Rover Pipeline LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Rover-Sunny Farms Receipt and Delivery Meter Station Project, 84567-84568 [2024-24478]
Download as PDF
Federal Register / Vol. 89, No. 205 / Wednesday, October 23, 2024 / Notices
The EIS will present Commission
staff’s independent analysis of the
issues. The U.S. Army Corps of
Engineers (Corps) is a cooperating
agency in the preparation of the EIS.5
Staff will prepare a draft EIS which will
be issued for public comment.
Commission staff will consider all
timely comments received during the
comment period on the draft EIS and
revise the document, as necessary,
before issuing a final EIS. Any draft and
final EIS will be available in electronic
format in the public record through
eLibrary.6 (If eSubscribed, you will
receive instant email notification when
the environmental document is issued.
Alternatives Under Consideration
As part of our review in the NEPA
document, the Commission will
consider a range of reasonable
alternatives that are technically and
economically feasible and meet the
purpose and need for the proposed
action.7 Alternatives that do not meet
these requirements will be summarized
and dismissed from further
consideration in the NEPA document.
Staff will also consider the no-action
alternative. Currently, we are
considering an alternative to the
proposed action that potentially meets
the above criteria: the applicants’
proposed action with staff
modifications.
The alternatives we are considering
may be expanded based on the
comments we receive, provided they
meet the required criteria. With this
notice, we ask commenters to identify
other potential alternatives for
consideration.
Schedule for Environmental Review
On March 21, 2024, the Commission
issued its Notice of Application for
Surrender of Exemption Accepted for
Filing for the Project. This Notice of
Intent identifies Commission staff’s
planned schedule for completion of the
final EIS for the Project, which is based
on an issuance of the draft EIS in May
2025, opening a 45-day public comment
period. All comments filed will be
reviewed by staff and considered in the
Commission’s final decision on the
proceeding.
Issuance of Notice of Availability of the
final EIS—November 21, 2025
In accordance with the Council on
Environmental Quality’s regulations for
EISs, agencies are to make schedules for
Agency
khammond on DSKJM1Z7X2PROD with NOTICES
Additional Information
Additional information about the
Project is available on the FERC website
at www.ferc.gov using the eLibrary link.
Click on the eLibrary link, click on
‘‘General Search’’ and enter the Docket
No. P–5737 in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Any questions regarding this notice
may be directed to Jennifer Polardino at
jennifer.polardino@ferc.gov, or (202)
502–6437.
5 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at 40 CFR 1501.8.
6 For instructions on connecting to eLibrary, refer
to the last page of this notice.
18:48 Oct 22, 2024
Jkt 265001
completing the NEPA process publicly
available.8 This notice identifies the
Commission’s anticipated schedule for
issuance of the final order for the
Project, which serves as the
Commission’s record of decision. We
currently anticipate issuing a final order
for the Project no later than:
Issuance of the Surrender Order—
February 19, 2026
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress. After the final EIS is issued,
the Commission will make a decision on
the proposal.
Permits and Authorizations
The table below lists the anticipated
permits and authorizations for the
Project required under federal law. This
list may not be all-inclusive and does
not preclude any permit or
authorization if it is not listed here.
Agencies with jurisdiction by law and/
or special expertise may formally
cooperate in the preparation of the
Commission’s EIS and may adopt the
EIS to satisfy its NEPA responsibilities
related to this Project.
Permit or authorization
U.S. Army Corps of Engineers .................................................................
California State Water Resources Control Board ....................................
VerDate Sep<11>2014
84567
Section 404 of the Clean Water Act Permit.
Section 401 Water Quality Certification.
Dated: October 17, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–24520 Filed 10–22–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–508–000]
Rover Pipeline LLC; Notice of
Schedule for the Preparation of an
Environmental Assessment for the
Rover–Sunny Farms Receipt and
Delivery Meter Station Project
On August 2, 2024, Rover Pipeline
LLC (Rover) filed an application in
Docket No. CP24–508–000 requesting a
Certificate of Public Convenience and
Necessity pursuant to Section 7(c) of the
Natural Gas Act to construct facilities at
7 40
CFR 1508.1(hh).
