Evaluation of the Appropriateness of Public-Private Partnership Project Delivery Including Value for Money or Comparable Analyses; Bipartisan Infrastructure Law, 89692-89700 [2024-26210]
Download as PDF
89692
Federal Register / Vol. 89, No. 219 / Wednesday, November 13, 2024 / Notices
DEPARTMENT OF TRANSPORTATION
Federal Motor Carrier Safety
Administration
[Docket No. FMCSA–2023–0143]
Truck Leasing Task Force (TLTF):
Notice of Rescheduled Public Meeting
Federal Motor Carrier Safety
Administration (FMCSA), Department
of Transportation (DOT).
ACTION: Notice of a rescheduled meeting
of the TLTF.
AGENCY:
FMCSA announces that the
public meeting of the TLTF previously
scheduled for Wednesday, November
20, 2024, is rescheduled for Tuesday,
December 3, 2024.
DATES: The meeting will be held on
Tuesday, December 3, 2024, from 10
a.m. to 4 p.m. ET. Requests for
accommodations for a disability and
requests to submit written materials for
consideration during the meeting must
be received no later than Friday,
November 22, respectively.
ADDRESSES: The meeting will be virtual
for its entirety. Please register in
advance of the meeting at
www.fmcsa.dot.gov/tltf. A copy of the
agenda for each meeting will be made
available at www.fmcsa.dot.gov/tltf 1
week in advance of each meeting. Once
approved, copies of the meeting minutes
will be available at the website
following each meeting. You may visit
the TLTF website at
www.fmcsa.dot.gov/tltf for further
information on the committee and its
activities.
FOR FURTHER INFORMATION CONTACT: Ms.
Shannon L. Watson, Deputy Designated
Federal Officer, TLTF, FMCSA, 1200
New Jersey Avenue SE, Washington, DC
20590, (202) 360–2925, tltf@dot.gov.
Any committee-related request should
be sent to the person listed in this
section.
SUPPLEMENTARY INFORMATION:
lotter on DSK11XQN23PROD with NOTICES1
SUMMARY:
I. Background
Section 23009 of the Bipartisan
Infrastructure Law (BIL) (Pub. L. 117–
58) requires the Federal Motor Carrier
Safety Administration (FMCSA) to
establish the TLTF, which was set up in
accordance with the Federal Advisory
Committee Act (FACA), Public Law 92–
463 (1972). TLTF will examine the
terms, conditions, and equitability of
common truck leasing arrangements,
particularly as they impact owneroperators and trucking businesses
subject to such agreements and submit
a report on the task force’s identified
issues and conclusions regarding truck
VerDate Sep<11>2014
17:40 Nov 12, 2024
Jkt 265001
leasing arrangements, including
recommended best practices, to the
Secretary, the Secretary of Labor, and
the appropriate committees of Congress.
TLTF will work in coordination with
the United States Department of Labor.
TLTF operates in accordance with
FACA under the terms of the TLTF
charter, filed February 11, 2022, and
amended April 28, 2023, and renewed
February 9, 2024.
II. Agenda
• The final report of the Consumer
Financial Protection Bureau on its
analysis of the leases submitted to
FMCSA and their implications on
predatory leasing of trucks to drivers of
commercial motor vehicles;
• A presentation from the Drafting
Subcommittee on recommendations for
TLTF’s final report to FMCSA outlining
its recommendations on truck leasing
agreements and TLTF’s consideration of
these recommendations; and
• A public comment period that will
allow drivers and lessees of CMVs to
share their personal experiences with
leases and present any supporting
information they would like to share to
assist TLTF in making
recommendations on such agreements.
III. Public Participation
The meeting will be open to the
public via virtual platform. Advance
registration via the website
(www.fmcsa.dot.gov/tltf) is required by
Friday, November 22, 2024.
DOT is committed to providing equal
access to this meeting for all
participants. If you need alternative
formats or services due to a disability,
such as sign language interpretation or
other ancillary aids, please contact the
person listed in the FOR FURTHER
INFORMATION CONTACT section by Friday,
November 22.
Oral comments from the public will
be heard during the designated
comment period at the discretion of the
TLTF chair and Designated Federal
Officer. To accommodate as many
speakers as possible, the time for each
commenter will be limited to 2 minutes.
Speakers may submit a written copy of
their remarks for inclusion in the
meeting records and for circulation to
TLTF members. All prepared remarks
submitted on time will be accepted and
considered as part of the record. Any
member of the public may present a
written statement to the committee at
any time.
Larry W. Minor,
Associate Administrator for Policy.
[FR Doc. 2024–26218 Filed 11–12–24; 8:45 am]
BILLING CODE 4910–EX–P
PO 00000
Frm 00124
Fmt 4703
Sfmt 4703
DEPARTMENT OF TRANSPORTATION
Office of the Secretary
[Docket No. DOT–OST–2024–0103]
Evaluation of the Appropriateness of
Public-Private Partnership Project
Delivery Including Value for Money or
Comparable Analyses; Bipartisan
Infrastructure Law
Build America Bureau, Office
of the Secretary (OST), and Federal
Highway Administration (FHWA), U.S.
Department of Transportation (DOT).
ACTION: Proposed guidance, request for
comments.
AGENCY:
The Build America Bureau
(the Bureau) and the Federal Highway
Administration (FHWA) propose
guidance to help the public understand
statutory requirements to evaluate the
appropriateness of using public-private
partnerships (P3s) to deliver
infrastructure projects. This proposed
guidance intends to inform project
sponsors of the Bureau’s
implementation of the evaluation
requirements when seeking Federal
credit assistance through the
Transportation Infrastructure Finance
and Innovation Act of 1998 (TIFIA) and
the Railroad Rehabilitation and
Improvement Financing (RRIF) credit
assistance programs and FHWA’s
implementation of the major project
financial plan requirement perform
detailed Value for Money (VfM)
analysis. The Bureau and FHWA invite
public comment on this proposed
guidance. In addition to general
comments, the Bureau is seeking
specific feedback on the implementation
of certain statutory requirements. The
guidance does not contain any new
criteria, does not impose any new legal
requirements, and has no legal effect.
DATES: Written comments on this
proposed guidance must be submitted
on or before December 31, 2024 after
posting. The Bureau and FHWA will
consider comments received after that
date to the extent possible without
incurring additional expense or delay.
ADDRESSES: You may submit comments,
referencing Docket ID No. DOT–OST–
2024–0103 by using the Federal
eRulemaking Portal: https://
www.regulations.gov. Follow the
instructions for submitting comments.
Instructions: All submissions received
must include the agency name and
docket number for this proposed
guidance. All comments received will
be posted without change to https://
www.regulations.gov/, including any
personal information provided. Please
SUMMARY:
E:\FR\FM\13NON1.SGM
13NON1
Federal Register / Vol. 89, No. 219 / Wednesday, November 13, 2024 / Notices
see the Privacy Act heading in the
SUPPLEMENTARY INFORMATION section of
this document for Privacy Act
information related to any submitted
comments or materials.
Docket: For access to the docket to
read the proposed guidance or
comments received, go to https://
www.regulations.gov.
FOR FURTHER INFORMATION CONTACT:
Innovative Finance Technical
Assistance Team at the Build America
Bureau: InnovativeFinanceTA@dot.gov,
or call Jennifer Hara, Strategic
Partnerships Program Manager at 202–
839–0199.
SUPPLEMENTARY INFORMATION:
Contents
1. Introduction
2. Definitions
3. Principles of P3 Analysis
4. P3 Analysis Requirements
5. Compliance Guidelines
A. Early Phase P3 Evaluation (Stage 1)
B. Progressive P3 Procurement (Stage 1A)
C. Subsequent P3 Evaluations (Stage 2)
D. Auditing and Public Information
6. P3 Post-Implementation Review
Requirements
lotter on DSK11XQN23PROD with NOTICES1
1. Introduction
A public-private partnership (P3) is
an infrastructure project delivery
method in which a public owner and
project sponsor (called the public
sponsor) leverages private sector
resources and methods through a longterm contract that finances the project
and typically includes design,
construction, maintenance, and/or
operations. A mutually beneficial P3
aligns public and private interests
through the commercial and financial
terms of a project agreement, herein
referred to as the concession agreement.
Where appropriate, P3 delivery could
provide more value for projects as
compared to conventional public
delivery. However, in some cases, P3
delivery also creates complexities and
limitations for the public sponsor.
Public sponsors can analyze these
complexities, including project risks,
VerDate Sep<11>2014
17:40 Nov 12, 2024
Jkt 265001
and consider how best to manage them
before choosing a P3 with its long-term
partnership obligations. The general
term for the process of analyzing and
comparing advantages and
disadvantages of P3 versus conventional
public delivery options is value for
money analysis (VfM). The analysis
demonstrates whether delivering a
project using a P3 would yield more or
less value to the public sponsor than the
most suitable public delivery option.
The analysis also documents the goals,
objectives, and underlying assumptions
for the project delivery. The intent of
VfM is not to analyze the benefits of the
project itself but to document the
analysis underlying the public sponsor’s
chosen delivery option based on
expected benefits to the public.
Federal surface transportation statutes
require public sponsors to conduct a
VfM or comparable analysis for certain
projects, as described below and shown
in Exhibit 1. A VfM or comparable
analysis is required for:
• Any project type using any delivery
method where the project cost is over
$750 million, the project sponsor is a
public entity seeking federal credit
assistance, the project is in a state with
P3 laws, and the project generates
revenue or user fees;
• Any surface transportation project
receiving federal financial assistance
under title 23, United States Code, using
a P3 delivery method with a project cost
over $500 million; and
• Any project type using a P3
delivery method and seeking federal
credit assistance. On November 15,
2021, the President signed the
Infrastructure Investment and Jobs Act
(also known as the ‘‘Bipartisan
Infrastructure Law’’) (IIJA or the BIL)
into law.1 Section 70701 of the BIL
requires that certain projects with an
estimated total cost of more than
$750,000,000 conduct a VfM analysis or
comparable analysis. Additionally,
section 11508 of the BIL requires that
1 Public
PO 00000
Law 117–58 (2021).
Frm 00125
Fmt 4703
Sfmt 4703
89693
Major Projects 2 under section 106(h) of
title 23, United States Code, for which
the project sponsor intends to carry out
the project through a P3 shall include a
detailed VfM analysis or similar
comparative analysis. In addition, many
states’ P3 laws require public sponsors
to conduct due diligence analysis, such
as VfM, to determine whether the P3
delivery method would provide more
value and benefits to the public sponsor
than other delivery methods.
This proposed guidance is not aimed
at building the capacity or capability of
entities to develop and deliver
infrastructure projects through P3s.
Entities that want to build their
capacities and capabilities may access
Bureau and FHWA educational and
technical assistance resources.3 Through
such resources, Bureau and FHWA
subject matter experts are available
upon request to conduct targeted
workshops and provide training
materials for project sponsors.
To improve readability, clarity, and
brevity, this proposed guidance
describes the requirements with words
that might differ from statute and
regulation. The proposed guidance does
not contain any new criteria, does not
impose any new legal requirements, and
has no legal effect. The contents of this
document do not have the force of law
and are not meant to bind the public in
any way. This document is intended
only to share information with the
public on existing requirements under
the law or agency policies and is not
intended to modify any Major Projects
requirements under 23 U.S.C. 106(h).
The proposed guidance only applies to
Major Projects that require a VfM
analysis.
BILLING CODE P
2 A Major Project is a project funded with Federal
financial assistance under title 23, United States
Code, with a total estimated cost of $500 million
or more and such other projects as identified by the
Secretary of Transportation pursuant to 23 U.S.C.
106(h).
3 https://buildamerica.dot.gov/buildamerica/and
https://www.fhwa.dot.gov/ipd/p3/toolkit/.
