Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline; Natural Gas Pipeline Company of America, LLC, 83869-83870 [2024-24170]
Download as PDF
Federal Register / Vol. 89, No. 202 / Friday, October 18, 2024 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
above. Written statements may be filed
with the Board via email either before
or after the meeting. Public comments
received by no later than 5 p.m. EST on
Wednesday, November 6, 2024, will be
read aloud during the meeting.
Comments will be accepted after the
meeting by no later than 5 p.m. EST on
Monday, November 18, 2024. Please
submit comments to orssab@
orem.doe.gov. Please put ‘‘Public
Comment’’ in the subject line.
Individuals who wish to make oral
statements should contact Melyssa P.
Noe at the email address or telephone
number listed above. Requests must be
received five days prior to the meeting
and reasonable provision will be made
to include the presentation in the
agenda. The Deputy Designated Federal
Officer is empowered to conduct the
meeting in a fashion that will facilitate
the orderly conduct of business.
Individuals wishing to submit written
public comments should email them as
directed above. Individuals wishing to
make public comments will be provided
a maximum of five minutes to present
their comments.
Minutes: Minutes will be available by
emailing or calling Melyssa P. Noe at
the email address and telephone
number listed above. Minutes will also
be available at the following website:
https://www.energy.gov/orem/listings/
oak-ridge-site-specific-advisory-boardmeetings.
Signing Authority: This document of
the Department of Energy was signed on
October 15, 2024, by David Borak,
Committee Management Officer,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on October 15,
2024.
Jennifer Hartzell,
Alternate Federal Register Liaison Officer,
U.S. Department of Energy.
[FR Doc. 2024–24167 Filed 10–17–24; 8:45 am]
BILLING CODE 6450–01–P
VerDate Sep<11>2014
16:48 Oct 17, 2024
Jkt 265001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP25–1–000]
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline;
Natural Gas Pipeline Company of
America, LLC
Take notice that on October 2, 2024,
Natural Gas Pipeline Company of
America, LLC (Natural), 3250 Lacey
Road, Suite 700, Downers Grove, Illinois
60515, filed in the above referenced
docket, a prior notice request pursuant
to sections 157.205 and 157.216(b) of
the Commission’s regulations under the
Natural Gas Act (NGA), and Natural’s
blanket certificate issued in Docket No.
CP82–402–000, for authorization to
abandon in-place three compressor
units (Units 1–3) and the related
appurtenant facilities at its Compressor
Station 342 located in Cameron Parish,
Louisiana. The estimated cost for the
project is $399,000, all as more fully set
forth in the request which is on file with
the Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
Any questions concerning this request
should be directed to Francisco Tarin,
Director, Regulatory, Kinder Morgan,
Inc., as Operator of Natural Gas Pipeline
Company of America, LLC, 2 North
Nevada Avenue, Colorado Springs,
Colorado 80903, by phone at (719) 667–
7517, or by email at francisco_tarin@
kindermorgan.com.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
83869
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on December 10, 2024.
How to file protests, motions to
intervene, and comments is explained
below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is December
10, 2024. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
2 Persons
E:\FR\FM\18OCN1.SGM
18OCN1
83870
Federal Register / Vol. 89, No. 202 / Friday, October 18, 2024 / Notices
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is December 10,
2024. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
khammond on DSKJM1Z7X2PROD with NOTICES
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before December
10, 2024. The filing of a comment alone
will not serve to make the filer a party
to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP25–1–000 in your submission.
4 18
5 18
CFR 385.214.
CFR 157.10.
VerDate Sep<11>2014
16:48 Oct 17, 2024
Jkt 265001
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP25–1–000.
To file via USPS: Debbie-Anne A.
Reese, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
To file via any other method: DebbieAnne A. Reese, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail at: Francisco Tarin, Director,
Regulatory, Kinder Morgan, Inc., as
Operator of Natural Gas Pipeline
Company of America, LLC, 2 North
Nevada Avenue, Colorado Springs,
Colorado 80903, or by email at
francisco_tarin@kindermorgan.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
6 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: October 11, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–24170 Filed 10–17–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF24–6–000]
Great Basin Gas Transmission
Company; Notice of Scoping Period
Requesting Comments on
Environmental Issues for the Planned
Gabbs Lateral FNAS Relocation
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document, that will
discuss the environmental impacts of
the Gabbs Lateral FNAS Project (Project)
involving construction and operation of
facilities by Great Basin Gas
Transmission Company (Great Basin) in
Mineral and Nye Counties, Nevada. The
Commission will use this environmental
document in its decision-making
process to determine whether the
Project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
Project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
from its action whenever it considers
the issuance of a Certificate of Public
Convenience and Necessity. This
gathering of public input is referred to
as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the environmental document on the
important environmental issues.
Additional information about the
Commission’s NEPA process is
described below in the NEPA Process
and Environmental Document section of
this notice.
E:\FR\FM\18OCN1.SGM
18OCN1
Agencies
[Federal Register Volume 89, Number 202 (Friday, October 18, 2024)]
[Notices]
[Pages 83869-83870]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-24170]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP25-1-000]
Notice of Request Under Blanket Authorization and Establishing
Intervention and Protest Deadline; Natural Gas Pipeline Company of
America, LLC
Take notice that on October 2, 2024, Natural Gas Pipeline Company
of America, LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove,
Illinois 60515, filed in the above referenced docket, a prior notice
request pursuant to sections 157.205 and 157.216(b) of the Commission's
regulations under the Natural Gas Act (NGA), and Natural's blanket
certificate issued in Docket No. CP82-402-000, for authorization to
abandon in-place three compressor units (Units 1-3) and the related
appurtenant facilities at its Compressor Station 342 located in Cameron
Parish, Louisiana. The estimated cost for the project is $399,000, all
as more fully set forth in the request which is on file with the
Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov). From
the Commission's Home Page on the internet, this information is
available on eLibrary. The full text of this document is available on
eLibrary in PDF and Microsoft Word format for viewing, printing, and/or
downloading. To access this document in eLibrary, type the docket
number excluding the last three digits of this document in the docket
number field.
User assistance is available for eLibrary and the Commission's
website during normal business hours from FERC Online Support at (202)
502-6652 (toll free at 1-866-208-3676) or email at
[email protected], or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the Public Reference Room at
[email protected].
Any questions concerning this request should be directed to
Francisco Tarin, Director, Regulatory, Kinder Morgan, Inc., as Operator
of Natural Gas Pipeline Company of America, LLC, 2 North Nevada Avenue,
Colorado Springs, Colorado 80903, by phone at (719) 667-7517, or by
email at [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on December 10, 2024.
How to file protests, motions to intervene, and comments is explained
below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is December 10, 2024. A protest may also
serve as a motion to intervene so long as the protestor states it also
seeks to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders
[[Page 83870]]
issued in this proceeding and to subsequently challenge the
Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is December 10, 2024. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before December 10, 2024. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP25-1-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP25-1-000.
To file via USPS: Debbie-Anne A. Reese, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other method: Debbie-Anne A. Reese, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail at: Francisco Tarin, Director, Regulatory, Kinder
Morgan, Inc., as Operator of Natural Gas Pipeline Company of America,
LLC, 2 North Nevada Avenue, Colorado Springs, Colorado 80903, or by
email at [email protected]. Any subsequent submissions
by an intervenor must be served on the applicant and all other parties
to the proceeding. Contact information for parties can be downloaded
from the service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: October 11, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-24170 Filed 10-17-24; 8:45 am]
BILLING CODE 6717-01-P