PE Hydro Generation, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 85196-85197 [2024-24808]
Download as PDF
85196
Federal Register / Vol. 89, No. 207 / Friday, October 25, 2024 / Notices
analyzed by staff and considered in the
Commission’s final licensing decision.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members, and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues
EA.
Target date
March 4, 2025.
Any questions regarding this notice
may be directed to Jeanne Edwards at
(202) 502–6181 or jeanne.edwards@
ferc.gov.
Assessment (EA) on the application to
license the project.1
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members, and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues
EA.
Dated: October 18, 2024.
Debbie-Anne A. Reese,
Secretary.
Target date
March 4, 2025.
Any questions regarding this notice
may be directed to Jeanne Edwards at
(202) 502–6181 or jeanne.edwards@
ferc.gov.
[FR Doc. 2024–24803 Filed 10–24–24; 8:45 am]
BILLING CODE 6717–01–P
Dated: October 18, 2024.
Debbie-Anne A. Reese,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2024–24804 Filed 10–24–24; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
ddrumheller on DSK120RN23PROD with NOTICES1
[Project No. 3342–025]
Briar Hydro Associates; Notice of
Intent To Prepare an Environmental
Assessment
Federal Energy Regulatory
Commission
On November 30, 2022, the Briar
Hydro Associates filed a new license
application for the 4.6-megawatt
Penacook Lower Falls Hydroelectric
Project No. 3342 (project). The project is
located on the Contoocook River in City
of Concord, and Town of Boscawen,
Merrimack County, New Hampshire.
In accordance with the Commission’s
regulations, on June 20, 2024,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, staff does not
anticipate that licensing the project
would constitute a major Federal action
significantly affecting the quality of the
human environment. Therefore, staff
intends to prepare an Environmental
PE Hydro Generation, LLC; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
VerDate Sep<11>2014
17:40 Oct 24, 2024
Jkt 265001
[Project No. 2391–053]
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 2391–053.
c. Date filed: January 3, 2022.
1 In accordance with the Council on
Environmental Quality’s regulations, the unique
identification number for documents relating to this
environmental review is EAXX–019–20–000–
1729248238. 40 CFR 1501.5(c)(4) (2024).
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
d. Applicant: PE Hydro Generation,
LLC.
e. Name of Project: Warren
Hydroelectric Project (P–2391–053).
f. Location: The project is located on
the Shenandoah River near the Town of
Front Royal in Warren County, Virginia.
The project does not occupy any Federal
land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Jody Smet,
Vice President, Regulatory Affairs, PE
Hydro Generation, LLC, 7315 Wisconsin
Ave., Suite 1100W, Bethesda, MD
20814; Phone at (804) 382–1764 or
email at jody.smet@eaglecreekre.com.
i. FERC Contact: Kristine Sillett at
(202) 502–6575; or email at
kristine.sillett@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy via U. S. Postal
Service to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. All
filings must clearly identify the project
name and docket number on the first
page: Warren Project (P–2391–053).
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervener
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
and is ready for environmental analysis
at this time.
E:\FR\FM\25OCN1.SGM
25OCN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 89, No. 207 / Friday, October 25, 2024 / Notices
l. The Warren Project consists of: (1)
a 15.3-foot-high, 527-foot-long,
reinforced concrete dam; (2) a 105-acre
impoundment with a storage capacity of
900 acre-feet; (3) a 44-foot-wide
headgate structure with four 4.5-foot by
8-foot gates; (4) a 350-foot-long headrace
canal; (5) an 82-foot-long, 30-foot-wide
powerhouse containing 3 Francis
turbine/generating units with a total
installed capacity of 750 kW; (6) 360foot-long, 2.4-kilovolt (kV) project
generator lines; (7) a substation
containing a 3-phase, 2.4/34.5-kV
transformer where interconnection with
the grid occurs; and (8) other
appurtenances. The project creates an
approximately 550-foot-long bypassed
reach of the Shenandoah River.
The project operates in run-of-river
mode with a minimum flow of 56 cubic
feet per second provided by a 1-inch
veil flow over the dam into the bypassed
reach. The project had an average
annual generation of 3,456 megawatthours between 2013 and 2017.
m. This filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicants and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicants.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding in
accordance with 18 CFR 4.34(b) and
385.2010.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
VerDate Sep<11>2014
17:40 Oct 24, 2024
Jkt 265001
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595, or at
OPP@ferc.gov.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. The applicant must file no later
than 60 days from the issuance date of
this notice: (1) copy of the water quality
certification; (2) a copy of the request for
certification, including proof of the date
on which the certifying agency received
the request; or (3) evidence of a waiver
of water quality certification.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestones
Target date
Deadline for filing comments, recommendations, terms and conditions, and prescriptions.
Deadline for filing reply comments ...
December 17,
2024.