E:\FR\FM\13NON1.SGM
13NON1
89694
Federal Register / Vol. 89, No. 219 / Wednesday, November 13, 2024 / Notices
Exhibit 1: Value for Money Guidance Use Decision Chart
Start Here
VfM required'
Is the project a Title 23 project
with a cost more than $500
million and using a P3 approach?
D Cost more than
D
D
D
D
$750 million
Carried out by
a public entity
Located in a
state with P3
laws
Applying for a
TIFIA or RRIF
loan
Generate user
fees or revenues
lotter on DSK11XQN23PROD with NOTICES1
BILLING CODE C
A. Proposed Guidance Public
Comments. The goal of this guidance is
to help public sponsors fulfill VfM or
comparable analysis requirements for
federally assisted projects where
applicable. The Bureau and FHWA
invite public comment on this guidance.
In addition, the Bureau is asking for
public input on two matters.
First, the Bureau is seeking input
about applying the VfM statutory
requirement for projects with costs
exceeding $750,000,000 that are
‘‘anticipated to generate user fees or
other revenues that could support the
capital and operating costs of such
project.’’ 4 In theory, the provision
requires a public sponsor to conduct
VfM if the project might generate a
single dollar of user fees or other
revenues. The statute does not specify
an amount of revenue generated below
which VfM is not required. The Bureau
invites the public to suggest ways to
apply the requirement without unduly
burdening public sponsors.
The proposed methodology for VfM
analyses in this guidance is useful for
Law 117–58, sec. 70701(b)(3)(B) (2021).
VerDate Sep<11>2014
17:40 Nov 12, 2024
Jkt 265001
Yes
Is the project using a P3 approach ➔
and seeking federal credit
Yes
assistance?
* Pub. L. 117-58, sec. 70701 (2021)
** Pub. L. 117-58, sec. 11508(d)(l)(C) (2021)
***49 U.S.C. 116(e)(3) and 23 U.S.C 602(a)(l 1)
4 Public
➔
PO 00000
VfM
required ...... •
VfM not
required
Major Project financial plan
requirements under section 106(h)(3)(D)
as added by BIL section 11508.5 The
proposed methodology will also be
useful for Major Projects receiving title
23 assistance that are intended to be
delivered as a P3. However, we note that
not all of the VfM requirements in this
proposed guidance apply to all Major
Projects. Only those Major Projects that
also meet the threshold requirements of
BIL sections 11508 and 70701 and
section 116(e)(3) of title 49, United
States Code, would need to satisfy the
VfM requirements described therein, as
supplemented by this proposed
guidance. For more information on
FHWA’s Major Projects requirements,
see FHWA’s Major Projects proposed
guidance documents, available at
https://www.fhwa.dot.gov/
majorprojects/.
Second, the Bureau is asking for
public input on ‘‘other information’’
that would be advantageous for the
Secretary of Transportation to require in
detailed P3 VfM evaluations. The VfM
requirement in BIL section 70701 lists
required elements for VfM or
5 Public
VfM
required'*
Law 117–58, sec. 11508(d)(1)(C) (2021).
Frm 00126
Fmt 4703
Sfmt 4703
comparable analysis and authorizes the
Secretary to require additional
information, as appropriate.6 Examples
of additional information that could be
beneficial to include as part of VfM are
long-term commitments and risks the P3
agreement creates for the public
sponsor, such as non-compete clauses
and revenue protections that could lead
to compensation from the public
sponsor; and impacts of P3 delivery on
business and labor, including
disadvantaged business enterprises,
local contractors, and public and private
employees.
The Bureau asks for comments from
the public to better inform its proposed
guidance process. The Bureau will post
these comments, without edit, including
any personal information the
commenter provides, to
www.regulations.gov, as described in
the system of records notice (DOT/ALL–
14 FDMS), which is available at
www.dot.gov/privacy. To facilitate
comment tracking and response, we
encourage commenters to provide their
name, or the name of their organization;
however, submission of names is
6 Public
E:\FR\FM\13NON1.SGM
Law 117–58, sec. 70701(a)(5) (2021).
13NON1
EN13NO24.000
Does the project
meet all five criteria
below?
Federal Register / Vol. 89, No. 219 / Wednesday, November 13, 2024 / Notices
completely optional. The Bureau will
fully consider all timely comments,
whether or not commenters identify
themselves. If you wish to provide
comments containing proprietary or
confidential information, please contact
the agency for alternate submission
instructions.
2. Definitions
89695
apply. If the exhibit does not
specifically define a term, industry
standard definitions apply.
For purposes of this proposed
guidance, the definitions in Exhibit 2
EXHIBIT 2—DEFINITIONS OF TERMS IN THIS PROPOSED GUIDANCE
Term
Definition
Public-private partnership (P3) .............
A long-term arrangement between a public sponsor and a private entity for delivery of a project that includes at least the following elements: design, construction, financing, and either operations or maintenance or both of the project over a term specified in a concession agreement (as defined below).
Agreement types:
Concession Agreement .................
Pre-development Agreement ........
Contract types:
Long-term Contract .......................
Short-term Contract .......................
Evaluation types:
Screening Evaluation ....................
Qualitative Evaluation ...................
Detailed Evaluation .......................
Federal financial assistance .................
Major Project ........................................
P3 procurement types:
Conventional P3 Procurement ......
Progressive P3 Procurement ........
An agreement between a public sponsor and private entity (e.g., concessionaire or developer) signed
after a preferred bidder is selected or contract price is agreed upon. Other names for such agreements include P3 agreement, project agreement, project development agreement, and comprehensive project agreement. BIL section 70701(a) uses the term ‘‘Project Development Agreement,’’
which the Bureau interprets as a concession agreement.
An agreement between a public sponsor and private entity to develop and design the project further
and finalize a committed proposal.
A contract between a public sponsor and a private entity to deliver a project, including some or all elements for design, construction, financing, operations, and maintenance over the concession term.
A contract between a public sponsor and private entity to deliver a project that does not include operations or maintenance.
An evaluation that sets high-level criteria based on the public sponsor’s project goals and objectives.
Before detailed project scope, cost, and schedule are available, an evaluation that compares advantages and disadvantages of all practical conventional and alternative delivery options including publicprivate partnership delivery. The public sponsor documents the process for selecting the preferred
delivery option based on the project’s characteristics, feasibility, goals, and objectives.
An evaluation that compares all practical conventional and alternative delivery options to select the
most suitable public delivery option and most suitable P3 delivery option and then estimates the likely
quantitative outcomes of public and P3 options. Conventional VfM quantifies differences in financial
outcomes to the public sponsor and evaluates other outcomes qualitatively. Detailed P3 evaluation
may account for non-financial benefits such as differences in service levels for the public and costs
to the public and society at large by use of benefit-cost analysis methodology. For example, if one
delivery method results in an earlier start of operations than the other, the public will benefit earlier
from higher service levels, which can be quantified in economic terms.
Includes grants and loans from the Federal government to support infrastructure investment, not including private activity bond allocations and grants for technical assistance.
A project funded with Federal financial assistance under title 23, United States Code, with a total estimated cost of $500 million or more and such other projects as identified by the Secretary of Transportation pursuant to 23 U.S.C. 106(h).
Public sponsor seeks competitive, fixed price, and certain schedule bids from qualified bidders after the
public sponsor completes a limited preliminary design of the project.
Through a competitive process early in project development, the public sponsor selects a qualified private entity to develop a project without a bid price.
3. Principles of P3 Analysis
lotter on DSK11XQN23PROD with NOTICES1
The appropriateness of P3 delivery as
an option should be evaluated during
the early phases of the project life cycle
(such as project identification and
delivery option screening) and as the
project progresses during project
development and procurement. With
better and more information available
later in the project life cycle, and as the
VerDate Sep<11>2014
17:40 Nov 12, 2024
Jkt 265001
commercial and financial terms or
assumptions change, the public sponsor
should update the P3 evaluation by
conducting detailed VfM to ensure a P3
model is still appropriate and in the
public interest.
To ensure compliance with statutory
VfM or comparable analysis
requirements, the Bureau expects public
sponsors to evaluate the appropriateness
of, and value to be generated from, P3
PO 00000
Frm 00127
Fmt 4703
Sfmt 4703
project delivery at two decision points
in the project lifecycle: (1) after project
identification and before the project
development phase, and (2) after the P3
procurement and before entering into a
concession agreement between the
public sponsor and private developer at
commercial close. Exhibit 3 below
shows these two decision points in a
simplified P3 project lifecycle.
E:\FR\FM\13NON1.SGM
13NON1
89696
Federal Register / Vol. 89, No. 219 / Wednesday, November 13, 2024 / Notices
Exhibit 3: Illustrative P3 Project Life Cycle
Project
development
Stage 1: Screening
evaluation of
delivery options
Project
identification
Commercial close,
concession
agreement executed
(due diligence)
j
Project
procurement
Stage 2: Detailed
VfM analysis
j
lotter on DSK11XQN23PROD with NOTICES1
The project life cycle presented in
Exhibit 3 also applies to Major Projects
under section 106(h) of title 23, United
States Code, with an estimated total cost
above $750 million that meet the other
criteria under BIL section 70701.
Additionally, under BIL section 11508,
the Major Project financial plan for
Major Projects being carried out through
a P3 must include a detailed VfM
analysis or similar comparative analysis.
This analysis is submitted as part of the
initial financial plan, or subsequent
financial plan annual update where
appropriate. For requirements
applicable to Major Projects that do not
meet these criteria, see FHWA’s Major
Projects guidance documents, available
at https://www.fhwa.dot.gov/
majorprojects/.
Observing principles derived from
lessons learned and best practices helps
public sponsors objectively analyze the
advantages and disadvantages of
delivering an infrastructure project
through a P3. Following these principles
also helps public sponsors communicate
to the public the basis of their decisions.
The next paragraphs describe principles
public sponsors should incorporate into
their analyses to support requests for
DOT federal financial assistance.
A. Establish Delivery Option Goals.
VfM provides insights to support
decision-making, when the public
sponsor defines goals related to the
delivery method. Examples of delivery
goals are maximizing use of innovative
approaches and technologies, preserving
flexibility for future improvements, and
minimizing the taxpayers’ near-term
financial burden in subsidizing the
project. Delivery goals may be different
than project goals. Whether a project is
likely to achieve project goals is better
VerDate Sep<11>2014
17:40 Nov 12, 2024
Jkt 265001
analyzed through techniques such as
benefit-cost analysis or environmental
or economic impact analysis, rather
than VfM.
B. Identify Practical Delivery Options.
After setting project delivery goals,
public sponsors can then consider
which delivery methods are likely to
fulfill the identified goals. Sponsors can
then narrow their choices by screening
out impractical ones. For example, a
public sponsor might have authority for
some delivery methods and not others.
Documenting the basis for rejecting a
delivery method enhances credibility of
the public sponsor’s process.
C. Inform Subsequent Decisions. VfM
analyzes tradeoffs between delivery
options to identify the most suitable
public delivery option and most suitable
P3 option. The public sponsor can then
determine whether the public or P3
option provides the most value relative
to the established delivery option goals.
The purpose of VfM is to inform
selection of the project delivery method,
not to justify project delivery decisions
public sponsors previously made. Using
VfM as intended, public sponsors will
be able to show how the analysis
preceded, and directly contributed to,
the decision to advance the project with
a P3 or other delivery approach.
D. Analytical Framework and Data.
VfM involves predictions, projections,
and assumptions. Public sponsors
should (a) use actual, verifiable data, if
possible, and (b) where predictions,
projections, and assumptions are
necessary, provide the methodology and
basis for the inputs.
E. Transparency and Accountability.
To the maximum extent practicable,
public sponsors should make
information available to the public,
PO 00000
Frm 00128
Hand back to
public owner
Operations and
maintenance
Fmt 4703
Sfmt 4703
including (a) the project’s delivery
goals, (b) the information used in the
VfM analysis, (c) how the VfM analysis
was employed in the decision-making
process, and (d) the decision-makers
charged with selecting the final delivery
method.
