Great Basin Gas Transmission Company; Notice of Scoping Period Requesting Comments on Environmental Issues for the Planned Gabbs Lateral FNAS Relocation Project, 83870-83873 [2024-23847]

Download as PDF 83870 Federal Register / Vol. 89, No. 202 / Friday, October 18, 2024 / Notices issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is December 10, 2024. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. khammond on DSKJM1Z7X2PROD with NOTICES Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before December 10, 2024. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP25–1–000 in your submission. 4 18 5 18 CFR 385.214. CFR 157.10. VerDate Sep<11>2014 16:48 Oct 17, 2024 Jkt 265001 (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 6 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP25–1–000. To file via USPS: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To file via any other method: DebbieAnne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail at: Francisco Tarin, Director, Regulatory, Kinder Morgan, Inc., as Operator of Natural Gas Pipeline Company of America, LLC, 2 North Nevada Avenue, Colorado Springs, Colorado 80903, or by email at francisco_tarin@kindermorgan.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal 6 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: October 11, 2024. Debbie-Anne A. Reese, Secretary. [FR Doc. 2024–24170 Filed 10–17–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF24–6–000] Great Basin Gas Transmission Company; Notice of Scoping Period Requesting Comments on Environmental Issues for the Planned Gabbs Lateral FNAS Relocation Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental document, that will discuss the environmental impacts of the Gabbs Lateral FNAS Project (Project) involving construction and operation of facilities by Great Basin Gas Transmission Company (Great Basin) in Mineral and Nye Counties, Nevada. The Commission will use this environmental document in its decision-making process to determine whether the Project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies regarding the Project. As part of the National Environmental Policy Act (NEPA) review process, the Commission takes into account concerns the public may have about proposals and the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. This gathering of public input is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the environmental document on the important environmental issues. Additional information about the Commission’s NEPA process is described below in the NEPA Process and Environmental Document section of this notice. E:\FR\FM\18OCN1.SGM 18OCN1 khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 89, No. 202 / Friday, October 18, 2024 / Notices By this notice, the Commission requests public comments on the scope of issues to address in the environmental document. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00 p.m. Eastern Time on Nov 8, 2024. Comments may be submitted in written form. Further details on how to submit comments are provided in the Public Participation section of this notice. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the environmental document. Commission staff will consider all written comments during the preparation of the environmental document. If you submitted comments on this Project to the Commission before the opening of this docket on July 9, 2024, you will need to file those comments in Docket No. PF24–6–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this Project. State and local government representatives should notify their constituents of this proposed Project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the Project, the Natural Gas Act conveys the right of eminent domain to the company. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. The Commission does not subsequently grant, exercise, or oversee the exercise of that eminent domain authority. The courts have exclusive authority to handle eminent domain cases; the Commission has no jurisdiction over these matters. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ addresses typically asked VerDate Sep<11>2014 16:48 Oct 17, 2024 Jkt 265001 questions, including the use of eminent domain and how to participate in the Commission’s proceedings. This fact sheet along with other landowner topics of interest are available for viewing on the FERC website (www.ferc.gov) under the Natural Gas, Landowner Topics link. Public Participation There are three methods you can use to submit your comments to the Commission. Please carefully follow these instructions so that your comments are properly recorded. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. (1) You can file your comments electronically using the eComment feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. Using eComment is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; a comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the Project docket number (PF24–6–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Additionally, the Commission offers a free service called eSubscription which makes it easy to stay informed of all issuances and submittals regarding the dockets/projects to which you subscribe. These instant email notifications are the fastest way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. Go to https:// www.ferc.gov/ferc-online/overview to register for eSubscription. PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 83871 The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Summary of the Proposed Project Great Basin plans to relocate the Gabbs Lateral in Mineral