January 31,
2025.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
Dated: October 18, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–24808 Filed 10–24–24; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OLEM–2024–0477; FRL 12345–
01–OLEM]
Agency Information Collection
Activities; Proposed Information
Collection Request; Comment
Request; Brownfields Program—
Accomplishment Reporting in
Assessment, Cleanup and
Redevelopment Exchange System
(ACRES) (Revision)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) is planning to submit an
information collection request (ICR),
Brownfields Program—Accomplishment
Reporting in Assessment, Cleanup and
Redevelopment Exchange System
SUMMARY:
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
85197
(ACRES) (EPA ICR Number 2104.10,
OMB Control Number 2050–0192) to the
Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act. Before doing so, EPA is
soliciting public comments on specific
aspects of the proposed information
collection as described below. This is a
proposed extension of the ICR, which is
currently approved through March 31,
2026. This notice allows for 60 days for
public comments.
DATES: Comments must be submitted on
or before December 24, 2024.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OLEM–2024–0477, to EPA online
using www.regulations.gov (our
preferred method), or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460. EPA’s policy is
that all comments received will be
included in the public docket without
change including any personal
information provided, unless the
comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Nicole Wireman, Office of Brownfields
and Land Revitalization, (5105T),
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: (202) 566–
2649; email address: wireman.nicole@
epa.gov.
SUPPLEMENTARY INFORMATION: This is a
proposed extension of the ICR, which is
currently approved through March 31,
2026. An agency may not conduct or
sponsor and a person is not required to
respond to a collection of information
unless it displays a currently valid OMB
control number.
This notice allows 60 days for public
comments. Supporting documents,
which explain in detail the information
that the EPA will be collecting, are
available in the public docket for this
ICR. The docket can be viewed online
at www.regulations.gov or in person at
the EPA Docket Center, WJC West,
Room 3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit https://www.epa.gov/
dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, EPA is soliciting comments
and information to enable it to: (i)
Evaluate whether the proposed
collection of information is necessary
E:\FR\FM\25OCN1.SGM
25OCN1
Agencies
[Federal Register Volume 89, Number 207 (Friday, October 25, 2024)]
[Notices]
[Pages 85196-85197]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-24808]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2391-053]
PE Hydro Generation, LLC; Notice of Application Ready for
Environmental Analysis and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2391-053.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation, LLC.
e. Name of Project: Warren Hydroelectric Project (P-2391-053).
f. Location: The project is located on the Shenandoah River near
the Town of Front Royal in Warren County, Virginia. The project does
not occupy any Federal land.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory
Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W,
Bethesda, MD 20814; Phone at (804) 382-1764 or email at
[email protected].
i. FERC Contact: Kristine Sillett at (202) 502-6575; or email at
[email protected].
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://ferconline.ferc.gov/QuickComment.aspx. For assistance, please
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy via U. S. Postal Service to: Debbie-
Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings must clearly identify the
project name and docket number on the first page: Warren Project (P-
2391-053).
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted and is ready for
environmental analysis at this time.
[[Page 85197]]
l. The Warren Project consists of: (1) a 15.3-foot-high, 527-foot-
long, reinforced concrete dam; (2) a 105-acre impoundment with a
storage capacity of 900 acre-feet; (3) a 44-foot-wide headgate
structure with four 4.5-foot by 8-foot gates; (4) a 350-foot-long
headrace canal; (5) an 82-foot-long, 30-foot-wide powerhouse containing
3 Francis turbine/generating units with a total installed capacity of
750 kW; (6) 360-foot-long, 2.4-kilovolt (kV) project generator lines;
(7) a substation containing a 3-phase, 2.4/34.5-kV transformer where
interconnection with the grid occurs; and (8) other appurtenances. The
project creates an approximately 550-foot-long bypassed reach of the
Shenandoah River.
The project operates in run-of-river mode with a minimum flow of 56
cubic feet per second provided by a 1-inch veil flow over the dam into
the bypassed reach. The project had an average annual generation of
3,456 megawatt-hours between 2013 and 2017.
m. This filing may be viewed on the Commission's website at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field, to access
the document. For assistance, contact FERC Online Support.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicants and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicants. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding in accordance with
18 CFR 4.34(b) and 385.2010.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202)502-6595, or at [email protected].
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. The applicant must file no later than 60 days from the issuance
date of this notice: (1) copy of the water quality certification; (2) a
copy of the request for certification, including proof of the date on
which the certifying agency received the request; or (3) evidence of a
waiver of water quality certification.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestones Target date
------------------------------------------------------------------------
Deadline for filing comments, December 17, 2024.
recommendations, terms and conditions,
and prescriptions.
Deadline for filing reply comments........ January 31, 2025.
------------------------------------------------------------------------
p. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
Dated: October 18, 2024.
Debbie-Anne A. Reese,
Secretary.