4. P3 Analysis Requirements
Several provisions in the legislation
established or amended statutory P3
evaluation requirements. Applicability
of these requirements depends on
project size, source of funding or
financing, phase of the project life cycle,
and other attributes. In 2005, the Safe,
Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for
Users defined the term major project,
reduced the financial plan requirement
threshold to $500 million, and required
submission of project management
plans.7 In 2012, the Moving Ahead for
Progress in the 21st Century Act
established the requirement to assess
the appropriateness of a P3 for
delivering major projects.8 The 2015
FAST Act established the requirement
that public sponsors receiving credit
assistance from the Bureau have
conducted VfM or comparable analysis
before deciding to advance projects as
P3s.9
Enacted November 15, 2021, the BIL
established new, and amended prior,
statutory P3 evaluation requirements.10
The BIL:
7 Public Law 109–59, sec. 1904(a) (2005),
amending 23 U.S.C. 106(h).
8 Public Law 112–141, sec. 1503(a)(4)(B) (2012),
amending 23 U.S.C. 106(h).
9 Public Law 114–94, sec. 9001(a) (2015), adding
49 U.S.C. 116(e)(3).
10 Public Law 117–58, secs. 11508 and 70701
(2021).
E:\FR\FM\13NON1.SGM
13NON1
EN13NO24.001
Design and
construction
Financial close
Federal Register / Vol. 89, No. 219 / Wednesday, November 13, 2024 / Notices
• establishes a P3 evaluation
requirement for projects with total
estimated costs of more than $750
million. Sponsors of these projects are
required to conduct VfM if they intend
to seek TIFIA or RRIF credit assistance,
are in a state in which there is a state
law authorizing the use and
implementation of P3s for
transportation projects, and the project
is anticipated to generate user fees or
other revenues that could support
project capital and operating costs.11
This provision of BIL further specifies
the level of detail and specific elements
to be included in this detailed P3
evaluation; 12
• amends the requirements of section
106(h) of title 23 to require public
sponsors of projects with an estimated
cost of $500 million or more, receiving
title 23 assistance, and intended to be
delivered as a P3, to conduct a detailed
VfM or similar comparative analysis; 13
89697
• stipulates reporting and
transparency requirements throughout
project delivery and following key
project delivery milestones; 14 and
• adds VfM as a TIFIA eligibility
criterion for projects to be carried out
through P3s.15
Exhibit 4 summarizes the statutory
requirements for projects required to
conduct a VfM analysis and the
expected evaluation type based on the
project delivery type.
EXHIBIT 4—P3 EVALUATION REQUIREMENTS BY PROJECT AND DELIVERY TYPE
Required public sponsor P3 evaluation *
Project type
Delivery type
Stage 1
Stage 1A
n.a ....................
Qualitative ........
Detailed.
Detailed.
n.a ....................
Qualitative ........
Detailed.
Detailed.
All transportation projects costing more than $750 million
that generate user fees or other revenues carried out by
certain public agencies in states with P3 authority, and
seeking TIFIA or RRIF credit assistance 16.
All delivery types, except progressive P3.
Progressive P3 ......................
Screening .......
Screening .......
Title 23 projects costing $500 million or more 17 .................
All P3 .....................................
Detailed.**
All projects proposed for P3 delivery and seeking TIFIA or
RRIF credit assistance 18.
Conventional P3 ....................
Progressive P3 ......................
Screening .......
Screening .......
Stage 2
Notes:
* Stage 1: early in project development before starting the procurement process.
Stage 1A: for a progressive P3, before signing a pre-development agreement.
Stage 2: before signing a concession agreement with a private P3 entity, if a P3 delivery method is selected in Stage 1.
n.a.: not applicable.
** The Major Project financial plan for Major Projects being carried out through a P3 agreement must include a detailed VfM analysis or similar
comparative analysis. This analysis is submitted as part of the initial financial plan, or subsequent financial plan annual update where appropriate. Project sponsors of Major Projects under 23 U.S.C. 106(h) should consider whether their project also meets the requirements of the other
VfM requirements detailed in this guidance. If so, their projects would also be subject to the additional VfM requirements detailed in this
guidance.
lotter on DSK11XQN23PROD with NOTICES1
5. Compliance Guidelines
This section details and clarifies
aspects of the P3 evaluation
requirements. Public sponsors and their
projects often have unique attributes
and circumstances that require in-depth
analysis and review that might differ
from the general descriptions herein.
We encourage you to discuss your
projects and applicable requirements
directly with the Bureau and FHWA
staff. Email us at BuildAmerica@dot.gov
or FHWAMajorProjects@dot.gov.
A. Early Phase P3 Evaluation (Stage
1). Outlining of strategies for the
business case early in the project
lifecycle, i.e., project identification and
screening, is critical for successful
project delivery selection. During
project identification and screening,
public sponsors should engage relevant
stakeholders through brainstorming and
risk assessment workshops and may use
any tool for qualitative or high-level
quantitative analysis to compare the
most suitable public project delivery
11 Public
Law 117–58, sec. 70701 (2021).
Law 117–58, sec. 70701(a) (2021).
13 Public Law 117–58, sec. 11508(d)(1)(C) (2021),
adding 23 U.S.C. 106(h)(3)(D).
12 Public
VerDate Sep<11>2014
17:40 Nov 12, 2024
Jkt 265001
option and the appropriate P3 option.
Project sponsors seeking credit
assistance under TIFIA and RRIF for all
projects procured as P3s (regardless of
size) are required to complete VfM or
comparable analysis prior to deciding to
advance the project as a P3.19 Because
the decision to advance a project as a P3
is made at Stage 1, public sponsors that
anticipate either seeking TIFIA or RRIF
credit assistance directly or that TIFIA
or RRIF might be part of their ultimate
preferred bidder’s financing package,
must conduct VfM at Stage 1.
Information available at Stage 1 is often
limited, so the Bureau anticipates VfMs
conducted at this stage would comprise
a screening analysis for conventional
P3s and any project required to perform
detailed VfM analysis under BIL Section
70701.
If the public sponsor cannot define a
workable public delivery option (e.g., in
a transit-oriented development project
for which a private entity already owns
the land or has secured development
rights), VfM or comparable analysis
14 Public Law 117–58, secs. 11508(b), (c), and
70701(c), (d) (2021).
15 Public Law 117–58, sec. 11508(d) (2021),
adding 23 U.S.C. 602(a)(11).
PO 00000
Frm 00129
Fmt 4703
Sfmt 4703
might not be feasible. In such cases, the
public sponsor can demonstrate
compliance with statutory requirements
by documenting before signing a
concession agreement why it cannot
complete a meaningful VfM or
comparable analysis and why it decided
to use a P3 delivery option.
B. Progressive P3 Procurement (Stage
1A). In a progressive P3 procurement,
the public sponsor selects a private
developer and executes a predevelopment agreement to design and
de-risk the project collaboratively. Then,
the private developer negotiates and
submits a firm price proposal for
delivering the project. If the public
sponsor accepts the proposal, the parties
sign a concession agreement.
The Bureau expects public sponsors
using a progressive P3 procurement to
conduct a qualitative VfM before signing
a pre-development agreement and a
detailed VfM prior to signing a
concession agreement. Similar to the
discussion of Stage 1 above, the Bureau
expects the VfM at Stage 1A will be
16 Public
Law 117–58, sec. 70701 (2021).
Law 117–58, sec 11508(d)(1)(C) (2021).
18 49 U.S.C. 116(e)(3) and 23 U.S.C. 602(a)(11).
19 49 U.S.C. 116(e)(3) and 23 U.S.C. 602(a)(11).
17 Public
E:\FR\FM\13NON1.SGM
13NON1
89698
Federal Register / Vol. 89, No. 219 / Wednesday, November 13, 2024 / Notices
qualitative with limited information
available regarding the project. After the
private developer submits a committed
bid price pursuant to the predevelopment agreement, the Bureau
would expect the public sponsor to
update and finalize the VfM based on
the terms and conditions of the
proposed P3 agreement. At this point,
the Bureau expects the public sponsor
to conduct a detailed P3 evaluation
prior to signing a concession agreement.
C. Subsequent P3 Evaluations (Stage
2). The Bureau expects this Stage 2
detailed analysis to be done once the
project sponsor has additional details on
project cost, funding/financing, and risk
allocation. However, the Bureau expects
that the Stage 2 analysis would be
completed before signing the concession
agreement. If the Stage 1 analysis
resulted in the selection of a non-P3
delivery method, a Stage 2 analysis will
not be required.
The detailed Stage 2 evaluation must
include:
lotter on DSK11XQN23PROD with NOTICES1
i. the life-cycle cost and project delivery
schedule;
ii. the costs of using public funding versus
private financing for the project;
iii. a description of the key assumptions
made in developing the analysis, including—
a. an analysis of any Federal grants or loans
and subsidies received or expected
(including tax depreciation costs);
b. the key terms of the proposed publicprivate partnership agreement, if applicable
(including the expected rate of return for
private debt and equity), and major
compensation events;
c. a discussion of the benefits and costs
associated with the allocation of risk;
d. the determination of risk premiums
assigned to various project delivery
scenarios;
e. assumptions about use, demand, and any
user fee revenue generated by the project;
and
f. any externality benefits for the public
generated by the project;
iv. a forecast of user fees and other
revenues expected to be generated by the
project, if applicable; and
v. any other information the Secretary of
Transportation determines to be
appropriate.20
Project sponsors may choose any tool
that provides analysis of items (i), (ii),
and (iii), including items (iii)(a) through
(f), above to meet the requirements for
detailed VfM. The Bureau recommends
public sponsors document the basis for
the analysis, project goals and
objectives, and the underlying
assumptions and rationale and then
make such analysis and documentation
available for public review. Any
enhancements or adjustments such as
risk premiums should be based on
20 Public
Law 117–58, sec. 70701(a) (2021).
VerDate Sep<11>2014
17:40 Nov 12, 2024
Jkt 265001
actual data, to the extent possible, and
reasonably verifiable.
The Bureau strongly encourages
public sponsors of P3 projects that
anticipate seeking TIFIA or RRIF credit
assistance to undertake both (a) a
screening analysis at Stage 1 or a
qualitative analysis at Stage 1A and (b)
a detailed VfM or comparable analysis
at Stage 2. The Bureau will evaluate the
type of VfM conducted at each stage to
determine whether a public sponsor has
satisfied all applicable requirements. In
doing so, the Bureau will seek to ensure
the public sponsor used information
appropriate for the stage at which the
analysis was conducted and that the
VfM was thorough. The Bureau
therefore expects to see a bifurcated
analysis as described above and that
public sponsors of P3 projects seeking
Bureau credit assistance 21 conduct a
detailed VfM that includes evaluation of
the elements in BIL Section 70701. The
Bureau is unlikely to find a public
sponsor satisfied these requirements if a
P3 project of any size or a project with
an anticipated cost of more than $750
million that generates user fees or other
revenues in states with P3 laws did not
undergo a screening VfM at Stage 1 (or
qualitative VfM for a progressive P3 at
Stage 1A) and a detailed VfM at Stage
2 (for projects selected for delivery as a
P3 as a result of Stage 1 analysis) that
evaluates the elements in BIL Section
70701.
If the public sponsor cannot define a
workable public delivery option, the
public sponsor can demonstrate
compliance with statutory requirements
by documenting before signing a
concession agreement why it cannot
complete a meaningful VfM or
comparable analysis and why it decided
to use a P3 delivery option.
D. Auditing and Public Information.
Transparency is an integral part of
proper public sector decision making,
particularly for long term commitments.