and Nye Counties, Nevada from its current location on the United States Navy’s Fallon Naval Air Station to an area outside of the expanded footprint of the range training complex. The Project would not provide any incremental capacity. The Project would consist of the following facilities and activities: • construction of about 33 miles of new 8-inch-diameter (18.8 miles) and 6inch-diameter (13.8 miles) pipeline; • abandonment in-place or by removal of about 21 miles of 8-inchdiameter (18.5 miles) and 6-inchdiameter (2.4 miles) pipeline on Great Basin’s Gabbs Lateral; • relocation of the Sheelite rectifier; • replacement of a thermoelectric generator for the cathodic protection system; and • installation of two aboveground valve assemblies. The general location of the Project facilities is shown in appendix 1.1 Land Requirements for Construction Construction of the planned facilities would disturb about 558 acres of land. Following construction, Great Basin would maintain about 240 acres for permanent operation of the project’s facilities; the remaining temporary workspaces would be restored and revert to former uses. Great Basin plans to abandon about 127 acres of land and grant possession to the Navy. All work is expected to occur within land managed by the Bureau of Land Management. 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’. For instructions on connecting to eLibrary, refer to the last page of this notice. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll free, (886) 208–3676 or TTY (202) 502–8659. E:\FR\FM\18OCN1.SGM 18OCN1 83872 Federal Register / Vol. 89, No. 202 / Friday, October 18, 2024 / Notices khammond on DSKJM1Z7X2PROD with NOTICES NEPA Process and the Environmental Document Any environmental document issued by Commission staff will discuss impacts that could occur as a result of the construction and operation of the planned Project under the relevant general resource areas: • geology and soils; • water resources and wetlands; • vegetation and wildlife; • threatened and endangered species; • cultural resources; • land use and visual resources; • socioeconomics and traffic; • environmental justice; • air quality and noise; and • reliability and safety. Commission staff will also evaluate reasonable alternatives to the planned Project or portions of the Project and make recommendations on how to lessen or avoid impacts on the various resource areas. Your comments will help Commission staff identify and focus on the issues that might have an effect on the human environment and potentially eliminate others from further study and discussion in the environmental document. Although no formal application has been filed, Commission staff have already initiated a NEPA review under the Commission’s pre-filing process. The purpose of the pre-filing process is to encourage early involvement of interested stakeholders and to identify and resolve issues before the Commission receives an application. As part of the pre-filing review, Commission staff will contact federal and state agencies to discuss their involvement in the scoping process and the preparation of the environmental document. If a formal application is filed, Commission staff will then determine whether to prepare an Environmental Assessment (EA) or an Environmental Impact Statement (EIS). The EA or the EIS will present Commission staff’s independent analysis of the environmental issues. If Commission staff prepares an EA, a Notice of Schedule for the Preparation of an Environmental Assessment will be issued. The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its determination on the proposed project. If Commission staff prepares an EIS, a Notice of Intent to Prepare an EIS/ Notice of Schedule will be issued once an application is filed, which will open an additional public comment period. Staff will then prepare a draft EIS that will be issued for public comment. VerDate Sep<11>2014 16:48 Oct 17, 2024 Jkt 265001 Commission staff will consider all timely comments received during the comment period on the draft EIS, and revise the document, as necessary, before issuing a final EIS. Any EA or draft and final EIS will be available in electronic format in the public record through eLibrary 2 and the Commission’s natural gas environmental documents web page (https://www.ferc.gov/industries-data/ natural-gas/environment/ environmental-documents). If eSubscribed, you will receive instant email notification when the environmental document is issued. With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues of this Project to formally cooperate in the preparation of the environmental document.3 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Currently, the Bureau of Land Management has expressed their intention to participate as a cooperating agency in the preparation of the environmental document to satisfy their NEPA responsibilities related to this project. Consultation Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Office(s), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the Project’s potential effects on historic properties.4 The environmental document for this Project will document findings on the impacts on historic properties and summarize the status of consultations under section 106. Environmental Mailing List The environmental mailing list includes federal, state, and local 2 For instructions on connecting to eLibrary, refer to the last page of this notice. 3 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Section 1501.8. 4 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project and includes a mailing address with their comments. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that Commission notices related to this environmental review are sent to all individuals, organizations, and government entities interested in and/or potentially affected by the planned project. If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please complete one of the following steps: (1) Send an email to GasProjectAddressChange@ferc.gov stating your request. You must include the docket number PF24–6–000 in your request. If you are requesting a change to your address, please be sure to include your name and the correct address. If you are requesting to delete your address from the mailing list, please include your name and address as it appeared on this notice. This email address is unable to accept comments. OR (2) Return the attached ‘‘Mailing List Update Form’’ (appendix 2). Becoming an Intervenor Once Great Basin files its application with the Commission, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Only intervenors have the right to seek rehearing of the Commission’s decision and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR 385.214). Motions to intervene are more fully described at https://www.ferc.gov/how-intervene. Please note that the Commission will not accept requests for intervenor status at this time. You must wait until the Commission receives a formal application for the project, after which the Commission will issue a public E:\FR\FM\18OCN1.SGM 18OCN1 Federal Register / Vol. 89, No. 202 / Friday, October 18, 2024 / Notices notice that establishes an intervention deadline. Additional Information Additional information about the Project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. Public sessions or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/newsevents/events along with other related information. Debbie-Anne A. Reese, Secretary. [FR Doc. 2024–23847 Filed 10–17–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP24–529–000] khammond on DSKJM1Z7X2PROD with NOTICES Notice of Application and Establishing Intervention Deadline; Tennessee Gas Pipeline, L.L.C. Take notice that on September 30, 2024, Tennessee Gas Pipeline, L.L.C. (Tennessee), 1001 Louisiana Street, Suite 1000, Houston, Texas 77002, filed an application under section 7(b) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations requesting authorization for its 507G Line Abandonment Project (Project). The Project consists of the abandonment in place and by removal of a portion of Tennessee’s mainline pipeline, Line 507G–100, consisting of approximately 75.38 miles of 16-inch-diameter pipeline and associated appurtenances; and the abandonment of a pipeline supply lateral, Line 507G–500, consisting of approximately 9.05 miles of 12-inch-diameter pipeline and associated appurtenances. The Project facilities are located in Acadia, Vermilion, Iberia, and St. Mary Parishes, Louisiana. Tennessee estimates the total cost of the Project to be $46.4 million, all as more fully set forth in the VerDate Sep<11>2014 16:48 Oct 17, 2024 Jkt 265001 application which is on file with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov). From the Commission’s Home Page on the internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field. User assistance is available for eLibrary and the Commission’s website during normal business hours from FERC Online Support at 202–502–6652 (toll free at 1–866–208–3676) or email at ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502– 8371, TTY (202) 502–8659. Email the Public Reference Room at public.referenceroom@ferc.gov. Any questions regarding the proposed project should be directed to Tina Hardy, Director of Regulatory, Tennessee Gas Pipeline, L.L.C., 569 Brookwood Village, Suite 600, Birmingham, Alabama 35209, by phone at (205) 325–3668, or by email at tina_ hardy@kindermorgan.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. 1 18 PO 00000 CFR (Code of Federal Regulations) 157.9. Frm 00048 Fmt 4703 Sfmt 4703 83873 Public Participation There are three ways to become involved in the Commission’s review of this project: you can file comments on the project, you can protest the filing, and you can file a motion to intervene in the proceeding. There is no fee or cost for filing comments or intervening. The deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on November 1, 2024. How to file protests, motions to intervene, and comments is explained below. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Comments Any person wishing to comment on the project may do so. Comments may include statements of support or objections, to the project as a whole or specific aspects of the project. The more specific your comments, the more useful they will be. Protests Pursuant to sections 157.10(a)(4) 2 and 385.211 3 of the Commission’s regulations under the NGA, any person 4 may file a protest to the application. Protests must comply with the requirements specified in section 385.2001 5 of the Commission’s regulations. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. To ensure that your comments or protests are timely and properly recorded, please submit your comments on or before November 1, 2024. There are three methods you can use to submit your comments or protests to the Commission. In all instances, please reference the Project docket number CP24–529–000 in your submission. (1) You may file your comments electronically by using the eComment feature, which is located on the 2 18 CFR 157.10(a)(4). CFR 385.211. 4 Persons include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 5 18 CFR 385.2001. 3 18 E:\FR\FM\18OCN1.SGM 18OCN1

