
scope of issues to address in the environmental document. To ensure
that your comments are timely and properly recorded, please submit your
comments so that the Commission receives them in Washington, DC on or
before 5:00pm Eastern Time on December 9, 2024. Comments may be
submitted in written form. Further details on how to submit comments
are provided in the Public Participation section of this notice.
Your comments should focus on the potential environmental effects,
reasonable alternatives, and measures to avoid or lessen environmental
impacts. Your input will help the Commission staff determine what
issues they need to evaluate in the environmental document. Commission
staff will consider all written comments during the preparation of the
environmental document.
If you submitted comments on this project to the Commission before
the opening of this docket on September 30, 2024, you will need to file
those comments in Docket No. CP24-529-000 to ensure they are considered
as part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
Tennessee provided landowners with a fact sheet prepared by the
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do
I Need To Know?'' which addresses typically asked questions, including
the use of eminent domain and how to participate in the Commission's
proceedings. This fact sheet along with other landowner topics of
interest are available for viewing on the FERC website (www.ferc.gov)
under the Natural Gas, Landowner Topics link.
Public Participation
There are three methods you can use to submit your comments to the
Commission. Please carefully follow these instructions so that your
comments are properly recorded. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. Using eComment is an easy method for
submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; a comment on a particular project is considered a ``Comment
on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP24-
529-000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Additionally, the Commission offers a free service called
eSubscription which makes it easy to stay informed of all issuances and
submittals regarding the dockets/projects to which you subscribe. These
instant email notifications are the fastest way to receive notification
and provide a link to the document files which can reduce the amount of
time you spend
[[Page 89991]]
researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Summary of the Proposed Project
Tennessee proposes to abandon a portion of its 507G pipeline. The
507G Line Abandonment Project would consist of abandonment in-place and
by removal of a portion of the 507G-100 Line and abandonment in-place
and by removal of the remaining portion of the 507G-500 Line. According
to Tennessee, since these pipeline facilities were placed in service,
there have been changes in natural gas supply locations, patterns, and
flows that have led Tennessee to now request abandonment of these
facilities.
The 507G Line Abandonment Project would consist of the following
facilities:
abandon in-place and by removal approximately 59.6 miles
and 15.8 miles of 16-inch-diameter pipeline of the 507G-100 Line,
respectively; and
abandon in-place and by removal approximately 7.9 miles
and 1.1 miles of 12-inch-diameter pipeline of the 507G-500 supply
lateral pipeline, respectively.
Under Section 2.55(a) of the Commission's regulations, Tennessee
intends to relocate an existing pigging facility.\1\ The general
location of the project facilities is shown in appendix 1.\2\
---------------------------------------------------------------------------
\1\ A ``pig'' is a tool that the pipeline company inserts into
and pushes through the pipeline for cleaning the pipeline,
conducting internal inspections, or other purposes.
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary''. For instructions on
connecting to eLibrary, refer to the last page of this notice. For
assistance, contact FERC at [email protected] or call toll
free, (886) 208-3676 or TTY (202) 502-8659.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 458.64
acres of land for the abandonment of the pipelines. Following
construction, Tennessee would maintain about 0.08 acre for permanent
operation of the pigging facility; the remaining acreage would be
restored and revert to former uses.
NEPA Process and the Environmental Document
Any environmental document issued by the Commission will discuss
impacts that could occur as a result of the construction and operation
of the proposed project under the relevant general resource areas:
geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
environmental justice;
air quality and noise; and
reliability and safety.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project and make recommendations on
how to lessen or avoid impacts on the various resource areas. Your
comments will help Commission staff identify and focus on the issues
that might have an effect on the human environment and potentially
eliminate others from further study and discussion in the environmental
document.
Following this scoping period, Commission staff will determine
whether to prepare an Environmental Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the EIS will present Commission
staff's independent analysis of the issues. If Commission staff
prepares an EA, a Notice of Schedule for the Preparation of an
Environmental Assessment will be issued. The EA may be issued for an
allotted public comment period. The Commission would consider timely
comments on the EA before making its decision regarding the proposed
project. If Commission staff prepares an EIS, a Notice of Intent to
Prepare an EIS/Notice of Schedule will be issued, which will open up an
additional comment period. Staff will then prepare a draft EIS which
will be issued for public comment. Commission staff will consider all
timely comments received during the comment period on the draft EIS and
revise the document, as necessary, before issuing a final EIS. Any EA
or draft and final EIS will be available in electronic format in the
public record through eLibrary \3\ and the Commission's natural gas
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you
will receive instant email notification when the environmental document
is issued.
---------------------------------------------------------------------------
\3\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the environmental document.\4\ Agencies that would like
to request cooperating agency status should follow the instructions for
filing comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Section 1501.8.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office(s),
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\5\ The environmental document for this
project will document findings on the impacts on historic properties
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation's regulations
are at title 36, Code of Federal Regulations, part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project and includes a mailing address with their
comments. Commission staff will update the environmental mailing list
as the analysis proceeds to ensure that
[[Page 89992]]
Commission notices related to this environmental review are sent to all
individuals, organizations, and government entities interested in and/
or potentially affected by the proposed project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please complete one of
the following steps:
(1) Send an email to [email protected] stating your
request. You must include the docket number CP24-529-000 in your
request. If you are requesting a change to your address, please be sure
to include your name and the correct address. If you are requesting to
delete your address from the mailing list, please include your name and
address as it appeared on this notice. This email address is unable to
accept comments.
OR
(2) Return the attached ``Mailing List Update Form'' (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field. Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at [email protected] or (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at https://www.ferc.gov/news-events/events along with
other related information.
Dated: November 7, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-26487 Filed 11-13-24; 8:45 am]
BILLING CODE 6717-01-P