The Bureau recommends public
sponsors conduct an independent audit
prior to signing contracts, such as
concession agreements. An entity that
has no ties to the project should conduct
the audit and should ensure all
processes have been followed and all
major risks are properly identified,
documented, and shared with decision
makers and stakeholders. It should also
ensure all local and federal approvals
needed prior to execution of the
concession agreement are in place and
execution of the agreement will not
21 Including where the public sponsor is not itself
directly seeking TIFIA or RRIF credit assistance but
anticipates that its preferred bidder might do so.
PO 00000
Frm 00130
Fmt 4703
Sfmt 4703
impose any undisclosed major risks to
the public.
In addition to the foregoing, 49 U.S.C.
116(e)(3) requires public sponsors to
make the analysis and key terms of the
concession agreement publicly available
at an appropriate time. The Bureau
believes the appropriate time is as early
as possible after signing the concession
agreement, subject to any statutory
limitations on a public sponsor’s ability
to make this information public. The
Bureau expects public sponsors to make
the analysis and key terms of the
concession agreement (for P3 projects)
publicly available (including on the
website of the project, for projects
described in BIL Section 70701 22)
shortly after commercial close and prior
to financial close. The Bureau does not
expect to reach financial close on TIFIA
or RRIF credit assistance for P3 projects
or projects with anticipated costs of
more than $750 million that generate
user fees or other revenues in states
with P3 laws if the requisite information
has not yet been made public.
6. P3 Post-Implementation Review
Requirements
The FAST Act and BIL require project
sponsors to conduct postimplementation reviews of the private
partners’ compliance with concession
agreement terms, as a condition for
receiving TIFIA and RRIF credit
assistance.23 BIL directs the Secretary to
require the public sponsor of title 23 P3
projects costing $100,000,000 or more
that receive federal financial assistance,
including Bureau credit assistance, not
later than three years after the date of
opening of the project to traffic, to:
• Review the project, including the
private partner’s compliance with the
terms of the concession agreement;
• Certify to the Secretary that the
private partner is meeting terms of the
concession agreement for the project or
notify the Secretary about the private
partner’s non-compliance, including a
brief description of each violation of the
concession agreement; and
• Make publicly available the above
certification or notification without
disclosing proprietary or confidential
business information.24
Section 116(e)(3)(A)(iii) of title 49
establishes a similar review requirement
for any P3 project receiving TIFIA or
RRIF credit assistance and further
requires the public sponsor to provide a
publicly available summary of total
22 BIL section 70701(c) requires public sponsors
to post the results of the analysis on the website of
the project.
23 49 U.S.C. 116(e)(3)(A)(iii) and (iv) and Public
Law 117–58, sec. 11508(b) (2021).
24 Public Law 117–58, sec. 11508(b).
E:\FR\FM\13NON1.SGM
13NON1
Federal Register / Vol. 89, No. 219 / Wednesday, November 13, 2024 / Notices
federal financial assistance in the
project.
To satisfy these statutory review and
disclosure requirements, the Bureau
will require a public sponsor to sign a
direct agreement with the Bureau prior
to closing on Bureau credit assistance
that memorializes the public sponsor’s
obligation to conduct and disclose the
results of such review. A public sponsor
should incorporate into its concession
agreement the public sponsor’s
obligation to evaluate the
concessionaire’s performance and report
as the law requires. The Bureau’s loan
agreement with the concessionaire will
reference the relevant concession
agreement and applicable statutory
requirements and trigger a default in the
event the public sponsor does not
comply with its statutory obligations.
lotter on DSK11XQN23PROD with NOTICES1
Appendix: Statutory References to
Value for Money or Comparable
Analysis Bipartisan Infrastructure Law
(Pub. L. 117–58, 11508)
Sec. 11508. Requirements for Transportation
Projects Carried Out Through Public-Private
Partnerships
(a) DEFINITIONS.—In this section:
(1) PROJECT.—The term ‘‘project’’ means a
project (as defined in section 101 of title 23,
United States Code) that—
(A) is carried out, in whole or in part, using
Federal financial assistance; and
(B) has an estimated total cost of
$100,000,000 or more.
(2) PUBLIC-PRIVATE PARTNERSHIP.—
The term ‘‘public-private partnership’’ means
an agreement between a public agency and a
private entity to finance, build, and maintain
or operate a project.
(b) REQUIREMENTS FOR PROJECTS
CARRIED OUT THROUGH PUBLICPRIVATE PARTNERSHIPS.—With respect to
a public-private partnership, as a condition
of receiving Federal financial assistance for a
project, the Secretary shall require the public
partner, not later than 3 years after the date
of opening of the project to traffic—
(1) to conduct a review of the project,
including a review of the compliance of the
private partner with the terms of the publicprivate partnership agreement;
(2)(A) to certify to the Secretary that the
private partner of the public-private
partnership is meeting the terms of the
public-private partnership agreement for the
project; or
(B) to notify the Secretary that the private
partner of the public-private partnership has
not met 1 or more of the terms of the publicprivate partnership agreement for the project,
including a brief description of each
violation of the public-private partnership
agreement; and
(3) to make publicly available the
certification or notification, as applicable,
under paragraph (2) in a form that does close
any proprietary or confidential business
information.
(c) NOTIFICATION.—If the Secretary
provides Federal financial assistance to a
VerDate Sep<11>2014
17:40 Nov 12, 2024
Jkt 265001
project carried out through a public-private
partnership, not later than 30 days after the
date on which the Federal financial
assistance is first obligated, the Secretary
shall submit to the Committee on
Environment and Public Works of the Senate
and the Committee on Transportation and
Infrastructure of the House of Representatives
a notification of the Federal financial
assistance made available for the project.
(d) VALUE FOR MONEY ANALYSIS.—
(1) PROJECT APPROVAL AND
OVERSIGHT.—Section 106(h)(3) of title 23,
United States Code, is amended—
(A) in subparagraph (C), by striking ‘‘and’’
at the end;
(B) by redesignating subparagraph (D) as
subparagraph (E); and
(C) by inserting after subparagraph (C) the
following: ‘‘(D) for a project in which the
project sponsor intends to carry out the
project through a public-private partnership
agreement, shall include a detailed value for
money analysis or similar comparative
analysis for the project; and’’.
(2) SURFACE TRANSPORTATION BLOCK
GRANT PROGRAM.—Paragraph (21) of
section 133(b) of title 23, United States Code
(as redesignated by section 1109(a)(1)(C)), is
amended by inserting ‘‘, including
conducting value for money analyses or
similar comparative analyses,’’ after
‘‘oversight’’.
(3) TIFIA.—Section 602(a) of title 23,
United States Code, is amended by adding at
the end the following: ‘‘(11) PUBLICPRIVATE PARTNERSHIPS.—In the case of a
project to be carried out through a publicprivate partnership, the public partner shall
have—‘‘(A) conducted a value for money
analysis or similar comparative analysis; and
‘‘(B) determined the appropriateness of the
public-private partnership agreement.’’.
(e) APPLICABILITY.—This section and the
amendments made by this section shall only
apply to a public-private partnership
agreement entered into on or after the date
of enactment of this Act.
Bipartisan Infrastructure Law (Pub. L. 117–
58, 70701)
Title VII—Public–Private Partnerships
Sec. 70701. Value For Money Analysis
(a) IN GENERAL.—Notwithstanding any
other provision of law, in the case of a project
described in subsection (b), the entity
carrying out the project shall, during the
planning and project development process
and prior to signing any Project Development
Agreement, conduct a value for money
analysis or comparable analysis of the
project, which shall include an evaluation
of—
(1) the life-cycle cost and project delivery
schedule;
(2) the costs of using public funding versus
private financing for the project;
(3) a description of the key assumptions
made in developing the analysis, including—
(A) an analysis of any Federal grants or
loans and subsidies received or expected
(including tax depreciation costs);
(B) the key terms of the proposed publicprivate partnership agreement, if applicable
(including the expected rate of return for
PO 00000
Frm 00131
Fmt 4703
Sfmt 4703
89699
private debt and equity), and major
compensation events;
(C) a discussion of the benefits and costs
associated with the allocation of risk;
(D) the determination of risk premiums
assigned to various project delivery
scenarios;
(E) assumptions about use, demand, and
any user fee revenue generated by the project;
and
(F) any externality benefits for the public
generated by the project;
(4) a forecast of user fees and other
revenues expected to be generated by the
project, if applicable; and
(5) any other information the Secretary of
Transportation determines to be appropriate.
(b) PROJECT DESCRIBED.—A project
referred to in subsection (a) is a
transportation project—
(1) with an estimated total cost of more
than $750,000,000;
(2) carried out—
(A) by a public entity that is a State,
territory, Indian Tribe, unit of local
government, transit agency, port authority,
metropolitan planning organization, airport
authority, or other political subdivision of a
State or local government; and
(B) in a State in which there is in effect a
State law authorizing the use and
implementation of public-private
partnerships for transportation projects; and
(3)(A) that intends to submit a letter of
interest, or has submitted a letter of interest
after the date of enactment of this Act, to be
carried out with—(i) assistance under the
TIFIA program under chapter 6 of title 23,
United States Code; or (ii) assistance under
the Railroad Rehabilitation and Improvement
Financing Program of the Federal Railroad
Administration established under chapter
224 of title 49, United States Code; and
(B) that is anticipated to generate user fees
or other revenues that could support the
capital and operating costs of such project.
(c) REPORTING REQUIREMENTS.—
(1) PROJECT REPORTS.—For each project
described in subsection (b), the entity
carrying out the project shall—
(A) include the results of the analysis
under subsection (a) on the website of the
project; and
(B) submit the results of the analysis to the
Build America Bureau and the Secretary of
Transportation.
(2) REPORT TO CONGRESS.—The
Secretary of Transportation, in coordination
with the Build America Bureau, shall, not
later than 2 years after the date of enactment
of this Act—
(A) compile the analyses submitted under
paragraph (1)(B); and
(B) submit to Congress a report that—
(i) includes the analyses submitted under
paragraph (1)(B);
(ii) describes—
(I) the use of private financing for projects
described in subsection (b); and
(II) the costs and benefits of conducting a
value for money analysis; and
(iii) identifies best practices for private
financing of projects described in subsection
(b).
(d) GUIDANCE.—The Secretary of
Transportation, in coordination with the
E:\FR\FM\13NON1.SGM
13NON1
89700
Federal Register / Vol. 89, No. 219 / Wednesday, November 13, 2024 / Notices
Build America Bureau, shall issue guidance
on performance benchmarks, risk premiums,
and expected rates of return on private
financing for projects described in subsection
(b).
lotter on DSK11XQN23PROD with NOTICES1
United States Code, Title 23, Section 106(h)
(h) Major Projects.—
(1) In general.—Notwithstanding any other
provision of this section, a recipient of
Federal financial assistance for a project
under this title with an estimated total cost
of $500,000,000 or more, and recipients for
such other projects as may be identified by
the Secretary, shall submit to the Secretary
for each project—
(A) a project management plan; and
(B) an annual financial plan, including a
phasing plan when applicable.
(2) Project management plan.—A project
management plan shall document—
(A) the procedures and processes that are
in effect to provide timely information to the
project decisionmakers to effectively manage
the scope, costs, schedules, and quality of,
and the Federal requirements applicable to,
the project; and
(B) the role of the agency leadership and
management team in the delivery of the
project.
(3) Financial plan.—A financial plan—
(A) shall be based on detailed estimates of
the cost to complete the project;
(B) shall provide for the annual submission
of updates to the Secretary that are based on
reasonable assumptions, as determined by
the Secretary, of future increases in the cost
to complete the project;
(C) may include a phasing plan that
identifies fundable incremental
improvements or phases that will address the
purpose and the need of the project in the
short term in the event there are insufficient
financial resources to complete the entire
project. If a phasing plan is adopted for a
project pursuant to this section, the project
shall be deemed to satisfy the fiscal
constraint requirements in the statewide and
metropolitan planning requirements in
sections 134 and 135;
(D) for a project in which the project
sponsor intends to carry out the project
through a public-private partnership
agreement, shall include a detailed value for
money analysis or similar comparative
analysis for the project; and
(E) shall assess the appropriateness of a
public-private partnership to deliver the
project.