Agencies

[Federal Register Volume 89, Number 202 (Friday, October 18, 2024)]
[Notices]
[Pages 83870-83873]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-23847]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF24-6-000]


Great Basin Gas Transmission Company; Notice of Scoping Period 
Requesting Comments on Environmental Issues for the Planned Gabbs 
Lateral FNAS Relocation Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental document, that will discuss 
the environmental impacts of the Gabbs Lateral FNAS Project (Project) 
involving construction and operation of facilities by Great Basin Gas 
Transmission Company (Great Basin) in Mineral and Nye Counties, Nevada. 
The Commission will use this environmental document in its decision-
making process to determine whether the Project is in the public 
convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies regarding the Project. As part of the National Environmental 
Policy Act (NEPA) review process, the Commission takes into account 
concerns the public may have about proposals and the environmental 
impacts that could result from its action whenever it considers the 
issuance of a Certificate of Public Convenience and Necessity. This 
gathering of public input is referred to as ``scoping.'' The main goal 
of the scoping process is to focus the analysis in the environmental 
document on the important environmental issues. Additional information 
about the Commission's NEPA process is described below in the NEPA 
Process and Environmental Document section of this notice.

[[Page 83871]]

    By this notice, the Commission requests public comments on the 
scope of issues to address in the environmental document. To ensure 
that your comments are timely and properly recorded, please submit your 
comments so that the Commission receives them in Washington, DC on or 
before 5:00 p.m. Eastern Time on Nov 8, 2024. Comments may be submitted 
in written form. Further details on how to submit comments are provided 
in the Public Participation section of this notice.
    Your comments should focus on the potential environmental effects, 
reasonable alternatives, and measures to avoid or lessen environmental 
impacts. Your input will help the Commission staff determine what 
issues they need to evaluate in the environmental document. Commission 
staff will consider all written comments during the preparation of the 
environmental document.
    If you submitted comments on this Project to the Commission before 
the opening of this docket on July 9, 2024, you will need to file those 
comments in Docket No. PF24-6-000 to ensure they are considered as part 
of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this Project. State and local government 
representatives should notify their constituents of this proposed 
Project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the Project, the Natural Gas Act conveys the right of eminent 
domain to the company. Therefore, if you and the company do not reach 
an easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law. The Commission does 
not subsequently grant, exercise, or oversee the exercise of that 
eminent domain authority. The courts have exclusive authority to handle 
eminent domain cases; the Commission has no jurisdiction over these 
matters.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' addresses typically 
asked questions, including the use of eminent domain and how to 
participate in the Commission's proceedings. This fact sheet along with 
other landowner topics of interest are available for viewing on the 
FERC website (www.ferc.gov) under the Natural Gas, Landowner Topics 
link.

Public Participation

    There are three methods you can use to submit your comments to the 
Commission. Please carefully follow these instructions so that your 
comments are properly recorded. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. Using eComment is an easy method for 
submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; a comment on a particular project is considered a ``Comment 
on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the Project docket number (PF24-6-
000) on your letter. Submissions sent via the U.S. Postal Service must 
be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory 
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
    Additionally, the Commission offers a free service called 
eSubscription which makes it easy to stay informed of all issuances and 
submittals regarding the dockets/projects to which you subscribe. These 
instant email notifications are the fastest way to receive notification 
and provide a link to the document files which can reduce the amount of 
time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

Summary of the Proposed Project

    Great Basin plans to relocate the Gabbs Lateral in Mineral and Nye 
Counties, Nevada from its current location on the United States Navy's 
Fallon Naval Air Station to an area outside of the expanded footprint 
of the range training complex. The Project would not provide any 
incremental capacity.
    The Project would consist of the following facilities and 
activities:
     construction of about 33 miles of new 8-inch-diameter 
(18.8 miles) and 6-inch-diameter (13.8 miles) pipeline;
     abandonment in-place or by removal of about 21 miles of 8-
inch-diameter (18.5 miles) and 6-inch-diameter (2.4 miles) pipeline on 
Great Basin's Gabbs Lateral;
     relocation of the Sheelite rectifier;
     replacement of a thermoelectric generator for the cathodic 
protection system; and
     installation of two aboveground valve assemblies.
    The general location of the Project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all 
those receiving this notice in the mail and are available at 
www.ferc.gov using the link called ``eLibrary''. For instructions on 
connecting to eLibrary, refer to the last page of this notice. For 
assistance, contact FERC at [email protected] or call toll 
free, (886) 208-3676 or TTY (202) 502-8659.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the planned facilities would disturb about 558 
acres of land. Following construction, Great Basin would maintain about 
240 acres for permanent operation of the project's facilities; the 
remaining temporary workspaces would be restored and revert to former 
uses. Great Basin plans to abandon about 127 acres of land and grant 
possession to the Navy. All work is expected to occur within land 
managed by the Bureau of Land Management.