CFR 1501.10(h).
1 In accordance with the Council on
Environmental Quality’s regulations, the unique
8 40
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
a new interconnect on Rover’s mainline
in Hancock County, Ohio. The proposed
project is known as the Rover–Sunny
Farms Receipt and Delivery Meter
Station Project (Project).
On August 16, 2024, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s environmental
document for the Project.
This notice identifies Commission
staff’s intention to prepare an
environmental assessment (EA) for the
Project and the planned schedule for the
completion of the environmental
review.1 The EA will be issued for a 30day comment period.
identification number for documents relating to this
environmental review is EAXX–019–20–000–
1725459309. 40 CFR 1501.5(c)(4) (2024).
E:\FR\FM\23OCN1.SGM
23OCN1
84568
Federal Register / Vol. 89, No. 205 / Wednesday, October 23, 2024 / Notices
Schedule for Environmental Review
Additional Information
Issuance of EA—January 24, 2025
90-day Federal Authorization Decision
Deadline 2—April 24, 2025
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP24–508), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Project Description
Rover proposes to construct and
operate aboveground facilities and new
pipeline delivery and receipt point
interconnections within and adjacent to
Rover’s Mainline easement, at
approximate milepost 154.54, in
Hancock County, Ohio. The project
receipt interconnection would receive
up to 6,269 dekatherms of natural gas
per day and the delivery
interconnection and would deliver up to
7,893 dekatherms of natural gas per day.
The Project would consist of the
following facilities and activities:
• construction of one delivery meter
station with one hot tap, one tap valve,
and dual Coriolis Meter Skid;
• construction of one receipt meter
station with one hot tap, one tap valve,
dual Coriolis Meter Skid, and a gas
quality/measurement building;
• 90 feet of interconnect piping;
• installation of associated
appurtenant facilities; and
• construction of 0.6 mile of new
permanent access road leading from
West County Road 18 to the meter
station.
Background
khammond on DSKJM1Z7X2PROD with NOTICES
On September 16, 2024, the
Commission issued a Notice of Scoping
Period Requesting Comments on
Environmental Issues for the Proposed
Rover–Sunny Farms Receipt and
Delivery Meter Station Project (Notice of
Scoping). The Notice of Scoping was
sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. The U.S. Fish
and Wildlife Service provided
comments on wetlands, wildlife, and
endangered species. All substantive
comments received will be addressed in
the EA.
2 The
Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
VerDate Sep<11>2014
18:48 Oct 22, 2024
Jkt 265001
Dated: October 16, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–24478 Filed 10–22–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC25–5–000.
Applicants: CPV Maryland, LLC, CPV
Shore, LLC.
Description: Joint Application for
Authorization under Section 203 of the
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Federal Power Act of CPV Maryland,
LLC, et al.
Filed Date: 10/11/24.
Accession Number: 20241011–5213.
Comment Date: 5 pm ET 11/1/24.
Docket Numbers: EC25–6–000.
Applicants: Interstate Power and
Light Company, Duane Arnold Solar II,
LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Interstate Power
and Light Company, LLC, et al.
Filed Date: 10/11/24.
Accession Number: 20241011–5216.
Comment Date: 5 pm ET 11/1/24.
Docket Numbers: EC25–7–000.
Applicants: Basin Creek Equity
Partners, L.L.C.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Basin Creek Equity
Partners, L.L.C.
Filed Date: 10/11/24.
Accession Number: 20241011–5219.
Comment Date: 5 pm ET 11/1/24.
Docket Numbers: EC25–8–000.
Applicants: Milford Gen Lead, LLC,
Milford Wind Corridor Phase I, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Milford Gen Lead,
LLC, et al.
Filed Date: 10/15/24.
Accession Number: 20241015–5551.
Comment Date: 5 pm ET 11/5/24.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG25–10–000.
Applicants: Illinois Winds LLC.
Description: Illinois Winds LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 10/16/24.
Accession Number: 20241016–5111.