United States Code, Title 49, Section 116(e)
(e) Innovative Financing Best Practices.—
(1) In general.—The Bureau shall work
with the modal administrations within the
Department, eligible entities, and other
public and private interests to develop and
promote best practices for innovative
financing and public-private partnerships.
(2) Activities.—The Bureau shall carry out
paragraph (1)—
(A) by making Federal credit assistance
programs more accessible to eligible
recipients;
(B) by providing advice and expertise to
eligible entities that seek to leverage public
and private funding;
VerDate Sep<11>2014
17:40 Nov 12, 2024
Jkt 265001
(C) by sharing innovative financing best
practices and case studies from eligible
entities with other eligible entities that are
interested in utilizing innovative financing
methods; and
(D) by developing and monitoring—
(i) best practices with respect to
standardized State public-private partnership
authorities and practices, including best
practices related to—
(I) accurate and reliable assumptions for
analyzing public-private partnership
procurements;
(II) procedures for the handling of
unsolicited bids;
(III) policies with respect to noncompete
clauses; and
(IV) other significant terms of publicprivate partnership procurements, as
determined appropriate by the Bureau;
(ii) standard contracts for the most
common types of public-private partnerships
for transportation facilities; and
(iii) analytical tools and other techniques
to aid eligible entities in determining the
appropriate project delivery model, including
a value for money analysis.
(3) Transparency.—The Bureau shall—
(A) ensure the transparency of a project
receiving credit assistance under a program
referred to in subsection (d)(1) and procured
as a public-private partnership by—
(i) requiring the sponsor of the project to
undergo a value for money analysis or a
comparable analysis prior to deciding to
advance the project as a public-private
partnership;
(ii) requiring the analysis required under
subparagraph (A), and other key terms of the
relevant public-private partnership
agreement, to be made publicly available by
the project sponsor at an appropriate time;
(iii) not later than 3 years after the date of
completion of the project, requiring the
sponsor of the project to conduct a review
regarding whether the private partner is
meeting the terms of the relevant publicprivate partnership agreement; and
(iv) providing a publicly available
summary of the total level of Federal
assistance in such project; and
(B) develop guidance to implement this
paragraph that takes into consideration
variations in State and local laws and
requirements related to public-private
partnerships.
(4) Support to project sponsors.—At the
request of an eligible entity, the Bureau shall
provide technical assistance to the eligible
entity regarding proposed public-private
partnership agreements for transportation
facilities, including assistance in performing
a value for money analysis or comparable
analysis.
Duane Callender,
Acting Executive Director, Build America
Bureau.
[FR Doc. 2024–26210 Filed 11–12–24; 8:45 am]
BILLING CODE P
PO 00000
Frm 00132
Fmt 4703
Sfmt 4703
DEPARTMENT OF THE TREASURY
Financial Crimes Enforcement Network
RIN 1506–AB54
Agency Information Collection
Activities; Proposed Collection;
Comment Request; Real Estate
Reports
Financial Crimes Enforcement
Network (FinCEN), Treasury.
ACTION: Notice and request for
comments.
AGENCY:
FinCEN invites all interested
parties to comment on the proposed
information collection associated with
the requirement to report information
about certain residential real estate
transfers, as required by the Anti-Money
Laundering Regulations for Residential
Real Estate Transfers final rule
published on August 29, 2024. The
details included in the information
collection are listed below. This request
for comment is made pursuant to the
Paperwork Reduction Act of 1995.
DATES: Written comments are welcome
and must be received on or before
January 13, 2025.
ADDRESSES: Comments may be
submitted by any of the following
methods:
• Federal E-rulemaking Portal: https://
www.regulations.gov/. Follow the
instructions for submitting comments.
Refer to Docket Number FINCEN–2024–
0019 and the specific Office of
Management and Budget (OMB) control
number 1506–0080.
• Mail: Policy Division, Financial
Crimes Enforcement Network, P.O. Box
39, Vienna, VA 22183. Refer to Docket
Number FINCEN–2024–0019 and OMB
control number 1506–0080.
Please submit comments by one
method only. Comments will be
reviewed consistent with the Paperwork
Reduction Act of 1995 (PRA) and
applicable OMB regulations and
guidance. Comments submitted in
response to this notice will become a
matter of public record. Therefore, you
should submit only information that
you wish to make publicly available.
FOR FURTHER INFORMATION CONTACT:
FinCEN’s Regulatory Support Section at
1–800–767–2825 or electronically at
frc@fincen.gov.
SUPPLEMENTARY INFORMATION:
SUMMARY:
I. Statutory and Regulatory Provisions
The legislative framework generally
referred to as the Bank Secrecy Act
(BSA) consists of the Currency and
Foreign Transactions Reporting Act of
1970, as amended by the Uniting and
E:\FR\FM\13NON1.SGM
13NON1
Agencies
[Federal Register Volume 89, Number 219 (Wednesday, November 13, 2024)]
[Notices]
[Pages 89692-89700]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-26210]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Office of the Secretary
[Docket No. DOT-OST-2024-0103]
Evaluation of the Appropriateness of Public-Private Partnership
Project Delivery Including Value for Money or Comparable Analyses;
Bipartisan Infrastructure Law
AGENCY: Build America Bureau, Office of the Secretary (OST), and
Federal Highway Administration (FHWA), U.S. Department of
Transportation (DOT).
ACTION: Proposed guidance, request for comments.
-----------------------------------------------------------------------
SUMMARY: The Build America Bureau (the Bureau) and the Federal Highway
Administration (FHWA) propose guidance to help the public understand
statutory requirements to evaluate the appropriateness of using public-
private partnerships (P3s) to deliver infrastructure projects. This
proposed guidance intends to inform project sponsors of the Bureau's
implementation of the evaluation requirements when seeking Federal
credit assistance through the Transportation Infrastructure Finance and
Innovation Act of 1998 (TIFIA) and the Railroad Rehabilitation and
Improvement Financing (RRIF) credit assistance programs and FHWA's
implementation of the major project financial plan requirement perform
detailed Value for Money (VfM) analysis. The Bureau and FHWA invite
public comment on this proposed guidance. In addition to general
comments, the Bureau is seeking specific feedback on the implementation
of certain statutory requirements. The guidance does not contain any
new criteria, does not impose any new legal requirements, and has no
legal effect.
DATES: Written comments on this proposed guidance must be submitted on
or before December 31, 2024 after posting. The Bureau and FHWA will
consider comments received after that date to the extent possible
without incurring additional expense or delay.
ADDRESSES: You may submit comments, referencing Docket ID No. DOT-OST-
2024-0103 by using the Federal eRulemaking Portal: https://www.regulations.gov. Follow the instructions for submitting comments.
Instructions: All submissions received must include the agency name
and docket number for this proposed guidance. All comments received
will be posted without change to https://www.regulations.gov/,
including any personal information provided. Please
[[Page 89693]]
see the Privacy Act heading in the SUPPLEMENTARY INFORMATION section of
this document for Privacy Act information related to any submitted
comments or materials.
Docket: For access to the docket to read the proposed guidance or
comments received, go to https://www.regulations.gov.
FOR FURTHER INFORMATION CONTACT: Innovative Finance Technical
Assistance Team at the Build America Bureau:
[email protected], or call Jennifer Hara, Strategic
Partnerships Program Manager at 202-839-0199.
SUPPLEMENTARY INFORMATION:
Contents
1. Introduction
2. Definitions
3. Principles of P3 Analysis
4. P3 Analysis Requirements
5. Compliance Guidelines
A. Early Phase P3 Evaluation (Stage 1)
B. Progressive P3 Procurement (Stage 1A)
C. Subsequent P3 Evaluations (Stage 2)
D. Auditing and Public Information
6. P3 Post-Implementation Review Requirements
1. Introduction
A public-private partnership (P3) is an infrastructure project
delivery method in which a public owner and project sponsor (called the
public sponsor) leverages private sector resources and methods through
a long-term contract that finances the project and typically includes
design, construction, maintenance, and/or operations. A mutually
beneficial P3 aligns public and private interests through the
commercial and financial terms of a project agreement, herein referred
to as the concession agreement.
Where appropriate, P3 delivery could provide more value for
projects as compared to conventional public delivery. However, in some
cases, P3 delivery also creates complexities and limitations for the
public sponsor. Public sponsors can analyze these complexities,
including project risks, and consider how best to manage them before
choosing a P3 with its long-term partnership obligations. The general
term for the process of analyzing and comparing advantages and
disadvantages of P3 versus conventional public delivery options is
value for money analysis (VfM). The analysis demonstrates whether
delivering a project using a P3 would yield more or less value to the
public sponsor than the most suitable public delivery option. The
analysis also documents the goals, objectives, and underlying
assumptions for the project delivery. The intent of VfM is not to
analyze the benefits of the project itself but to document the analysis
underlying the public sponsor's chosen delivery option based on
expected benefits to the public.
Federal surface transportation statutes require public sponsors to
conduct a VfM or comparable analysis for certain projects, as described
below and shown in Exhibit 1. A VfM or comparable analysis is required
for:
Any project type using any delivery method where the
project cost is over $750 million, the project sponsor is a public
entity seeking federal credit assistance, the project is in a state
with P3 laws, and the project generates revenue or user fees;
Any surface transportation project receiving federal
financial assistance under title 23, United States Code, using a P3
delivery method with a project cost over $500 million; and
Any project type using a P3 delivery method and seeking
federal credit assistance. On November 15, 2021, the President signed
the Infrastructure Investment and Jobs Act (also known as the
``Bipartisan Infrastructure Law'') (IIJA or the BIL) into law.\1\
Section 70701 of the BIL requires that certain projects with an
estimated total cost of more than $750,000,000 conduct a VfM analysis
or comparable analysis. Additionally, section 11508 of the BIL requires
that Major Projects \2\ under section 106(h) of title 23, United States
Code, for which the project sponsor intends to carry out the project
through a P3 shall include a detailed VfM analysis or similar
comparative analysis. In addition, many states' P3 laws require public
sponsors to conduct due diligence analysis, such as VfM, to determine
whether the P3 delivery method would provide more value and benefits to
the public sponsor than other delivery methods.
---------------------------------------------------------------------------
\1\ Public Law 117-58 (2021).
\2\ A Major Project is a project funded with Federal financial
assistance under title 23, United States Code, with a total
estimated cost of $500 million or more and such other projects as
identified by the Secretary of Transportation pursuant to 23 U.S.C.
106(h).
---------------------------------------------------------------------------
This proposed guidance is not aimed at building the capacity or
capability of entities to develop and deliver infrastructure projects
through P3s. Entities that want to build their capacities and
capabilities may access Bureau and FHWA educational and technical
assistance resources.\3\ Through such resources, Bureau and FHWA
subject matter experts are available upon request to conduct targeted
workshops and provide training materials for project sponsors.
---------------------------------------------------------------------------
\3\ https://buildamerica.dot.gov/buildamerica/and https://www.fhwa.dot.gov/ipd/p3/toolkit/.
---------------------------------------------------------------------------
To improve readability, clarity, and brevity, this proposed
guidance describes the requirements with words that might differ from
statute and regulation. The proposed guidance does not contain any new
criteria, does not impose any new legal requirements, and has no legal
effect. The contents of this document do not have the force of law and
are not meant to bind the public in any way. This document is intended
only to share information with the public on existing requirements
under the law or agency policies and is not intended to modify any
Major Projects requirements under 23 U.S.C. 106(h). The proposed
guidance only applies to Major Projects that require a VfM analysis.