[[Page 83872]]

NEPA Process and the Environmental Document

    Any environmental document issued by Commission staff will discuss 
impacts that could occur as a result of the construction and operation 
of the planned Project under the relevant general resource areas:
     geology and soils;
     water resources and wetlands;
     vegetation and wildlife;
     threatened and endangered species;
     cultural resources;
     land use and visual resources;
     socioeconomics and traffic;
     environmental justice;
     air quality and noise; and
     reliability and safety.
    Commission staff will also evaluate reasonable alternatives to the 
planned Project or portions of the Project and make recommendations on 
how to lessen or avoid impacts on the various resource areas. Your 
comments will help Commission staff identify and focus on the issues 
that might have an effect on the human environment and potentially 
eliminate others from further study and discussion in the environmental 
document.
    Although no formal application has been filed, Commission staff 
have already initiated a NEPA review under the Commission's pre-filing 
process. The purpose of the pre-filing process is to encourage early 
involvement of interested stakeholders and to identify and resolve 
issues before the Commission receives an application. As part of the 
pre-filing review, Commission staff will contact federal and state 
agencies to discuss their involvement in the scoping process and the 
preparation of the environmental document.
    If a formal application is filed, Commission staff will then 
determine whether to prepare an Environmental Assessment (EA) or an 
Environmental Impact Statement (EIS). The EA or the EIS will present 
Commission staff's independent analysis of the environmental issues. If 
Commission staff prepares an EA, a Notice of Schedule for the 
Preparation of an Environmental Assessment will be issued. The EA may 
be issued for an allotted public comment period. The Commission would 
consider timely comments on the EA before making its determination on 
the proposed project. If Commission staff prepares an EIS, a Notice of 
Intent to Prepare an EIS/Notice of Schedule will be issued once an 
application is filed, which will open an additional public comment 
period. Staff will then prepare a draft EIS that will be issued for 
public comment. Commission staff will consider all timely comments 
received during the comment period on the draft EIS, and revise the 
document, as necessary, before issuing a final EIS. Any EA or draft and 
final EIS will be available in electronic format in the public record 
through eLibrary \2\ and the Commission's natural gas environmental 
documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you will receive 
instant email notification when the environmental document is issued.
---------------------------------------------------------------------------

    \2\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this Project to formally cooperate in the 
preparation of the environmental document.\3\ Agencies that would like 
to request cooperating agency status should follow the instructions for 
filing comments provided under the Public Participation section of this 
notice. Currently, the Bureau of Land Management has expressed their 
intention to participate as a cooperating agency in the preparation of 
the environmental document to satisfy their NEPA responsibilities 
related to this project.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Section 1501.8.
---------------------------------------------------------------------------

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Office(s), 
and to solicit their views and those of other government agencies, 
interested Indian tribes, and the public on the Project's potential 
effects on historic properties.\4\ The environmental document for this 
Project will document findings on the impacts on historic properties 
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project and includes a mailing address with their 
comments. Commission staff will update the environmental mailing list 
as the analysis proceeds to ensure that Commission notices related to 
this environmental review are sent to all individuals, organizations, 
and government entities interested in and/or potentially affected by 
the planned project.
    If you need to make changes to your name/address, or if you would 
like to remove your name from the mailing list, please complete one of 
the following steps:
    (1) Send an email to [email protected] stating your 
request. You must include the docket number PF24-6-000 in your request. 
If you are requesting a change to your address, please be sure to 
include your name and the correct address. If you are requesting to 
delete your address from the mailing list, please include your name and 
address as it appeared on this notice. This email address is unable to 
accept comments.

OR

    (2) Return the attached ``Mailing List Update Form'' (appendix 2).

Becoming an Intervenor

    Once Great Basin files its application with the Commission, you may 
want to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Only intervenors have the right to seek 
rehearing of the Commission's decision and be heard by the courts if 
they choose to appeal the Commission's final ruling. An intervenor 
formally participates in the proceeding by filing a request to 
intervene pursuant to Rule 214 of the Commission's Rules of Practice 
and Procedures (18 CFR 385.214). Motions to intervene are more fully 
described at https://www.ferc.gov/how-intervene. Please note that the 
Commission will not accept requests for intervenor status at this time. 
You must wait until the Commission receives a formal application for 
the project, after which the Commission will issue a public

[[Page 83873]]

notice that establishes an intervention deadline.

Additional Information

    Additional information about the Project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number 
in the ``Docket Number'' field. Be sure you have selected an 
appropriate date range. For assistance, please contact FERC Online 
Support at [email protected] or (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of all formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    Public sessions or site visits will be posted on the Commission's 
calendar located at https://www.ferc.gov/news-events/events along with 
other related information.

Debbie-Anne A. Reese,
Secretary.