PE Hydro Generation, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 85194-85195 [2024-24807]
Download as PDF
85194
Federal Register / Vol. 89, No. 207 / Friday, October 25, 2024 / Notices
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: October 18, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–24811 Filed 10–24–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2425–057]
ddrumheller on DSK120RN23PROD with NOTICES1
PE Hydro Generation, LLC; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2425–057.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation,
LLC.
e. Name of Project: Luray and
Newport Hydroelectric Project (P–2425–
057).
f. Location: The two-development
Luray and Newport Project is located on
VerDate Sep<11>2014
17:40 Oct 24, 2024
Jkt 265001
the South Fork of the Shenandoah River
near the Towns of Luray (Luray
Development) and Newport (Newport
Development) in Page County, Virginia.
The project does not occupy any federal
land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Jody Smet,
Vice President, Regulatory Affairs, PE
Hydro Generation, LLC, 7315 Wisconsin
Ave., Suite 1100W, Bethesda, MD
20814; Phone at (804) 382–1764 or
email at jody.smet@eaglecreekre.com.
i. FERC Contact: Kristine Sillett at
(202) 502–6575; or email at
kristine.sillett@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy via U.S. Postal
Service to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. All
filings must clearly identify the project
name and docket number on the first
page: Luray and Newport Project (P–
2425–057).
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervener
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
and is ready for environmental analysis
at this time.
l. The Luray Development consists of:
(1) a 21.9-foot-high, 530-foot-long
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
reinforced concrete dam; (2) a 126-acre
impoundment with a storage capacity of
880 acre-feet; (3) a 100-foot-long, 27.5foot-wide powerhouse, adjacent to the
south end of the dam, containing three
Francis turbine/generating units having
a total installed capacity of 1,600 kW;
(4) 35-foot-long, 2.4-kilovolt (kV) project
generator lines; (5) a substation
containing a 3-phase, 2.4/34.5-kV
transformer where interconnection with
the grid occurs; and (6) other
appurtenances.
The Newport Development consists of:
(1) a 28.8-foot-high, 443-foot-long
reinforced concrete dam; (2) a 103-acre
impoundment with a storage capacity of
1,090 acre-feet; (3) a 73.5-foot-long,
21.2-foot-wide powerhouse adjacent to
the north end of the dam, with three
Francis turbine/generating units with a
total installed capacity of 1,400 kW; (4)
150-foot-long, 2.4-kilovolt (kV) project
generator lines; (5) a substation
containing a 3-phase, 2.4/34.5-kV
transformer where interconnection with
the grid occurs; and (5) other
appurtenances.
Both developments operate in run-ofriver mode with minimum flows of 47
cubic feet per second (cfs) and 40 cfs, at
the Luray and Newport Developments,
respectively. The project had an average
annual generation of 10,928 megawatthours between 2011 and 2016.
m. This filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicants and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicants.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding in
accordance with 18 CFR 4.34(b) and
385.2010.
E:\FR\FM\25OCN1.SGM
25OCN1
Federal Register / Vol. 89, No. 207 / Friday, October 25, 2024 / Notices
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595, or at
OPP@ferc.gov.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. The applicant must file no later
than 60 days from the issuance date of
this notice: (1) copy of the water quality
certification; (2) a copy of the request for
certification, including proof of the date
on which the certifying agency received
the request; or (3) evidence of a waiver
of water quality certification.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestones
Target date
Deadline for filing comments, recommendations, terms and conditions, and prescriptions.
Deadline for filing reply comments ...
December 17,
2024.
January 31,
2025.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
Dated: October 18, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–24807 Filed 10–24–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES1
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR25–5–000.
Applicants: Questar Gas Company.
Description: § 284.123 Rate Filing:
Questar dba Enbridge Utah Gas SOC
VerDate Sep<11>2014
17:40 Oct 24, 2024
Jkt 265001
filing October 17, 2024 to be effective
10/1/2024.
Filed Date: 10/17/24.
Accession Number: 20241017–5117.
Comment Date: 5 p.m. ET 11/7/24.
Docket Numbers: RP25–78–000.
Applicants: Centra Pipelines
Minnesota Inc.
Description: § 4(d) Rate Filing:
Updated Index of Shippers December
2024 to be effective 12/1/2024.
Filed Date: 10/18/24.
Accession Number: 20241018–5068.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: RP25–79–000.
Applicants: Portland Natural Gas
Transmission System.
Description: § 4(d) Rate Filing: Notice
Address Update to be effective 11/18/
2024.
Filed Date: 10/18/24.
Accession Number: 20241018–5073.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: RP25–80–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing: Update
to Part 8, Section 38, Removal of NonConforming Agreements to be effective
11/20/2024.
Filed Date: 10/18/24.