BILLING CODE P
[[Page 89694]]
[GRAPHIC] [TIFF OMITTED] TN13NO24.000
BILLING CODE C
A. Proposed Guidance Public Comments. The goal of this guidance is
to help public sponsors fulfill VfM or comparable analysis requirements
for federally assisted projects where applicable. The Bureau and FHWA
invite public comment on this guidance. In addition, the Bureau is
asking for public input on two matters.
First, the Bureau is seeking input about applying the VfM statutory
requirement for projects with costs exceeding $750,000,000 that are
``anticipated to generate user fees or other revenues that could
support the capital and operating costs of such project.'' \4\ In
theory, the provision requires a public sponsor to conduct VfM if the
project might generate a single dollar of user fees or other revenues.
The statute does not specify an amount of revenue generated below which
VfM is not required. The Bureau invites the public to suggest ways to
apply the requirement without unduly burdening public sponsors.
---------------------------------------------------------------------------
\4\ Public Law 117-58, sec. 70701(b)(3)(B) (2021).
---------------------------------------------------------------------------
The proposed methodology for VfM analyses in this guidance is
useful for Major Project financial plan requirements under section
106(h)(3)(D) as added by BIL section 11508.\5\ The proposed methodology
will also be useful for Major Projects receiving title 23 assistance
that are intended to be delivered as a P3. However, we note that not
all of the VfM requirements in this proposed guidance apply to all
Major Projects. Only those Major Projects that also meet the threshold
requirements of BIL sections 11508 and 70701 and section 116(e)(3) of
title 49, United States Code, would need to satisfy the VfM
requirements described therein, as supplemented by this proposed
guidance. For more information on FHWA's Major Projects requirements,
see FHWA's Major Projects proposed guidance documents, available at
https://www.fhwa.dot.gov/majorprojects/.
---------------------------------------------------------------------------
\5\ Public Law 117-58, sec. 11508(d)(1)(C) (2021).
---------------------------------------------------------------------------
Second, the Bureau is asking for public input on ``other
information'' that would be advantageous for the Secretary of
Transportation to require in detailed P3 VfM evaluations. The VfM
requirement in BIL section 70701 lists required elements for VfM or
comparable analysis and authorizes the Secretary to require additional
information, as appropriate.\6\ Examples of additional information that
could be beneficial to include as part of VfM are long-term commitments
and risks the P3 agreement creates for the public sponsor, such as non-
compete clauses and revenue protections that could lead to compensation
from the public sponsor; and impacts of P3 delivery on business and
labor, including disadvantaged business enterprises, local contractors,
and public and private employees.
---------------------------------------------------------------------------
\6\ Public Law 117-58, sec. 70701(a)(5) (2021).
---------------------------------------------------------------------------
The Bureau asks for comments from the public to better inform its
proposed guidance process. The Bureau will post these comments, without
edit, including any personal information the commenter provides, to
www.regulations.gov, as described in the system of records notice (DOT/
ALL-14 FDMS), which is available at www.dot.gov/privacy. To facilitate
comment tracking and response, we encourage commenters to provide their
name, or the name of their organization; however, submission of names
is
[[Page 89695]]
completely optional. The Bureau will fully consider all timely
comments, whether or not commenters identify themselves. If you wish to
provide comments containing proprietary or confidential information,
please contact the agency for alternate submission instructions.
2. Definitions
For purposes of this proposed guidance, the definitions in Exhibit
2 apply. If the exhibit does not specifically define a term, industry
standard definitions apply.
Exhibit 2--Definitions of Terms in This Proposed Guidance
------------------------------------------------------------------------
Term Definition
------------------------------------------------------------------------
Public-private partnership A long-term arrangement between a public
(P3). sponsor and a private entity for
delivery of a project that includes at
least the following elements: design,
construction, financing, and either
operations or maintenance or both of the
project over a term specified in a
concession agreement (as defined below).
Agreement types:
Concession Agreement..... An agreement between a public sponsor and
private entity (e.g., concessionaire or
developer) signed after a preferred
bidder is selected or contract price is
agreed upon. Other names for such
agreements include P3 agreement, project
agreement, project development
agreement, and comprehensive project
agreement. BIL section 70701(a) uses the
term ``Project Development Agreement,''
which the Bureau interprets as a
concession agreement.
Pre-development Agreement An agreement between a public sponsor and
private entity to develop and design the
project further and finalize a committed
proposal.
Contract types:
Long-term Contract....... A contract between a public sponsor and a
private entity to deliver a project,
including some or all elements for
design, construction, financing,
operations, and maintenance over the
concession term.
Short-term Contract...... A contract between a public sponsor and
private entity to deliver a project that
does not include operations or
maintenance.
Evaluation types:
Screening Evaluation..... An evaluation that sets high-level
criteria based on the public sponsor's
project goals and objectives.
Qualitative Evaluation... Before detailed project scope, cost, and
schedule are available, an evaluation
that compares advantages and
disadvantages of all practical
conventional and alternative delivery
options including public-private
partnership delivery. The public sponsor
documents the process for selecting the
preferred delivery option based on the
project's characteristics, feasibility,
goals, and objectives.
Detailed Evaluation...... An evaluation that compares all practical
conventional and alternative delivery
options to select the most suitable
public delivery option and most suitable
P3 delivery option and then estimates
the likely quantitative outcomes of
public and P3 options. Conventional VfM
quantifies differences in financial
outcomes to the public sponsor and
evaluates other outcomes qualitatively.
Detailed P3 evaluation may account for
non-financial benefits such as
differences in service levels for the
public and costs to the public and
society at large by use of benefit-cost
analysis methodology. For example, if
one delivery method results in an
earlier start of operations than the
other, the public will benefit earlier
from higher service levels, which can be
quantified in economic terms.
Federal financial assistance. Includes grants and loans from the
Federal government to support
infrastructure investment, not including
private activity bond allocations and
grants for technical assistance.
Major Project................ A project funded with Federal financial
assistance under title 23, United States
Code, with a total estimated cost of
$500 million or more and such other
projects as identified by the Secretary
of Transportation pursuant to 23 U.S.C.
106(h).
P3 procurement types:
Conventional P3 Public sponsor seeks competitive, fixed
Procurement. price, and certain schedule bids from
qualified bidders after the public
sponsor completes a limited preliminary
design of the project.
Progressive P3 Through a competitive process early in
Procurement. project development, the public sponsor
selects a qualified private entity to
develop a project without a bid price.
------------------------------------------------------------------------
3. Principles of P3 Analysis
The appropriateness of P3 delivery as an option should be evaluated
during the early phases of the project life cycle (such as project
identification and delivery option screening) and as the project
progresses during project development and procurement. With better and
more information available later in the project life cycle, and as the
commercial and financial terms or assumptions change, the public
sponsor should update the P3 evaluation by conducting detailed VfM to
ensure a P3 model is still appropriate and in the public interest.
To ensure compliance with statutory VfM or comparable analysis
requirements, the Bureau expects public sponsors to evaluate the
appropriateness of, and value to be generated from, P3 project delivery
at two decision points in the project lifecycle: (1) after project
identification and before the project development phase, and (2) after
the P3 procurement and before entering into a concession agreement
between the public sponsor and private developer at commercial close.
Exhibit 3 below shows these two decision points in a simplified P3
project lifecycle.
[[Page 89696]]
[GRAPHIC] [TIFF OMITTED] TN13NO24.001
The project life cycle presented in Exhibit 3 also applies to Major
Projects under section 106(h) of title 23, United States Code, with an
estimated total cost above $750 million that meet the other criteria
under BIL section 70701. Additionally, under BIL section 11508, the
Major Project financial plan for Major Projects being carried out
through a P3 must include a detailed VfM analysis or similar
comparative analysis. This analysis is submitted as part of the initial
financial plan, or subsequent financial plan annual update where
appropriate. For requirements applicable to Major Projects that do not
meet these criteria, see FHWA's Major Projects guidance documents,
available at https://www.fhwa.dot.gov/majorprojects/.
Observing principles derived from lessons learned and best
practices helps public sponsors objectively analyze the advantages and
disadvantages of delivering an infrastructure project through a P3.
Following these principles also helps public sponsors communicate to
the public the basis of their decisions. The next paragraphs describe
principles public sponsors should incorporate into their analyses to
support requests for DOT federal financial assistance.
A. Establish Delivery Option Goals. VfM provides insights to
support decision-making, when the public sponsor defines goals related
to the delivery method. Examples of delivery goals are maximizing use
of innovative approaches and technologies, preserving flexibility for
future improvements, and minimizing the taxpayers' near-term financial
burden in subsidizing the project. Delivery goals may be different than
project goals. Whether a project is likely to achieve project goals is
better analyzed through techniques such as benefit-cost analysis or
environmental or economic impact analysis, rather than VfM.
B. Identify Practical Delivery Options. After setting project
delivery goals, public sponsors can then consider which delivery
methods are likely to fulfill the identified goals. Sponsors can then
narrow their choices by screening out impractical ones. For example, a
public sponsor might have authority for some delivery methods and not
others. Documenting the basis for rejecting a delivery method enhances
credibility of the public sponsor's process.
C. Inform Subsequent Decisions. VfM analyzes tradeoffs between
delivery options to identify the most suitable public delivery option
and most suitable P3 option. The public sponsor can then determine
whether the public or P3 option provides the most value relative to the
established delivery option goals. The purpose of VfM is to inform
selection of the project delivery method, not to justify project
delivery decisions public sponsors previously made. Using VfM as
intended, public sponsors will be able to show how the analysis
preceded, and directly contributed to, the decision to advance the
project with a P3 or other delivery approach.
D. Analytical Framework and Data. VfM involves predictions,
projections, and assumptions. Public sponsors should (a) use actual,
verifiable data, if possible, and (b) where predictions, projections,
and assumptions are necessary, provide the methodology and basis for
the inputs.
E. Transparency and Accountability. To the maximum extent
practicable, public sponsors should make information available to the
public, including (a) the project's delivery goals, (b) the information
used in the VfM analysis, (c) how the VfM analysis was employed in the
decision-making process, and (d) the decision-makers charged with
selecting the final delivery method.
4. P3 Analysis Requirements
Several provisions in the legislation established or amended
statutory P3 evaluation requirements. Applicability of these
requirements depends on project size, source of funding or financing,
phase of the project life cycle, and other attributes. In 2005, the
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A
Legacy for Users defined the term major project, reduced the financial
plan requirement threshold to $500 million, and required submission of
project management plans.\7\ In 2012, the Moving Ahead for Progress in
the 21st Century Act established the requirement to assess the
appropriateness of a P3 for delivering major projects.\8\ The 2015 FAST
Act established the requirement that public sponsors receiving credit
assistance from the Bureau have conducted VfM or comparable analysis
before deciding to advance projects as P3s.\9\
---------------------------------------------------------------------------
\7\ Public Law 109-59, sec. 1904(a) (2005), amending 23 U.S.C.
106(h).
\8\ Public Law 112-141, sec. 1503(a)(4)(B) (2012), amending 23
U.S.C. 106(h).
\9\ Public Law 114-94, sec. 9001(a) (2015), adding 49 U.S.C.
116(e)(3).
---------------------------------------------------------------------------
Enacted November 15, 2021, the BIL established new, and amended
prior, statutory P3 evaluation requirements.\10\ The BIL:
---------------------------------------------------------------------------
\10\ Public Law 117-58, secs. 11508 and 70701 (2021).
---------------------------------------------------------------------------
[[Page 89697]]
establishes a P3 evaluation requirement for projects with
total estimated costs of more than $750 million. Sponsors of these
projects are required to conduct VfM if they intend to seek TIFIA or
RRIF credit assistance, are in a state in which there is a state law
authorizing the use and implementation of P3s for transportation
projects, and the project is anticipated to generate user fees or other
revenues that could support project capital and operating costs.\11\
This provision of BIL further specifies the level of detail and
specific elements to be included in this detailed P3 evaluation; \12\
---------------------------------------------------------------------------
\11\ Public Law 117-58, sec. 70701 (2021).