Comment Date: 5 pm ET 11/6/24.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1123–012;
ER10–1119–010.
Applicants: Central Illinois Public
Service Company, Union Electric
Company.
Description: Notice of Change in
Status of Union Electric et al.
Filed Date: 10/11/24.
Accession Number: 20241011–5221.
Comment Date: 5 pm ET 11/1/24.
Docket Numbers: ER10–2783–022;
ER10–2960–018; ER10–2969–022;
ER21–2423–010; ER21–2424–010;
ER22–1662–005.
Applicants: GB II New York LLC,
Generation Bridge M&M Holdings, LLC,
Generation Bridge Connecticut
E:\FR\FM\23OCN1.SGM
23OCN1
Agencies
[Federal Register Volume 89, Number 205 (Wednesday, October 23, 2024)]
[Notices]
[Pages 84567-84568]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-24478]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP24-508-000]
Rover Pipeline LLC; Notice of Schedule for the Preparation of an
Environmental Assessment for the Rover-Sunny Farms Receipt and Delivery
Meter Station Project
On August 2, 2024, Rover Pipeline LLC (Rover) filed an application
in Docket No. CP24-508-000 requesting a Certificate of Public
Convenience and Necessity pursuant to Section 7(c) of the Natural Gas
Act to construct facilities at a new interconnect on Rover's mainline
in Hancock County, Ohio. The proposed project is known as the Rover-
Sunny Farms Receipt and Delivery Meter Station Project (Project).
On August 16, 2024, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
environmental document for the Project.
This notice identifies Commission staff's intention to prepare an
environmental assessment (EA) for the Project and the planned schedule
for the completion of the environmental review.\1\ The EA will be
issued for a 30-day comment period.
---------------------------------------------------------------------------
\1\ In accordance with the Council on Environmental Quality's
regulations, the unique identification number for documents relating
to this environmental review is EAXX-019-20-000-1725459309. 40 CFR
1501.5(c)(4) (2024).
---------------------------------------------------------------------------
[[Page 84568]]
Schedule for Environmental Review
Issuance of EA--January 24, 2025
90-day Federal Authorization Decision Deadline \2\--April 24, 2025
---------------------------------------------------------------------------
\2\ The Commission's deadline applies to the decisions of other
federal agencies, and state agencies acting under federally
delegated authority, that are responsible for federal
authorizations, permits, and other approvals necessary for proposed
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the
Commission's deadline for other agency's decisions applies unless a
schedule is otherwise established by federal law.
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Rover proposes to construct and operate aboveground facilities and
new pipeline delivery and receipt point interconnections within and
adjacent to Rover's Mainline easement, at approximate milepost 154.54,
in Hancock County, Ohio. The project receipt interconnection would
receive up to 6,269 dekatherms of natural gas per day and the delivery
interconnection and would deliver up to 7,893 dekatherms of natural gas
per day.
The Project would consist of the following facilities and
activities:
construction of one delivery meter station with one hot
tap, one tap valve, and dual Coriolis Meter Skid;
construction of one receipt meter station with one hot
tap, one tap valve, dual Coriolis Meter Skid, and a gas quality/
measurement building;
90 feet of interconnect piping;
installation of associated appurtenant facilities; and
construction of 0.6 mile of new permanent access road
leading from West County Road 18 to the meter station.
Background
On September 16, 2024, the Commission issued a Notice of Scoping
Period Requesting Comments on Environmental Issues for the Proposed
Rover-Sunny Farms Receipt and Delivery Meter Station Project (Notice of
Scoping). The Notice of Scoping was sent to affected landowners;
federal, state, and local government agencies; elected officials;
environmental and public interest groups; Native American tribes; other
interested parties; and local libraries and newspapers. The U.S. Fish
and Wildlife Service provided comments on wetlands, wildlife, and
endangered species. All substantive comments received will be addressed
in the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of formal issuances and submittals in specific dockets, the
Commission offers a free service called eSubscription. This service
provides automatic notification of filings made to subscribed dockets,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP24-508), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: October 16, 2024.
Debbie-Anne A. Reese,
Secretary.