Accession Number: 20241018–5079.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: RP25–81–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Combined Update to Remove NonConforming and Expired Agreements—
October 2024 to be effective 11/20/2024.
Filed Date: 10/18/24.
Accession Number: 20241018–5091.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: RP25–82–000.
Applicants: TransCameron Pipeline,
LLC.
Description: Compliance filing:
TransCameron Cost Revenue Study re
CP15–551–000 to be effective N/A.
Filed Date: 10/18/24.
Accession Number: 20241018–5099.
Comment Date: 5 p.m. ET 10/30/24.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
85195
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at:https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: October 18, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–24810 Filed 10–24–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6689–018]
Briar Hydro Associates; Notice of
Intent to Prepare an Environmental
Assessment
On November 30, 2022, the Briar
Hydro Associates filed a new license
application for the 3.0-megawatt
Penacook Upper Falls Hydroelectric
Project No. 6689 (project). The project is
located on the Contoocook River in City
of Concord, and Town of Boscawen,
Merrimack County, New Hampshire.
In accordance with the Commission’s
regulations, on June 20, 2024,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, staff does not
anticipate that licensing the project
would constitute a major Federal action
significantly affecting the quality of the
human environment. Therefore, staff
intends to prepare an Environmental
Assessment (EA) on the application to
license the project.1
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
1 In accordance with the Council on
Environmental Quality’s regulations, the unique
identification number for documents relating to this
environmental review is EAXX–019–20–000–
1729248223. 40 CFR 1501.5(c)(4) (2024).
E:\FR\FM\25OCN1.SGM
25OCN1
Agencies
[Federal Register Volume 89, Number 207 (Friday, October 25, 2024)]
[Notices]
[Pages 85194-85195]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-24807]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2425-057]
PE Hydro Generation, LLC; Notice of Application Ready for
Environmental Analysis and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2425-057.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation, LLC.
e. Name of Project: Luray and Newport Hydroelectric Project (P-
2425-057).
f. Location: The two-development Luray and Newport Project is
located on the South Fork of the Shenandoah River near the Towns of
Luray (Luray Development) and Newport (Newport Development) in Page
County, Virginia. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory
Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W,
Bethesda, MD 20814; Phone at (804) 382-1764 or email at
[email protected].
i. FERC Contact: Kristine Sillett at (202) 502-6575; or email at
[email protected].
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://ferconline.ferc.gov/QuickComment.aspx. For assistance, please
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy via U.S. Postal Service to: Debbie-
Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings must clearly identify the
project name and docket number on the first page: Luray and Newport
Project (P-2425-057).
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted and is ready for
environmental analysis at this time.
l. The Luray Development consists of: (1) a 21.9-foot-high, 530-
foot-long reinforced concrete dam; (2) a 126-acre impoundment with a
storage capacity of 880 acre-feet; (3) a 100-foot-long, 27.5-foot-wide
powerhouse, adjacent to the south end of the dam, containing three
Francis turbine/generating units having a total installed capacity of
1,600 kW; (4) 35-foot-long, 2.4-kilovolt (kV) project generator lines;
(5) a substation containing a 3-phase, 2.4/34.5-kV transformer where
interconnection with the grid occurs; and (6) other appurtenances.
The Newport Development consists of: (1) a 28.8-foot-high, 443-
foot-long reinforced concrete dam; (2) a 103-acre impoundment with a
storage capacity of 1,090 acre-feet; (3) a 73.5-foot-long, 21.2-foot-
wide powerhouse adjacent to the north end of the dam, with three
Francis turbine/generating units with a total installed capacity of
1,400 kW; (4) 150-foot-long, 2.4-kilovolt (kV) project generator lines;
(5) a substation containing a 3-phase, 2.4/34.5-kV transformer where
interconnection with the grid occurs; and (5) other appurtenances.
Both developments operate in run-of-river mode with minimum flows
of 47 cubic feet per second (cfs) and 40 cfs, at the Luray and Newport
Developments, respectively. The project had an average annual
generation of 10,928 megawatt-hours between 2011 and 2016.
m. This filing may be viewed on the Commission's website at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field, to access
the document. For assistance, contact FERC Online Support.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicants and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicants. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding in accordance with
18 CFR 4.34(b) and 385.2010.
[[Page 85195]]
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202)502-6595, or at [email protected].
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. The applicant must file no later than 60 days from the issuance
date of this notice: (1) copy of the water quality certification; (2) a
copy of the request for certification, including proof of the date on
which the certifying agency received the request; or (3) evidence of a
waiver of water quality certification.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestones Target date
------------------------------------------------------------------------
Deadline for filing comments, December 17, 2024.
recommendations, terms and conditions,
and prescriptions.
Deadline for filing reply comments........ January 31, 2025.
------------------------------------------------------------------------
p. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
Dated: October 18, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-24807 Filed 10-24-24; 8:45 am]