\12\ Public Law 117-58, sec. 70701(a) (2021).
---------------------------------------------------------------------------
amends the requirements of section 106(h) of title 23 to
require public sponsors of projects with an estimated cost of $500
million or more, receiving title 23 assistance, and intended to be
delivered as a P3, to conduct a detailed VfM or similar comparative
analysis; \13\
---------------------------------------------------------------------------
\13\ Public Law 117-58, sec. 11508(d)(1)(C) (2021), adding 23
U.S.C. 106(h)(3)(D).
---------------------------------------------------------------------------
stipulates reporting and transparency requirements
throughout project delivery and following key project delivery
milestones; \14\ and
---------------------------------------------------------------------------
\14\ Public Law 117-58, secs. 11508(b), (c), and 70701(c), (d)
(2021).
---------------------------------------------------------------------------
adds VfM as a TIFIA eligibility criterion for projects to
be carried out through P3s.\15\
---------------------------------------------------------------------------
\15\ Public Law 117-58, sec. 11508(d) (2021), adding 23 U.S.C.
602(a)(11).
---------------------------------------------------------------------------
Exhibit 4 summarizes the statutory requirements for projects
required to conduct a VfM analysis and the expected evaluation type
based on the project delivery type.
Exhibit 4--P3 Evaluation Requirements by Project and Delivery Type
----------------------------------------------------------------------------------------------------------------
Required public sponsor P3 evaluation *
Project type Delivery type ----------------------------------------------------------------
Stage 1 Stage 1A Stage 2
----------------------------------------------------------------------------------------------------------------
All transportation projects All delivery Screening.......... n.a.................. Detailed.
costing more than $750 types, except Screening.......... Qualitative.......... Detailed.
million that generate user progressive P3.
fees or other revenues Progressive P3..
carried out by certain
public agencies in states
with P3 authority, and
seeking TIFIA or RRIF credit
assistance \16\.
----------------------------------------------------------------
Title 23 projects costing All P3.......... Detailed.**
$500 million or more \17\.
----------------------------------------------------------------
All projects proposed for P3 Conventional P3. Screening.......... n.a.................. Detailed.
delivery and seeking TIFIA Progressive P3.. Screening.......... Qualitative.......... Detailed.
or RRIF credit assistance
\18\.
----------------------------------------------------------------------------------------------------------------
Notes:
* Stage 1: early in project development before starting the procurement process.
Stage 1A: for a progressive P3, before signing a pre-development agreement.
Stage 2: before signing a concession agreement with a private P3 entity, if a P3 delivery method is selected in
Stage 1.
n.a.: not applicable.
** The Major Project financial plan for Major Projects being carried out through a P3 agreement must include a
detailed VfM analysis or similar comparative analysis. This analysis is submitted as part of the initial
financial plan, or subsequent financial plan annual update where appropriate. Project sponsors of Major
Projects under 23 U.S.C. 106(h) should consider whether their project also meets the requirements of the other
VfM requirements detailed in this guidance. If so, their projects would also be subject to the additional VfM
requirements detailed in this guidance.
5. Compliance Guidelines
---------------------------------------------------------------------------
\16\ Public Law 117-58, sec. 70701 (2021).
\17\ Public Law 117-58, sec 11508(d)(1)(C) (2021).
\18\ 49 U.S.C. 116(e)(3) and 23 U.S.C. 602(a)(11).
---------------------------------------------------------------------------
This section details and clarifies aspects of the P3 evaluation
requirements. Public sponsors and their projects often have unique
attributes and circumstances that require in-depth analysis and review
that might differ from the general descriptions herein. We encourage
you to discuss your projects and applicable requirements directly with
the Bureau and FHWA staff. Email us at [email protected] or
[email protected].
A. Early Phase P3 Evaluation (Stage 1). Outlining of strategies for
the business case early in the project lifecycle, i.e., project
identification and screening, is critical for successful project
delivery selection. During project identification and screening, public
sponsors should engage relevant stakeholders through brainstorming and
risk assessment workshops and may use any tool for qualitative or high-
level quantitative analysis to compare the most suitable public project
delivery option and the appropriate P3 option. Project sponsors seeking
credit assistance under TIFIA and RRIF for all projects procured as P3s
(regardless of size) are required to complete VfM or comparable
analysis prior to deciding to advance the project as a P3.\19\ Because
the decision to advance a project as a P3 is made at Stage 1, public
sponsors that anticipate either seeking TIFIA or RRIF credit assistance
directly or that TIFIA or RRIF might be part of their ultimate
preferred bidder's financing package, must conduct VfM at Stage 1.
Information available at Stage 1 is often limited, so the Bureau
anticipates VfMs conducted at this stage would comprise a screening
analysis for conventional P3s and any project required to perform
detailed VfM analysis under BIL Section 70701.
---------------------------------------------------------------------------
\19\ 49 U.S.C. 116(e)(3) and 23 U.S.C. 602(a)(11).
---------------------------------------------------------------------------
If the public sponsor cannot define a workable public delivery
option (e.g., in a transit-oriented development project for which a
private entity already owns the land or has secured development
rights), VfM or comparable analysis might not be feasible. In such
cases, the public sponsor can demonstrate compliance with statutory
requirements by documenting before signing a concession agreement why
it cannot complete a meaningful VfM or comparable analysis and why it
decided to use a P3 delivery option.
B. Progressive P3 Procurement (Stage 1A). In a progressive P3
procurement, the public sponsor selects a private developer and
executes a pre-development agreement to design and de-risk the project
collaboratively. Then, the private developer negotiates and submits a
firm price proposal for delivering the project. If the public sponsor
accepts the proposal, the parties sign a concession agreement.
The Bureau expects public sponsors using a progressive P3
procurement to conduct a qualitative VfM before signing a pre-
development agreement and a detailed VfM prior to signing a concession
agreement. Similar to the discussion of Stage 1 above, the Bureau
expects the VfM at Stage 1A will be
[[Page 89698]]
qualitative with limited information available regarding the project.
After the private developer submits a committed bid price pursuant to
the pre-development agreement, the Bureau would expect the public
sponsor to update and finalize the VfM based on the terms and
conditions of the proposed P3 agreement. At this point, the Bureau
expects the public sponsor to conduct a detailed P3 evaluation prior to
signing a concession agreement.
C. Subsequent P3 Evaluations (Stage 2). The Bureau expects this
Stage 2 detailed analysis to be done once the project sponsor has
additional details on project cost, funding/financing, and risk
allocation. However, the Bureau expects that the Stage 2 analysis would
be completed before signing the concession agreement. If the Stage 1
analysis resulted in the selection of a non-P3 delivery method, a Stage
2 analysis will not be required.
The detailed Stage 2 evaluation must include:
i. the life-cycle cost and project delivery schedule;
ii. the costs of using public funding versus private financing
for the project;
iii. a description of the key assumptions made in developing the
analysis, including--
a. an analysis of any Federal grants or loans and subsidies
received or expected (including tax depreciation costs);
b. the key terms of the proposed public-private partnership
agreement, if applicable (including the expected rate of return for
private debt and equity), and major compensation events;
c. a discussion of the benefits and costs associated with the
allocation of risk;
d. the determination of risk premiums assigned to various
project delivery scenarios;
e. assumptions about use, demand, and any user fee revenue
generated by the project; and
f. any externality benefits for the public generated by the
project;
iv. a forecast of user fees and other revenues expected to be
generated by the project, if applicable; and
v. any other information the Secretary of Transportation
determines to be appropriate.\20\
---------------------------------------------------------------------------
\20\ Public Law 117-58, sec. 70701(a) (2021).
Project sponsors may choose any tool that provides analysis of
items (i), (ii), and (iii), including items (iii)(a) through (f), above
to meet the requirements for detailed VfM. The Bureau recommends public
sponsors document the basis for the analysis, project goals and
objectives, and the underlying assumptions and rationale and then make
such analysis and documentation available for public review. Any
enhancements or adjustments such as risk premiums should be based on
actual data, to the extent possible, and reasonably verifiable.
The Bureau strongly encourages public sponsors of P3 projects that
anticipate seeking TIFIA or RRIF credit assistance to undertake both
(a) a screening analysis at Stage 1 or a qualitative analysis at Stage
1A and (b) a detailed VfM or comparable analysis at Stage 2. The Bureau
will evaluate the type of VfM conducted at each stage to determine
whether a public sponsor has satisfied all applicable requirements. In
doing so, the Bureau will seek to ensure the public sponsor used
information appropriate for the stage at which the analysis was
conducted and that the VfM was thorough. The Bureau therefore expects
to see a bifurcated analysis as described above and that public
sponsors of P3 projects seeking Bureau credit assistance \21\ conduct a
detailed VfM that includes evaluation of the elements in BIL Section
70701. The Bureau is unlikely to find a public sponsor satisfied these
requirements if a P3 project of any size or a project with an
anticipated cost of more than $750 million that generates user fees or
other revenues in states with P3 laws did not undergo a screening VfM
at Stage 1 (or qualitative VfM for a progressive P3 at Stage 1A) and a
detailed VfM at Stage 2 (for projects selected for delivery as a P3 as
a result of Stage 1 analysis) that evaluates the elements in BIL
Section 70701.
---------------------------------------------------------------------------
\21\ Including where the public sponsor is not itself directly
seeking TIFIA or RRIF credit assistance but anticipates that its
preferred bidder might do so.
---------------------------------------------------------------------------
If the public sponsor cannot define a workable public delivery
option, the public sponsor can demonstrate compliance with statutory
requirements by documenting before signing a concession agreement why
it cannot complete a meaningful VfM or comparable analysis and why it
decided to use a P3 delivery option.
D. Auditing and Public Information. Transparency is an integral
part of proper public sector decision making, particularly for long
term commitments. The Bureau recommends public sponsors conduct an
independent audit prior to signing contracts, such as concession
agreements. An entity that has no ties to the project should conduct
the audit and should ensure all processes have been followed and all
major risks are properly identified, documented, and shared with
decision makers and stakeholders. It should also ensure all local and
federal approvals needed prior to execution of the concession agreement
are in place and execution of the agreement will not impose any
undisclosed major risks to the public.
In addition to the foregoing, 49 U.S.C. 116(e)(3) requires public
sponsors to make the analysis and key terms of the concession agreement
publicly available at an appropriate time. The Bureau believes the
appropriate time is as early as possible after signing the concession
agreement, subject to any statutory limitations on a public sponsor's
ability to make this information public. The Bureau expects public
sponsors to make the analysis and key terms of the concession agreement
(for P3 projects) publicly available (including on the website of the
project, for projects described in BIL Section 70701 \22\) shortly
after commercial close and prior to financial close. The Bureau does
not expect to reach financial close on TIFIA or RRIF credit assistance
for P3 projects or projects with anticipated costs of more than $750
million that generate user fees or other revenues in states with P3
laws if the requisite information has not yet been made public.
---------------------------------------------------------------------------
\22\ BIL section 70701(c) requires public sponsors to post the
results of the analysis on the website of the project.
---------------------------------------------------------------------------
6. P3 Post-Implementation Review Requirements
The FAST Act and BIL require project sponsors to conduct post-
implementation reviews of the private partners' compliance with
concession agreement terms, as a condition for receiving TIFIA and RRIF
credit assistance.\23\ BIL directs the Secretary to require the public
sponsor of title 23 P3 projects costing $100,000,000 or more that
receive federal financial assistance, including Bureau credit
assistance, not later than three years after the date of opening of the
project to traffic, to:
---------------------------------------------------------------------------
\23\ 49 U.S.C. 116(e)(3)(A)(iii) and (iv) and Public Law 117-58,
sec. 11508(b) (2021).
---------------------------------------------------------------------------
Review the project, including the private partner's
compliance with the terms of the concession agreement;
Certify to the Secretary that the private partner is
meeting terms of the concession agreement for the project or notify the
Secretary about the private partner's non-compliance, including a brief
description of each violation of the concession agreement; and
Make publicly available the above certification or
notification without disclosing proprietary or confidential business
information.\24\
---------------------------------------------------------------------------
\24\ Public Law 117-58, sec. 11508(b).
---------------------------------------------------------------------------
Section 116(e)(3)(A)(iii) of title 49 establishes a similar review
requirement for any P3 project receiving TIFIA or RRIF credit
assistance and further requires the public sponsor to provide a
publicly available summary of total
[[Page 89699]]
federal financial assistance in the project.
To satisfy these statutory review and disclosure requirements, the
Bureau will require a public sponsor to sign a direct agreement with
the Bureau prior to closing on Bureau credit assistance that
memorializes the public sponsor's obligation to conduct and disclose
the results of such review. A public sponsor should incorporate into
its concession agreement the public sponsor's obligation to evaluate
the concessionaire's performance and report as the law requires. The
Bureau's loan agreement with the concessionaire will reference the
relevant concession agreement and applicable statutory requirements and
trigger a default in the event the public sponsor does not comply with
its statutory obligations.
Appendix: Statutory References to Value for Money or Comparable
Analysis Bipartisan Infrastructure Law (Pub. L. 117-58, 11508)
Sec. 11508. Requirements for Transportation Projects Carried Out
Through Public-Private Partnerships
(a) DEFINITIONS.--In this section:
(1) PROJECT.--The term ``project'' means a project (as defined
in section 101 of title 23, United States Code) that--
(A) is carried out, in whole or in part, using Federal financial
assistance; and
(B) has an estimated total cost of $100,000,000 or more.
(2) PUBLIC-PRIVATE PARTNERSHIP.--The term ``public-private
partnership'' means an agreement between a public agency and a
private entity to finance, build, and maintain or operate a project.
(b) REQUIREMENTS FOR PROJECTS CARRIED OUT THROUGH PUBLIC-PRIVATE
PARTNERSHIPS.--With respect to a public-private partnership, as a
condition of receiving Federal financial assistance for a project,
the Secretary shall require the public partner, not later than 3
years after the date of opening of the project to traffic--
(1) to conduct a review of the project, including a review of
the compliance of the private partner with the terms of the public-
private partnership agreement;
(2)(A) to certify to the Secretary that the private partner of
the public-private partnership is meeting the terms of the public-
private partnership agreement for the project; or
(B) to notify the Secretary that the private partner of the
public-private partnership has not met 1 or more of the terms of the
public-private partnership agreement for the project, including a
brief description of each violation of the public-private
partnership agreement; and
(3) to make publicly available the certification or
notification, as applicable, under paragraph (2) in a form that does
close any proprietary or confidential business information.
(c) NOTIFICATION.--If the Secretary provides Federal financial
assistance to a project carried out through a public-private
partnership, not later than 30 days after the date on which the
Federal financial assistance is first obligated, the Secretary shall
submit to the Committee on Environment and Public Works of the
Senate and the Committee on Transportation and Infrastructure of the
House of Representatives a notification of the Federal financial
assistance made available for the project.
(d) VALUE FOR MONEY ANALYSIS.--
(1) PROJECT APPROVAL AND OVERSIGHT.--Section 106(h)(3) of title
23, United States Code, is amended--
(A) in subparagraph (C), by striking ``and'' at the end;
(B) by redesignating subparagraph (D) as subparagraph (E); and
(C) by inserting after subparagraph (C) the following: ``(D) for
a project in which the project sponsor intends to carry out the
project through a public-private partnership agreement, shall
include a detailed value for money analysis or similar comparative
analysis for the project; and''.
(2) SURFACE TRANSPORTATION BLOCK GRANT PROGRAM.--Paragraph (21)
of section 133(b) of title 23, United States Code (as redesignated
by section 1109(a)(1)(C)), is amended by inserting ``, including
conducting value for money analyses or similar comparative
analyses,'' after ``oversight''.
(3) TIFIA.--Section 602(a) of title 23, United States Code, is
amended by adding at the end the following: ``(11) PUBLIC-PRIVATE
PARTNERSHIPS.--In the case of a project to be carried out through a
public-private partnership, the public partner shall have--``(A)
conducted a value for money analysis or similar comparative
analysis; and ``(B) determined the appropriateness of the public-
private partnership agreement.''.
(e) APPLICABILITY.--This section and the amendments made by this
section shall only apply to a public-private partnership agreement
entered into on or after the date of enactment of this Act.
Bipartisan Infrastructure Law (Pub. L. 117-58, 70701)
Title VII--Public-Private Partnerships
Sec. 70701. Value For Money Analysis
(a) IN GENERAL.--Notwithstanding any other provision of law, in
the case of a project described in subsection (b), the entity
carrying out the project shall, during the planning and project
development process and prior to signing any Project Development
Agreement, conduct a value for money analysis or comparable analysis
of the project, which shall include an evaluation of--
(1) the life-cycle cost and project delivery schedule;
(2) the costs of using public funding versus private financing
for the project;
(3) a description of the key assumptions made in developing the
analysis, including--
(A) an analysis of any Federal grants or loans and subsidies
received or expected (including tax depreciation costs);
(B) the key terms of the proposed public-private partnership
agreement, if applicable (including the expected rate of return for
private debt and equity), and major compensation events;
(C) a discussion of the benefits and costs associated with the
allocation of risk;
(D) the determination of risk premiums assigned to various
project delivery scenarios;
(E) assumptions about use, demand, and any user fee revenue
generated by the project; and
(F) any externality benefits for the public generated by the
project;
(4) a forecast of user fees and other revenues expected to be
generated by the project, if applicable; and
(5) any other information the Secretary of Transportation
determines to be appropriate.
(b) PROJECT DESCRIBED.--A project referred to in subsection (a)
is a transportation project--
(1) with an estimated total cost of more than $750,000,000;
(2) carried out--
(A) by a public entity that is a State, territory, Indian Tribe,
unit of local government, transit agency, port authority,
metropolitan planning organization, airport authority, or other
political subdivision of a State or local government; and
(B) in a State in which there is in effect a State law
authorizing the use and implementation of public-private
partnerships for transportation projects; and
(3)(A) that intends to submit a letter of interest, or has
submitted a letter of interest after the date of enactment of this
Act, to be carried out with--(i) assistance under the TIFIA program
under chapter 6 of title 23, United States Code; or (ii) assistance
under the Railroad Rehabilitation and Improvement Financing Program
of the Federal Railroad Administration established under chapter 224
of title 49, United States Code; and
(B) that is anticipated to generate user fees or other revenues
that could support the capital and operating costs of such project.
(c) REPORTING REQUIREMENTS.--
(1) PROJECT REPORTS.--For each project described in subsection
(b), the entity carrying out the project shall--
(A) include the results of the analysis under subsection (a) on
the website of the project; and
(B) submit the results of the analysis to the Build America
Bureau and the Secretary of Transportation.
(2) REPORT TO CONGRESS.--The Secretary of Transportation, in
coordination with the Build America Bureau, shall, not later than 2
years after the date of enactment of this Act--
(A) compile the analyses submitted under paragraph (1)(B); and
(B) submit to Congress a report that--
(i) includes the analyses submitted under paragraph (1)(B);
(ii) describes--
(I) the use of private financing for projects described in
subsection (b); and
(II) the costs and benefits of conducting a value for money
analysis; and
(iii) identifies best practices for private financing of
projects described in subsection (b).
(d) GUIDANCE.--The Secretary of Transportation, in coordination
with the
[[Page 89700]]
Build America Bureau, shall issue guidance on performance
benchmarks, risk premiums, and expected rates of return on private
financing for projects described in subsection (b).
United States Code, Title 23, Section 106(h)
(h) Major Projects.--
(1) In general.--Notwithstanding any other provision of this
section, a recipient of Federal financial assistance for a project
under this title with an estimated total cost of $500,000,000 or
more, and recipients for such other projects as may be identified by
the Secretary, shall submit to the Secretary for each project--
(A) a project management plan; and
(B) an annual financial plan, including a phasing plan when
applicable.
(2) Project management plan.--A project management plan shall
document--
(A) the procedures and processes that are in effect to provide
timely information to the project decisionmakers to effectively
manage the scope, costs, schedules, and quality of, and the Federal
requirements applicable to, the project; and
(B) the role of the agency leadership and management team in the
delivery of the project.
(3) Financial plan.--A financial plan--
(A) shall be based on detailed estimates of the cost to complete
the project;
(B) shall provide for the annual submission of updates to the
Secretary that are based on reasonable assumptions, as determined by
the Secretary, of future increases in the cost to complete the
project;
(C) may include a phasing plan that identifies fundable
incremental improvements or phases that will address the purpose and
the need of the project in the short term in the event there are
insufficient financial resources to complete the entire project. If
a phasing plan is adopted for a project pursuant to this section,
the project shall be deemed to satisfy the fiscal constraint
requirements in the statewide and metropolitan planning requirements
in sections 134 and 135;
(D) for a project in which the project sponsor intends to carry
out the project through a public-private partnership agreement,
shall include a detailed value for money analysis or similar
comparative analysis for the project; and
(E) shall assess the appropriateness of a public-private
partnership to deliver the project.
United States Code, Title 49, Section 116(e)
(e) Innovative Financing Best Practices.--
(1) In general.--The Bureau shall work with the modal
administrations within the Department, eligible entities, and other
public and private interests to develop and promote best practices
for innovative financing and public-private partnerships.
(2) Activities.--The Bureau shall carry out paragraph (1)--
(A) by making Federal credit assistance programs more accessible
to eligible recipients;
(B) by providing advice and expertise to eligible entities that
seek to leverage public and private funding;
(C) by sharing innovative financing best practices and case
studies from eligible entities with other eligible entities that are
interested in utilizing innovative financing methods; and
(D) by developing and monitoring--
(i) best practices with respect to standardized State public-
private partnership authorities and practices, including best
practices related to--
(I) accurate and reliable assumptions for analyzing public-
private partnership procurements;
(II) procedures for the handling of unsolicited bids;
(III) policies with respect to noncompete clauses; and
(IV) other significant terms of public-private partnership
procurements, as determined appropriate by the Bureau;
(ii) standard contracts for the most common types of public-
private partnerships for transportation facilities; and
(iii) analytical tools and other techniques to aid eligible
entities in determining the appropriate project delivery model,
including a value for money analysis.
(3) Transparency.--The Bureau shall--
(A) ensure the transparency of a project receiving credit
assistance under a program referred to in subsection (d)(1) and
procured as a public-private partnership by--
(i) requiring the sponsor of the project to undergo a value for
money analysis or a comparable analysis prior to deciding to advance
the project as a public-private partnership;
(ii) requiring the analysis required under subparagraph (A), and
other key terms of the relevant public-private partnership
agreement, to be made publicly available by the project sponsor at
an appropriate time;
(iii) not later than 3 years after the date of completion of the
project, requiring the sponsor of the project to conduct a review
regarding whether the private partner is meeting the terms of the
relevant public-private partnership agreement; and
(iv) providing a publicly available summary of the total level
of Federal assistance in such project; and
(B) develop guidance to implement this paragraph that takes into
consideration variations in State and local laws and requirements
related to public-private partnerships.
(4) Support to project sponsors.--At the request of an eligible
entity, the Bureau shall provide technical assistance to the
eligible entity regarding proposed public-private partnership
agreements for transportation facilities, including assistance in
performing a value for money analysis or comparable analysis.
Duane Callender,
Acting Executive Director, Build America Bureau.
[FR Doc. 2024-26210 Filed 11-12-24; 8:45 am]